Routine Maintenance, Construction, and Repair The NYISO or Connecting Transmission Owner may interrupt interconnection service or curtail the output of the Small Generating Facility and temporarily disconnect the Small Generating Facility from the New York State Transmission System or Distribution System when necessary for routine maintenance, construction, and repairs on the New York State Transmission System or Distribution System. The NYISO or the Connecting Transmission Owner shall provide the Interconnection Customer with five Business Days notice prior to such interruption. The NYISO and Connecting Transmission Owner shall use Reasonable Efforts to coordinate such reduction or temporary disconnection with the Interconnection Customer.
Maintenance, Alteration and Repair (a) Resident is responsible for and agrees to take good care of the premises, fixtures and all common areas. Resident may not remove any of Owner’s property and will not perform any repairs, upgrades, painting, wallpapering, electric changes or other alterations of the premises without prior written consent from Owner. Resident will be responsible for damage from waste stoppages caused by foreign or improper objects or improper use in lines serving bathrooms, damage to fixtures, appliances, doors, windows, screens, damage from water faucets left on or from doors left open, and repairs or replacements to alarm devices necessitated by misuse or damage by Resident and/or guests. Extraordinary appliances or furnishings such as satellite dishes, hot tubs, pool tables, water beds or high utility- consuming devices may not be installed or placed on the premises or anywhere at the Property without Owner’s prior written consent, in its sole discretion. (b) In the case of a malfunction of any utilities or damage by fire, water or similar cause, or any water leak, suspected mold or microbial growth, electrical problem, broken glass, broken lock or any other condition that Resident reasonably believes poses a hazard to health and safety, Resident must promptly notify Owner in writing. Owner will act with reasonable time and diligence in making repairs and reconnections; Resident may not withhold or reduce payment of rent or other charges during such time. Maintenance and repair requested by Resident will generally be performed between 8am and 8pm, unless the work is considered an emergency, in which case work may take place at any time. Owner may temporarily disconnect equipment or utilities to avoid property damage and/or to perform repairs requiring such interruption, in Owner’s sole discretion. Owner will not be liable for any inconvenience, discomfort, disruption or interference with Resident use of the premises because of ongoing repairs, alterations or improvements to the Property or any apartment. (c) Following move-in, Resident is responsible for providing and changing all light bulbs and batteries (for smoke detectors and remote controls) in the assigned apartment. A written maintenance report requesting assistance in changing these items may be submitted for maintenance staff assistance, with extra charges payable by Resident as applicable per Owner’s published rates. From time to time, maintenance staff may enter the assigned apartment with or without notice to inspect and change furnace filters and to provide pest control.
Alterations and Repairs Lessee shall not make or permit to be made any other alterations, additions, improvements, or changes (collectively, “Alterations”), in the premises, without Lessor’s prior written approval, which approval Lessor may withhold in Lessor’s sole discretion. Subject to the services to be rendered by Lessor as set forth in the Schedule, Lessee shall, at Lessee’s expense, keep the premises generally consistent with the standard maintained by other tenants of premises in the Building during the tenancy. If Lessee does not make repairs promptly and adequately, Lessor may, but need not, make repairs, and Lessee shall pay promptly the reasonable cost thereof. At any time or times, Lessor, either voluntarily or pursuant to governmental requirement, may, at Lessor’s expense, make repairs, alterations, or improvements in or to the Building or any part thereof, including the premises, and, during such operations Lessor may close entrances, doors, corridors, elevators, or other facilities, all without any liability to Lessee or deduction of rent by reason of interference, inconvenience, or annoyance; provided that Lessee shall have access to the premises sufficient for conduct of Lessee’s business. Lessor shall not be liable to Lessee for any expense, injury, loss, or damage resulting from work done in or upon, or the use of, any adjacent or nearby building, land, street, or alley, provided that Lessor makes a reasonable effort to minimize the disruption to Lessee’s business. In the event Lessee requests that repairs, alterations, decorating, or other work in the premises be made during periods other than ordinary business hours, Lessee shall pay Lessor for overtime and other additional expenses incurred because of such request.
