DDT experiments (KIT Sample Clauses

DDT experiments (KIT. ‌ Table 9.1. Deflagration to detonation transition experiments contained in the model validation database. id Experiment name Short description 17 XXXX Experiment Explosion experiments with hydrogen in straight pipes of 3 different diameters (all with L/D = 98) were carried out, for the 6”/15 m pipe, 6 different gas concentrations were applied. 18 FZK-R 049809 Combustion experiments have been carried out in an obstructed tube of 350 mm diameter and 12 m in length. Repeatable obstacles with blockage ratio BR=0.3 at distances 500 mm. Hydrogen-air mixture with H2 concentration of 15% by volume was tested. 39 MiniRUT Processes of fast deflagration and DDT were studied in an obstructed channel and in a chamber called MiniRUT using high-speed shadow photography, pressure transducers, and photodiodes. A regime of DDT was observed in the channel, which showed detonation origin in a zone between the lead shock and turbulent flame brush of propagating fast deflagration. Detonation onset in the chamber resulted either from Mach reflection of lead shocks, or shock focusing in a corner. Critical mixture compositions for onset of detonations were determined. The detonation cell size was confirmed as a reliable scaling parameter for characterization of detonation onset conditions. 42 GRS029 This DDT experiment was carried out in a semi confined volume of size 9x3x0.3m, inside the facility repeating 53% block ratio obstacles were installed for the flame acceleration. The experiment facility was filled with 23% hydrogen-air mixture, and the burnable gas was ignited by a 2m flame tube. 43 GRS037 This DDT experiment was carried out in a semi confined volume of size 9x3x0.6m, inside the facility repeating 50% block ratio obstacles are installed for the flame acceleration. The experiment facility was filled with 22% hydrogen-air mixture, and the burnable gas was ignited by a 2m flame tube. 44 GRS056 This DDT experiment was carried out in a semi confined volume of size 9x3x0.6m, inside the facility repeating 50% block ratio obstacles are installed for the flame acceleration. The experiment facility was filled with gradient hydrogen-air mixture (at the top the concentration of hydrogen is 21.8% and the concentration decreases by 0.3% per cm), and the burnable gas was ignited by a 2m flame tube. 45 GRS057 This DDT experiment was carried out in a semi confined volume with size of 9x3x0.6m, inside the facility repeating 50% block ratio obstacles are installed for the flame accelera...
AutoNDA by SimpleDocs

Related to DDT experiments (KIT

  • For Product Development Projects and Project Demonstrations  Published documents, including date, title, and periodical name.  Estimated or actual energy and cost savings, and estimated statewide energy savings once market potential has been realized. Identify all assumptions used in the estimates.  Greenhouse gas and criteria emissions reductions.  Other non-energy benefits such as reliability, public safety, lower operational cost, environmental improvement, indoor environmental quality, and societal benefits.  Data on potential job creation, market potential, economic development, and increased state revenue as a result of the project.  A discussion of project product downloads from websites, and publications in technical journals.  A comparison of project expectations and performance. Discuss whether the goals and objectives of the Agreement have been met and what improvements are needed, if any.

  • Study An application for leave of absence for professional study must be supported by a written statement indicating what study or research is to be undertaken, or, if applicable, what subjects are to be studied and at what institutions.

  • Shop Drawings and Samples a. Record date of receipt of Samples and approved Shop Drawings.

