Design Costs. Cost of design incurred in connection with a change. Costs to be enumerated using rates for labor as set forth in the rate sheet attached as Exhibit E – Schedule 9.2.8e.
Appears in 7 contracts
Samples: Design Build Contract, Design Build Contract, Design Build Contract