Daily Nomination – VTS Interconnect Sample Clauses

Daily Nomination – VTS Interconnect. (a) No later than 06:00 hours on the VTS Day before the Service Provider is to provide the VTS Service to the Shipper, the Shipper may by notice to the Service Provider make its daily nomination in respect to the VTS Service (VTS Daily Nomination).
AutoNDA by SimpleDocs
Daily Nomination – VTS Interconnect. (a) The Shipper’s Receipt Point nomination and Delivery Point nomination in respect of the VTS Service for any Day will be the quantity of Natural Gas which is scheduled for injection by the Shipper from the TGP into the VTS on that Day under the operating schedule published by AEMO in respect of that Day in accordance with the Declared Wholesale Gas Market Rules.

Related to Daily Nomination – VTS Interconnect

  • Energy Resource Interconnection Service (ER Interconnection Service).

  • Scope of Interconnection Service 1.3.1 The NYISO will provide Energy Resource Interconnection Service and Capacity Resource Interconnection Service to Interconnection Customer at the Point of Interconnection.

  • Traffic Measurement and Billing over Interconnection Trunks 6.1 For billing purposes, each Party shall pass Calling Party Number (CPN) information on at least ninety-five percent (95%) of calls carried over the Interconnection Trunks.

  • Network Resource Interconnection Service (check if selected)

  • One-Way Interconnection Trunks 2.3.1 Where the Parties use One-Way Interconnection Trunks for the delivery of traffic from Connectel to Verizon, Connectel, at Connectel’s own expense, shall:

  • SS7 Network Interconnection 9.7.1 SS7 Network Interconnection is the interconnection of Global Connection local signaling transfer point switches or Global Connection local or tandem switching systems with BellSouth signaling transfer point switches. This interconnection provides connectivity that enables the exchange of SS7 messages among BellSouth switching systems and databases, Global Connection local or tandem switching systems, and other third-party switching systems directly connected to the XxxxXxxxx XX0 network.

  • Interconnection Points 8.5.1 The IP of a Party (“Receiving Party”) for Measured Internet Traffic delivered to the Receiving Party by the other Party shall be the same as the IP of the Receiving Party for Reciprocal Compensation Traffic under Section 7.1 above.

  • Connecting Transmission Owner’s Scope of Work and Responsibilities The Connecting Transmission Owner will design, construct, own, operate and maintain all Connecting Transmission Owner’s Interconnection Facilities, except as otherwise stated above and in the Project Specific Specifications. The Connecting Transmission Owner will complete all engineering reviews, field verifications and witness testing, etc. in accordance with the ESBs and the Project Specific Specifications. Connecting Transmission Owner shall provide the revenue metering CT/PT units and meter socket enclosure. The Connecting Transmission Owner shall:  provide, run, and wire both ends of the color-coded cable for the revenue metering instrument transformer secondary wiring;  perform all terminations; and  supply and install the meter. The revenue meter may require a communications link to the RTU. The Connecting Transmission Owner will specify and run those communications cables. The Connecting Transmission Owner shall complete all wiring, testing and commissioning of the RTU.