Damages for lower Reliability Sample Clauses

Damages for lower Reliability. In the event that the Reliability in a quarter exceeds 1 (one) Forced Closure in the Silo Complex, the Concessionaire shall pay to the Authority Damages equal to 2.5% (two point five per cent) of the Fixed Storage Charge payable for the storage Capacity of the Silo Complex in accordance with the provisions of Clause 15.1 and 15.2 for each such Forced Closure in excess of 1 (one).
AutoNDA by SimpleDocs

Related to Damages for lower Reliability

  • Response to Evaluation The teacher shall have the right to make a written response to the evaluation and to have it attached to the evaluation report to be placed in the teacher's personnel file. A copy, signed by both parties, shall be provided to the teacher.

  • Failure to Maintain Financial Viability The System Agency may terminate the Contract if, in its sole discretion, the System Agency has a good faith belief that Grantee no longer maintains the financial viability required to complete the services and Deliverables, or otherwise fully perform its responsibilities under the Contract.

  • Penalties for Non-compliance to Service Level Agreement Where the Supplier/Service Provider fails to deliver the Goods/Services within the agreed and accepted milestone timelines and provided that the cause of the delay was not due to a fault of Transnet, penalties shall be imposed at …………………………………………………… .

  • Xxxxxxx to Meet Timelines Failure by the Union to comply with the timelines will result in the automatic withdrawal of the grievance. Failure by the Employer to comply with the timelines will entitle the Union to move the grievance to the next step of the procedure.

  • Procedures for LNP Request The Parties shall provide for the requesting of End Office LNP capability on a reciprocal basis through a written request. The Parties acknowledge that Verizon has deployed LNP throughout its network in compliance with FCC 96-286 and other applicable FCC Regulations.

  • Required Coverages For Generation Resources Of 20 Megawatts Or Less Each Constructing Entity shall maintain the types of insurance as described in section 11.1 paragraphs (a) through (e) above in an amount sufficient to insure against all reasonably foreseeable direct liabilities given the size and nature of the generating equipment being interconnected, the interconnection itself, and the characteristics of the system to which the interconnection is made. Additional insurance may be required by the Interconnection Customer, as a function of owning and operating a Generating Facility. All insurance shall be procured from insurance companies rated “A-,” VII or better by AM Best and authorized to do business in a state or states in which the Interconnection Facilities are located. Failure to maintain required insurance shall be a Breach of the Interconnection Construction Service Agreement.

  • Failure to Meet Timelines Failure by the Union to comply with the timelines will result in the automatic withdrawal of the grievance. Failure by the Employer to comply with the timelines will entitle the Union to move the grievance to the next step of the procedure.

  • Unbundled Voice Xxxx - XX0 (XXX-XX0). Loops are 2-wire loop start circuits, will be non-designed, and will not have remote access test points. OC will be offered as a chargeable option on XX0 Xxxxx when reuse of existing facilities has been requested by NewPhone, however, OC is always required on UCLs that involve the reuse of facilities that are currently providing service. NewPhone may also order OC-TS when a specified conversion time is requested. OC-TS is a chargeable option for any coordinated order and is billed in addition to the OC charge. An Engineering Information (EI) document can be ordered as a chargeable option. The EI document provides Loop Make-Up information which is similar to the information normally provided in a Design Layout Record (DLR). Upon issuance of a non-coordinated order in the service order system, XX0 Xxxxx will be activated on the due date in the same manner and time frames that BellSouth normally activates POTS-type Loops for its customers.

  • Forecasting Requirements for Trunk Provisioning Within ninety (90) days of executing this Agreement, Reconex shall provide Verizon a two (2) year traffic forecast. This initial forecast will provide the amount of traffic to be delivered to and from Verizon over each of the Local Interconnection Trunk groups over the next eight (8) quarters. The forecast shall be updated and provided to Verizon on an as-needed basis but no less frequently than semiannually. All forecasts shall comply with the Verizon CLEC Interconnection Trunking Forecast Guide and shall include, at a minimum, Access Carrier Terminal Location (“ACTL”), traffic type (Local Traffic/Toll Traffic, Operator Services, 911, etc.), code (identifies trunk group), A location/Z location (CLLI codes for Reconex-IPs and Verizon-IPs), interface type (e.g., DS1), and trunks in service each year (cumulative).

  • Monitoring and Adjusting Forecasts Verizon will, for ninety (90) days, monitor traffic on each trunk group that it establishes at ECI’s suggestion or request pursuant to the procedures identified in Section 14.2 of this Attachment. At the end of such ninety-(90) day period, Verizon may disconnect trunks that, based on reasonable engineering criteria and capacity constraints, are not warranted by the actual traffic volume experienced. If, after such initial ninety (90) day period for a trunk group, Verizon determines that any trunks in the trunk group in excess of two (2) DS1s are not warranted by actual traffic volumes (considering engineering criteria for busy Centium Call Second (Hundred Call Second) and blocking percentages), then Verizon may hold ECI financially responsible for the excess facilities and disconnect such excess facilities.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!