  • Feasibility Study Buyer will, at Buyer's expense and within ____ days from Effective Date ("Feasibility Study Period"), determine whether the Property is suitable, in Buyer's sole and absolute discretion, for ___________________ use. During the Feasibility Study Period, Buyer may conduct a Phase I environmental assessment and any other tests, analyses, surveys and investigations ("Inspections") that Buyer deems necessary to determine to Buyer's satisfaction the Property's engineering, architectural and environmental properties; zoning and zoning restrictions; subdivision statutes; soil and grade; availability of access public roads, water, and other utilities; consistency with local, state and regional growth management plans, availability of permits, government approvals, and licenses; and other inspections that Buyer deems appropriate to determine the Property's suitability for the Buyer's intended use. If the Property must be rezoned, Buyer will obtain the rezoning from the appropriatx xxxernment agencies. Seller will sign all documents Buyer is required to file in connection with development or rezoning approvals. Seller gives Buyer, its agents, contractors and assigns, the right to enter the Property at any time during the Feasibility Study Period for the purpose of conducting inspections; provided, however, that Buyer, its agents, contractors and assigns enter the Property and conduct inspections at their own risk. Buyer will indemnify and hold Seller harmless from xxxxes, damages, costs, claims and expenses of any nature, including attorney's fees, expenses and liability incurred in application for rezoning or related proceedings, and from liability to any person, arising from the conduct of any and all inspections of any work authorized by Buyer. Buyer will not engage in any activity that xxxxx result in a construction lien being filed against the Property without Seller's prior written consent. If this transaction does not close, Buyer will, at Buyer's expense, (1) repair all damages to the Property resulting from the Inspections and return the Property to the condition it was in prior to conduct of the Inspections, and (2) release to Seller all reports and other work generated as a result of the Inspections. Buyer will deliver written notice to Seller prior to the expiration of the Feasibility Study Period of Buyer's determination of whether or not the Properxx xx acceptable. Buyer's failure to comply with this notice requirement will constitute acceptance of the Property as suitable for Buyer's intended use in its "as is" condition. If the Property is unacceptable to Buyer and written notice of this fact is timely delivered to Seller, this Contract will be deemed terminated as of the day after the Feasibility Study period ends and Buyer's deposit(s) will be returned after Escrow Axxxx receives proper authorization form all interested parties.

  • First sampling In the first sampling four lamps are selected at random. The first sample of two is marked A, the second sample of two is marked B.

  • SHOP DRAWINGS, PRODUCT DATA AND SAMPLES 4.12.1 Shop Drawings are drawings, diagrams, schedules and other, data specially prepared for the Work by the Contractor or any Subcontractor, manufacturer, supplier or distributor to illustrate some portion of the Work.

  • Studies The clinical, pre-clinical and other studies and tests conducted by or on behalf of or sponsored by the Company or its subsidiaries that are described or referred to in the Registration Statement, the Pricing Disclosure Package and the Prospectus were and, if still pending, are being conducted in accordance in all material respects with all statutes, laws, rules and regulations, as applicable (including, without limitation, those administered by the FDA or by any foreign, federal, state or local governmental or regulatory authority performing functions similar to those performed by the FDA). The descriptions of the results of such studies and tests that are described or referred to in the Registration Statement, the Pricing Disclosure Package and the Prospectus are accurate and complete in all material respects and fairly present the published data derived from such studies and tests, and each of the Company and its subsidiaries has no knowledge of other studies or tests the results of which are materially inconsistent with or otherwise call into question the results described or referred to in the Registration Statement, the Pricing Disclosure Package and the Prospectus. Except as described in the Registration Statement, the Pricing Disclosure Package and the Prospectus, neither the Company nor its subsidiaries has received any notices or other correspondence from the FDA or any other foreign, federal, state or local governmental or regulatory authority performing functions similar to those performed by the FDA with respect to any ongoing clinical or pre-clinical studies or tests requiring the termination or suspension of such studies or tests. For the avoidance of doubt, the Company makes no representation or warranty that the results of any studies, tests or preclinical or clinical trials conducted by or on behalf of the Company will be sufficient to obtain governmental approval from the FDA or any foreign, state or local governmental body exercising comparable authority.

  • Loop Testing/Trouble Reporting 2.1.6.1 Think 12 will be responsible for testing and isolating troubles on the Loops. Think 12 must test and isolate trouble to the BellSouth portion of a designed/non- designed unbundled Loop (e.g., UVL-SL2, UCL-D, UVL-SL1, UCL-ND, etc.) before reporting repair to the UNE Customer Wholesale Interconnection Network Services (CWINS) Center. Upon request from BellSouth at the time of the trouble report, Think 12 will be required to provide the results of the Think 12 test which indicate a problem on the BellSouth provided Loop.

  • Subprojects 1. The Borrower shall make Grants to Beneficiaries (Small Farmers, Municipalities and Organizations) for Subprojects (Farmers’ Business Initiatives, Infrastructure Subprojects and Environmental Subprojects) in accordance with eligibility criteria and procedures acceptable to the Bank as further detailed in the Project Operational Manual.

  • Test Samples The Contractor is responsible for providing Samples of sufficient size for test purposes and for coordinating such tests with the Work Progress Schedule to avoid delay.

Time is Money Join Law Insider Premium to draft better contracts faster.