Deductions for Uncorrected Work. If the Design Professional and Owner deem it inexpedient to correct work injured or done not in accordance with the contract, an equitable deduction from the contract price shall be made therefore and confirmed by execution of a lump sum Change Order. There is no duty on the part of the Owner, however, to accept any work injured or done not in accordance with the methods and materials designated in the contract documents, nor does the Contractor have the right to demand that there shall be acceptance of work injured or done not in accordance with the methods and materials designated in the Contract Documents.
Deductions for Uncorrected Work. If the Design Professional and Owner deem it inexpedient to correct work not done in accordance with Contract Documents, a deduction from the Contract Sum may be made; but there is no duty on the part of the Owner to accept any work not done in accordance with the Contract Documents.
Deductions for Uncorrected Work. If the Program Manager and Owner deem it inexpedient to correct work injured or done not in accordance with the contract, an equitable deduction from the contract price shall be made therefore. There is no duty on the part of the Owner, however, to accept any work injured or done not in accordance with the methods and materials designated in the contract documents, nor does the Design-Builder have the right to demand that there shall be acceptance of work injured or done not in accordance with the methods and materials designated in the Contract Documents.
Deductions for Uncorrected Work. If the Architect/Engineer and the Principal Representative deem it inexpedient to correct Work damaged or not performed in accordance with the Contract Documents, the Principal Representative may, after consultation with the Architect/Engineer and ten (10) days’ Notice to the Contractor of intent to do so, make reasonable reductions from the amounts otherwise due the Contractor on the next application for payment. Notice shall specify the amount or terms of any contemplated reduction. The Contractor may during this period correct or perform the Work. If the Contractor does not correct or perform the Work, an equitable deduction from the Contract sum shall be made by Change Order, in accordance with Article 35, Changes in The Work, unilaterally if necessary. If either party elects’ facilitation of this issue after Notice is given, the ten-day (10) notice period shall be extended and tolled until facilitation has occurred.
Deductions for Uncorrected Work. .1 If in the opinion of the Project Manager, it is not expedient to correct defective work or work not done in accordance with the Contract documents, the Metropolitan Regional Housing Authority may deduct from the Contract price the difference in value between the Work as done and that called for by the Contract, the amount of which shall be determined in the first instance by the Project Manager.
Deductions for Uncorrected Work. If the Owner deems it inexpedient to correct work that has been damaged, is defective, or has not been completed in accordance with the Contract Documents, an equitable deduction from the Contract price shall be made by Change Order therefor. The amount to be deducted as cost of doing work shall include the cost of the Engineer's/ Consultant's additional services made necessary by such default. If the payments then or thereafter due the Contractor are not sufficient to cover such amount, the Contractor shall pay the difference to the Owner.
Deductions for Uncorrected Work. If the Supervising Professional decides it is inexpedient to correct work that has been damaged or that was not done in accordance with the Contract, an equitable deduction from the Contract price shall be made.
Deductions for Uncorrected Work. 1. The Commission reserves the right to, in its sole discretion, deduct the cost of damaged or non-conforming Work from the Contract Price rather than require Design-Builder to repair or replace such damaged or non-conforming Work.
Deductions for Uncorrected Work. 50.1 If District deems it inexpedient to correct work injured or not done in accordance with the Contract, an equitable deduction from the Contract shall be made therefore.
Deductions for Uncorrected Work. 3.6.6 Inspection of Work.