Current Status of UAV Systems Interoperability Sample Clauses

Current Status of UAV Systems Interoperability. Current UAV systems are mostly “stove pipe” systems. They utilize unique data links, communication protocols and message formats for communication between UCS and Air Vehicle and the UCS and external C4I Systems. As a result, the dissemination of sensor data is mostly via indirect means, (e.g., from UCS to an exploitation system to the user). Current UAV System Operations in Joint NATO Operations are illustrated in Figure B - 2. Country A AV Country C AV The illustrated UAV systems all utilize unique data links and UCS as well as unique data/message formats for communication between the Air Vehicle and the UCS and also the UCS and the C4I Nodes. Dynamic joint cooperative operations require near real time tasking/re-tasking and dissemination of reconnaissance data to support the Tactical Commander, which the “stove-pipe” UAV systems may not support. Country B AV C4I UCS DATA LINK DATA LINK UCS C4I DATA LINK UCS C4I TACTICAL COMMANDER EXPLOITATION SYSTEMS CURRENT NATO/NATIONAL C4I NODES Figure B - 2. Current UAV System Operations Example
AutoNDA by SimpleDocs

Related to Current Status of UAV Systems Interoperability

  • Interoperability To the extent required by applicable law, Cisco shall provide You with the interface information needed to achieve interoperability between the Software and another independently created program. Cisco will provide this interface information at Your written request after you pay Cisco’s licensing fees (if any). You will keep this information in strict confidence and strictly follow any applicable terms and conditions upon which Cisco makes such information available.

  • SERVICE MONITORING, ANALYSES AND ORACLE SOFTWARE 11.1 We continuously monitor the Services to facilitate Oracle’s operation of the Services; to help resolve Your service requests; to detect and address threats to the functionality, security, integrity, and availability of the Services as well as any content, data, or applications in the Services; and to detect and address illegal acts or violations of the Acceptable Use Policy. Oracle monitoring tools do not collect or store any of Your Content residing in the Services, except as needed for such purposes. Oracle does not monitor, and does not address issues with, non-Oracle software provided by You or any of Your Users that is stored in, or run on or through, the Services. Information collected by Oracle monitoring tools (excluding Your Content) may also be used to assist in managing Oracle’s product and service portfolio, to help Oracle address deficiencies in its product and service offerings, and for license management purposes.

  • Registry Interoperability and Continuity Registry Operator shall comply with the Registry Interoperability and Continuity Specifications as set forth in Specification 6 attached hereto (“Specification 6”).

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Access to Network Interface Device (NID 2.4.3.1. Due to the wide variety of NIDs utilized by BellSouth (based on subscriber size and environmental considerations), Mpower may access the on-premises wiring by any of the following means: BellSouth shall allow Mpower to connect its loops directly to BellSouth’s multi-line residential NID enclosures that have additional space and are not used by BellSouth or any other telecommunications carriers to provide service to the premise. Mpower agrees to install compatible protectors and test jacks and to maintain the protection system and equipment and to indemnify BellSouth pursuant to Section 8 of the General Terms and Conditions of this Agreement.

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract.

  • Trunk Group Architecture and Traffic Routing The Parties shall jointly engineer and configure Local/IntraLATA Trunks over the physical Interconnection arrangements as follows:

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

Time is Money Join Law Insider Premium to draft better contracts faster.