Definition of the CFD workflow Sample Clauses

Definition of the CFD workflow. The main objective of the workflow automation is to reduce the human interaction with the HPC system and maximise automation in each step. Before starting the selected CAE workflow, a requirement must be considered, the geometry that will be used as an input for the CAE workflow must meet certain conditions. First, a preliminary geometry treatment must be done to obtain the file to be analysed. Then, the 3D CAD model must be simplified to remove irrelevant details that lead to an excessive number of cells. This operation, hereafter called CAD preparation, is performed manually with CAD software as CATIA [2] or NX [3]. In Figure 1, the whole CAE workflow is illustrated with all the steps that must be automated to accomplish the CFD analysis.
AutoNDA by SimpleDocs

Related to Definition of the CFD workflow

  • Overtime Work Definition Overtime for non-exempt employees working any work schedule is actual time worked in excess of forty (40) hours per workweek.

  • Definition of the Parties Without prejudice to Article 49, for the purposes of this Agreement, "the Parties" shall mean the Community, its Member States or the Community and its Member States, within their respective areas of competence, as derived from the Treaty establishing the European Community, on the one hand, and the Andean Community, its Member Countries or the Andean Community and its Member Countries, on the other, in accordance with their respective spheres of competence. The Agreement shall also apply to measures taken by any State, regional or local authorities within the territories of the Parties.

  • LIMITATIONS ON REVERSE ENGINEERING, DECOMPILATION AND DISASSEMBLY You may not reverse engineer, decompile, or disassemble the Software, except and only to the extent that such activity is expressly permitted by applicable law notwithstanding this limitation.

  • Definition of Grievance A grievance shall be defined as any difference arising out of the interpretation, application, administration, or alleged violation of the Collective Agreement.

  • Definition and Purpose Seniority, which is the length of an employee’s service within the bargaining unit as a whole, shall be used to distinguish between employees who would otherwise be considered equal.

  • GENERAL DEFINITION OF PRODUCTS Item 1: Cafeteria Furniture • Mobile tables on rollers with or without benches or stools. • Round and rectangular cafeteria tables without benches or stools. Item 2: Dormitory Furniture • Metal, wood, or wood clad metal wardrobes, beds and mattresses, night stands, chest of drawers, and single pedestal dormitory student desks with keyboard or center drawers.

  • SECTION I - DEFINITIONS As used in this Agreement, the following terms shall have the meanings ascribed herein unless otherwise stated or reasonably required by the Agreement, and other forms of any defined words shall have a meaning parallel thereto.

  • DESCRIPTION OF THE WORKS Employer’s objectives The scope of the request includes the recommended monthly preventative, quarterly and annual maintenance that needs to be conducted to ensure all areas of the airports are lit and compliant. It will include all the other adhoc request (labor rates) where required upon approval by the maintenance manager. The compliance will be based on the following: • Maintenance as per OEM • Organizational guidelines and codes of practice • OHS act 93 – Occupational Health and Safety • ISO 9001 – Quality management • ISO 14001 – Environmental Management • SANS 10142 – The wiring code • ICAO Annex 14 chapter 5. • ACSA Maintenance Procedure D060 024M This scope entails the maintenance and repair of LV systems and all lighting at Costal airports. In brief, maintenance involves servicing, repairs, and testing of lights and LV systems. This involves carrying out maintenance on electrical equipment such as LV DBs, electrical plant, wiring enclosures and luminaires and associated control systems, portable appliances and other specific electrical equipment, in order to minimize downtime, and ensure that the equipment performs at optimal levels and functions to specification at the specified areas. Servicing - performing routine preventive maintenance as prescribed by the original equipment manufacturer (OEM), ACSA’s planned maintenance routines, and applicable legal and design standards. Repairs – responding to breakdowns, callouts and restoring the equipment to safe working conditions on an as and when basis. Advisory – telephonically guiding airport electricians under emergency situations to ensure systems are safely shutdown or returned to service within stringent times. System Performance Test – Testing equipment performance against the OEM, ACSA, and statutory requirements for compliance and return to service purposes. Extent of the works The Contractor will be fully responsible for meeting all requirements in this document regarding the Works. For each piece of equipment, all work will be carried out to standards as required by the Original Equipment Manufacturer (OEM) as well as any applicable governing law and/or regulations. Where OEM standards differ from those required by this document the more stringent requirement shall apply. The Contractor will be fully responsible for obtaining (and keeping up to date with) said requirements. The proposed minimum scheduled maintenance activities can be found in annex H.

  • Definition of Terms The following terms referred to in this Agreement shall have the following meanings:

  • PROJECT DEFINITIONS The following capitalized terms have the meanings assigned below for purposes of Exhibits A and B.

Time is Money Join Law Insider Premium to draft better contracts faster.