Maintenance and Repairs (1) Except for matters specified under Paragraph 4 above and Paragraph 8A(3) below as being Landlord's obligation, Tenant shall, at Tenant's sole cost and expense, maintain the Premises in good order, condition and repair, ordinary wear and tear and damage by fire and casualty excepted, including: the interior surfaces of the ceilings, walls and floors; all doors and interior windows; furnishings installed within the Premises; all equipment installed by or at the expense of Tenant; and all plumbing, heating, ventilating, electrical and lighting facilities and fixtures; all landscaping, parking lots, fences and signs located within the Premises. (2) In the event that Tenant fails to maintain the Premises in good order, condition and repair as required under this Lease, Landlord shall give Tenant prior written notice to do such acts as are required to so maintain the Premises. In the event that Tenant fails to commence such work within 30 days after written demand by Landlord, and diligently prosecute it to completion, then Landlord shall have the right, but shall not be obligated, to do such acts and expend such funds at the expense of Tenant as are reasonably required to perform such work. Landlord shall have no liability to Tenant for any reasonable damage, inconvenience or interference with Tenant's use of the Premises as a result of performing any such work. (3) Landlord will maintain, repair and replace all structural components of the Premises and the roof of the Building, and if a repair, replacement or alteration or other change would be considered a capital improvement or replacement to the Premises under generally accepted accounting principles, then it shall be Landlord's responsibility to promptly make and pay for such repair, replacement, alteration or other change. The cost of any such capital improvement shall be amortized over the useful life of such item and Tenant agrees to pay its percentage share (which shall be determined by dividing the square footage of the Building by the square footage of all buildings benefitted by such improvement, including the Building) of the annual amortized amount. Such payment will be made by Tenant as set forth in Paragraph 4 above. Landlord shall do all acts required to comply with all applicable laws, ordinances, regulations and rules of any public authority relating to the Premises, except to the extent that the foregoing are solely a result of Tenant's use of the Premises. Tenant shall do all acts required to comply with all applicable laws, ordinances, regulations and rules of any public authority relating solely to Tenant's use of the Premises. If a repair is required as a result of Tenant's negligence and such repair cost is not covered by insurance proceeds, Tenant will pay for the cost of such repair. Notwithstanding anything in this Lease to the contrary, in the event that the need for repairs or the making of repairs (or both) which Landlord is obligated to effect at Landlord's expense renders a material portion of the Premises unusable for more than three consecutive business days, then Tenant shall be entitled to an abatement of rent commencing with the fourth business day that the same are unusable; provided, however, that Tenant shall not be entitled to a pro rata abatement of rent under the foregoing due to unusability (i) caused directly or indirectly by any act or omission of Tenant or any of Tenant's servants, employees, agents, contractors, visitors or licensees, (ii) where Tenant makes a decoration, alteration, improvement or addition which directly causes such unusability, or (iii) where the repair in question is one which Tenant is obligated to furnish under the provisions of this Lease.
Maintenance and Repair (a) Subject to Landlord’s limited obligations under subparagraph 6(a), by taking possession of the Premises, Tenant shall be deemed to have accepted the Premises as being in good order, condition and repair. Tenant shall, at Tenant’s sole cost and expense, keep the Premises and every part thereof in good condition and repair, including without limitation, the maintenance, repair and replacement of any storefront, doors, window casements, glazing, plumbing, pipes, electrical wiring and conduits, and the heating and air conditioning (“HVAC”) system. Tenant shall obtain a service contract for repairs and maintenance of the HVAC system and shall provide to Landlord a copy of the service contract along with written details of any and all scheduled and other repairs and maintenance performed on the HVAC system within ten (10) days of the date of such performance. Tenant shall, upon the expiration or sooner termination of this Lease, surrender the Premises to Landlord in good condition, broom clean, ordinary wear and tear and damage subject to Paragraph 24 excepted. Except for damage subject to Paragraph 24, any damage caused by Tenant’s use of the Premises shall be repaired at the sole cost and expense of Tenant. (b) Except as specifically provided in subparagraph 6(a) above, Tenant shall repair and maintain the structural portions of the Building, including the exterior walls and roof. Landlord shall not be liable for Tenant’s failure to make such repairs or to perform any maintenance. There shall be no abatement of Rent and no liability of Landlord by reason of any injury to or interference with Tenant’s business arising from the making of any repairs, alterations or improvements in or to any portion of the Building or the Premises or in or to fixtures, appurtenances and equipment therein. Tenant waives any right to make repairs at Landlord’s expense under any law, statute or ordinance now or hereafter in effect. (c) If Tenant refuses or neglects to repair or maintain the Premises, as required herein, to the reasonable satisfaction of Landlord, Landlord shall provide Tenant with written notice of any such refusal or neglect and Tenant shall repair any item mentioned in said notice within thirty (30) days thereafter. If Tenant has not made such repairs within the 30-day period, Landlord may make such repairs without liability to the Tenant for any loss or damage it may accrue to Tenant’s merchandise, fixtures or other property or to Tenant’s business by reason thereof and, upon completion thereof, Tenant shall pay Landlord’s costs for making such repairs upon presentation of a xxxx thereof. In the event Tenant does not pay such xxxx within ten (10) days of its receipt, such failure shall be an event of default hereunder, Landlord shall be entitled to utilize all of its remedies herein and such amount shall bear interest at the rate of eighteen percent (18%) per annum from the date of the notice. Notwithstanding the foregoing, in the event that Tenant in good faith disputes Landlord’s claim that Tenant has failed to repair or maintain any aspect of the Premises, then if Landlord makes any repairs, Tenant shall not be obligated to pay for the repairs or any interest thereon until the dispute is finally determined; provided, that Tenant shall deposit the disputed amount with the Landlord until the dispute is resolved.
