Design Blocking Criteria. 5.4.1 Forecasting trunk projections and servicing trunk requirements for Interconnection Trunks shall be based on the average time-consistent busy hour load of the busy season, determined from the highest twenty (20) consecutive average Business Days. The average grade-of-service for Interconnection final Trunk Groups shall be the industry standard of one percent (1%) blocking, within the time-consistent twenty day average busy hour of the busy season. Trunk projections and requirements shall be determined by using the industry standard Xxxx Xxxxxxxxx X.01M Trunk Group capacity algorithms for grade-of-service Trunk Groups. (Prior to obtaining actual traffic data measurements, a medium day-to-day variation and 1.0 peakedness factor shall be used to determine projections and requirements.)
Appears in 4 contracts
Samples: Paging Interconnection Agreement, Paging Interconnection Agreement, Paging Interconnection Agreement
Design Blocking Criteria. 5.4.1 Forecasting trunk projections and servicing trunk requirements for Interconnection Trunks shall be based on the average time-consistent busy hour load of the busy season, determined from the highest twenty (20) consecutive average Business Days. The average grade-of-service for Interconnection final Trunk Groups shall be the industry standard of one percent (1%) blocking, within the time-consistent twenty day average busy hour of the busy season. Trunk projections and requirements shall be determined by using the industry standard Xxxx Xxxxxxxxx X.01B.01M Trunk Group capacity algorithms for grade-of-service Trunk Groups. (Prior to obtaining actual traffic data measurements, a medium day-to-day variation and 1.0 peakedness factor shall be used to determine projections and requirements.)
Appears in 1 contract
Samples: Paging Interconnection Agreement