Construction of the Project Highway (i) The Contractor shall construct the Project Highway as specified in Schedule- B and Schedule-C, and in conformity with the Specifications and Standards set forth in Schedule-D. The Contractor shall be responsible for the correct positioning of all parts of the Works, and shall rectify any error in the positions, levels, dimensions or alignment of the Works. The [650th (six hundred and fiftieth) day] from the Appointed Date shall be the scheduled completion date (the “Scheduled Completion Date”) and the Contractor agrees and undertakes that the construction shall be completed on or before the Scheduled Completion Date, including any extension thereof. (ii) The Contractor shall construct the Project Highway in accordance with the Project Completion Schedule set forth in Schedule-J. In the event that the Contractor fails to achieve any Project Milestone or the Scheduled Completion Date within a period of 30 (thirty) days from the date set forth in Schedule-J, unless such failure has occurred due to Force Majeure or for reasons solely attributable to the Authority, it shall pay Damages to the Authority of a sum calculated at the rate of 0.05% (zero point zero five percent) of the Contract Price for delay of each day reckoned from the date specified in Schedule –J and until such Project Milestone is achieved or the Project Highway is completed; provided that if the period for any or all Project Milestones or the Scheduled Completion Date is extended in accordance with the provisions of this Agreement, the dates set forth in Schedule-J shall be deemed to be modified accordingly and the provisions of this Agreement shall apply as if Schedule-J has been amended as above; provided further that in the event the Project Highway is completed within or before the Scheduled Completion Date including any Time Extension, applicable for that work or section, the Damages paid under this Clause 10.3 (ii) shall be refunded by the Authority to the Contractor, but without any interest thereon. The Parties agree that for determining achievement or delays in completion of the Project Milestones or the Project on the due date, the works affected due to delay in providing the site for which time extension has been granted beyond the Scheduled Completion Date will be excluded. For example on the due date to achieve the Project Milestone-I (i.e., Stage Payments of 10% (ten percent) of Contract Price on 180th (one hundred and eighty) day from the Appointed Date), if 5% (five percent) of the project length corresponding to the Project Milestone-I is not handed over or lately handed over resulting in the extension of completion of this 5% (five percent) length beyond Scheduled Completion Date, Stage Payment of 10% X 0.95 = 9.5% only is to be achieved by 180th (one hundred and eighty) day. For the avoidance of doubt, it is agreed that recovery of Damages under this Clause 10.3 (ii) shall be without prejudice to the rights of the Authority under this Agreement including the right of Termination thereof. The Partiesfurther agree that Time Extension hereunder shall only be reckoned for and in respect of the affected Works as specified in Clause 10.5 (ii). (iii) The Authority shall notify the Contractor of its decision to impose Damages in pursuance with the provisions of this Clause 10.3. Provided that no deduction on account of Damages shall be effected by the Authority without notifying the Contractor of its decision to impose the Damages, and taking into consideration the representation, if any, made by the Contractor within 20 (twenty) days of such notice. The Parties expressly agree that the total amount of Damages under Clause 10.3 (ii) shall not exceed 10% (ten percent) of the Contract Price. If the damages exceed 10% (ten percent) of the Contract Price, the Contractor shall be deemed to be in default of this agreement having no cure and the Authority shall be entitled to terminate this Agreement by issuing a Termination Notice in accordance with the provisions of Clause 23.1 (ii). (iv) In the event that the Contractor fails to achieve the Project Completion within a period of 90 (ninety) days from the Schedule Completion Date set forth in Schedule-J, unless such failure has occurred due to Force Majeure or for reasons solely attributable to the Authority, the contractor shall be deemed to be ineligible for bidding any future projects of the Authority, both as the sole party or as one of the parties of Joint Venture/ Consortium during the period from Scheduled Completion Date to issuance of Completion Certificate. This restriction is applicable if the contract value of the delayed project is not less than Rs. 300 Crore.
Repair Concessionaire shall, prior to the commencement of the Concession Operation under this Agreement, provide to Department a type-written concession equipment maintenance plan for the State-owned equipment located on the Concession Premises, together with a schedule for preventative maintenance and a report on maintenance completion and equipment condition. Failure to comply with this preventative maintenance schedule shall result in Concessionaire being responsible for all repairs and/or replacement of equipment. The review and Department inspection of the Concession Premises and its equipment will be conducted during routine inspection of the Concession Premises and as a part of the Mandatory Compliance and Performance Evaluation Meetings.
Repairs and Maintenance (a) Except for the obligations of Landlord pursuant to Section 9(b) of this Lease and except as caused by the negligence or willful misconduct of Landlord or its agents, contractors, servants, invitees or employees or Landlord’s default hereunder, Tenant shall keep, maintain, and repair or cause to be repaired and maintained, at its sole cost and expense, the Premises, including, without limitation: HVAC, mechanical and electrical equipment and all systems in or serving the Premises, the Utility Infrastructure, the Critical Fixtures and Equipment, parking areas, sidewalks, roadways and landscaping, in good repair and condition and appearance, normal wear and tear excepted, and shall make all repairs and replacements which may be required to be made in order to keep and maintain the Premises, including without limitation, the Utility Infrastructure and Critical Fixtures and Equipment, in as good repair and appearance as they were when originally delivered to Tenant, except for ordinary wear and tear and subject to the provisions of Section 13 and Section 14 hereof, and Tenant shall, in all events, make all repairs, replacements and perform maintenance and other work for which it is responsible hereunder, in a good, proper and workmanlike manner in accordance with customary standards for first-class data centers. (b) Subject to the provisions of Section 13 and Section 14 hereof, Landlord shall make all necessary roof repairs and structural repairs to the Premises including those repairs and replacements necessary to keep the roof, exterior walls, foundation and structural frame of the Premises in good order and repair and perform such repairs in accordance with customary standards for first-class data centers. Landlord shall initiate all such repairs promptly and to remedy any condition requiring repair by Landlord with due diligence. (c) If Tenant shall be in default under any of the provisions of this Section 9, Landlord may, after thirty (30) days written notice to Tenant and failure of Tenant to cure during said period unless such default is of such a nature that it cannot with reasonable diligence be cured within said period, then the cure period shall be extended by such period as may be required with the application of reasonable diligence to cure the default, but without notice in the event of an emergency, do whatever is necessary to cure such default as may be appropriate under the circumstances for the account of and at the expense of Tenant. If an emergency exists, Landlord shall use reasonable efforts to notify Tenant of the situation by phone or other available communication before taking any such action to cure such default. All reasonable sums so paid by Landlord or Tenant, as applicable, and all reasonable costs and expenses (including, without limitation, reasonable attorneys’ fees and expenses) so incurred, together with interest at the Lease Default Rate from the date of payment or incurring of the expense, shall constitute Additional Rent payable by Tenant under this Lease and shall be paid by Tenant to Landlord on demand. (d) If Landlord shall be in default under any of the provisions of this Section 9, Tenant may, after thirty (30) days written notice to Landlord and failure of Landlord to cure during said period unless such default is of such a nature that it cannot with reasonable diligence be cured within said period, then the cure period shall be extended by such period as may be required with the application of reasonable diligence to cure the default, but without notice in the event of an emergency, do whatever is necessary to cure such default as may be appropriate under the circumstances for the account of and at the expense of Landlord. If an emergency exists, Tenant shall use reasonable efforts to notify Landlord of the situation by phone or other available communication before taking any such action to cure such default. All reasonable sums so paid by Tenant and all reasonable costs and expenses (including, without limitation, reasonable attorneys’ fees and expenses) so incurred, together with interest at the Lease Default Rate from the date of payment or incurring of the expense, shall constitute amounts payable by Landlord under this Lease and shall be paid by Landlord to Tenant on demand. (e) Without limiting the generality of the foregoing, Tenant shall additionally perform, at its cost and expense, all maintenance, repair, and replacement obligations hereunder relating to any of the Building’s systems, the Building’s elevators, the Utility Infrastructure, or the Critical Fixtures and Equipment. In addition, in connection with Tenant’s maintenance, repair, and replacement obligations under this Lease, Tenant shall at its own cost and expense enter into regularly scheduled preventative maintenance service contracts, with vendors, approved by Landlord, in its reasonable discretion, for servicing all Building systems, Utility Infrastructure, elevators, and Critical Fixtures and Equipment. Tenant shall cause such maintenance contracts to designate Landlord a third (3rd) party beneficiary, with the right to receive all notices delivered under such contracts, and the ability to exercise Tenant’s rights thereunder upon Tenant’s default under this Section 9 or upon Tenant’s default under an applicable maintenance contract. (f) In the event of an emergency adversely affecting the structure of the Premises, Tenant shall make all reasonable efforts to inform Landlord of the emergency. If Tenant is unable to make contact with Landlord or Landlord does not, within a reasonable amount of time, take actions necessary to end such emergency, Tenant may take the minimum steps reasonably necessary to end the emergency at Landlord’s expense. All reasonable sums paid by Tenant in taking such actions as are permitted by the provisions of Section 9(f) above shall be paid by Landlord within thirty (30) days after receipt of Tenant’s demand therefor. After the emergency has ended, any repair required of Landlord under this Lease shall be made by Landlord in accordance with the terms of this Lease and any repair required of Tenant under this Lease shall be made by Tenant in accordance with the terms of this Lease.
Project Construction The Contractor agrees to provide continuous on-site supervision on each Job Order, while progress on the project is being accomplished. The Contractor’s Project Manager will ensure: 1. Coordination and providing supervision to all Subcontractor and workers; 2. Posting of the prevailing wage scale; 3. Maintaining a copy of the Contractors safety program manual made available to all construction personnel; 4. Conducting weekly on-site safety meetings; 5. Completing the daily labor and construction progress log on a daily basis and submit copies to the County on a daily basis. Copies of the previous day’s reports must be submitted by 9:00AM of the following day. a. Daily labor log is to include a listing of Subcontractor(s) and a count of workers by trade providing services for the day. b. Construction progress log is to include a narrative of the Work provided by trade(s). Narrative agrees to include the various areas of the jobsite where Work was performed and any problems or conditions that were encountered. c. In the event the Contractor fails to provide a daily log and/or construction progress log, the County may impose damages against the Contractor in the amount of fifty dollars ($50.00) for each log and deduct from the Contractor’s payment request, for each day the Contractor does not provide the documentation. 6. County may suspend Contractor operations if no Contractor Superintendent is observed. All delays caused by the suspension will be the responsibility of the Contractor. No time extension or claims for cost(s) associated with the suspension will be granted by the County.
CONSTRUCTION AND RENOVATION Construction and renovation projects for a state, local, territorial, or Tribal government’s principal Emergency Operations Center (EOC) as defined by the State Administrative Agency are allowable under the EMPG Program. Written approval must be provided by FEMA prior to the use of any EMPG Program funds for construction or renovation. Requests for EMPG Program funds for construction of an EOC must be accompanied by an EOC Investment Justification (located in the Related Documents tab of the EMPG xxxxxx.xxx posting) to their Regional EMPG Manager for review. Additionally, recipients are required to submit a SF-424C Form and Budget detail citing the project costs. When applying for funds to construct communication towers Sub-Recipients must submit evidence that the Federal Communication Commission’s (FCC) Section 106 review process has been completed and submit all documentation resulting from that review to Grants Program Directorate (GPD) prior to submitting materials for EHP review. Sub-Recipients are also encouraged to have completed as many steps as possible for a successful EHP review in support of their proposal for funding (e.g., coordination with their State Historic Preservation Office to identify potential historic preservation issues and to discuss the potential for project effects, compliance with all state and EHP laws and requirements). Projects for which the Sub-Recipient believes an Environmental Assessment (EA) may be needed, as defined in as defined in DHS Instruction Manual 023-01-001-01, Revision 01, FEMA Directive 108-1 and FEMA Instruction 108-1-1, must also be identified to the FEMA EMPG Regional Program Manager within six months of the award, and completed EHP review materials must be submitted no later than 12 months before the end of the period of performance. EHP review packets should be sent to xxxxxxxxxx@xxxx.xxx. EMPG Program Sub-Recipients using funds for construction projects must comply with the Xxxxx-Xxxxx Act (40 U.S.C. §§ 3141 et seq.). Grant Sub-Recipients must ensure that their contractors or subcontractors for construction projects pay workers no less than the prevailing wages for laborers and mechanics employed on projects of a character similar to the contract work in the civil subdivision of the state in which the work is to be performed. Additional information regarding compliance with the Xxxxx- Xxxxx Act, including Department of Labor (DOL) wage determinations, is available from the following website: xxxxx://xxx.xxx.xxx/whd/govcontracts/dbra.htm In general, Sub-Recipients should consult with their Grant Manager prior to making any investment that does not clearly meet the allowable expense criteria established in this Guidance.