Construction Cost Sample Clauses

Construction Cost. 3.1. Construction Cost does not include the fees of the ARCHITECT/ENGINEER and consultants, the cost of the land, rights- of-way, or other costs, which is the responsibility of the State as provided in Paragraphs 2.2 through 2.3. or any of the contingencies available for the project unless specifically stated otherwise. 3.2. Labor furnished by the State for the Project, however, with respect only to the construction of such components thereof as have been designed by the ARCHITECT/ENGINEER, shall be included in the Construction Cost at current market rates. Materials and equipment furnished by the State shall be included at current market prices, except that used materials and equipment shall be included as if purchased new for the Project.
AutoNDA by SimpleDocs
Construction Cost. The cost to Owner of the construction of those portions of the entire Project designed or specified by or for Engineer under this Agreement, including construction labor, services, materials, equipment, insurance, and bonding costs, and allowances for contingencies. Construction Cost does not include costs of services of Engineer or other design professionals and consultants; cost of land or rights-of-way, or compensation for damages to property; Owner’s costs for legal, accounting, insurance counseling, or auditing services; interest or financing charges incurred in connection with the Project; or the cost of other services to be provided by others to Owner. Construction Cost is one of the items comprising Total Project Costs.
Construction Cost. (As described and defined in Article 3 of the Base A/E Agreement) (As described in Articles 4 and 5 of the Base A/E Agreement) (As described in §1.4.3 of the Base A/E Agreement)
Construction Cost. 3.1 Construction Cost does not include the fees of the ARCHITECT/ENGINEER and consultants, the cost of the land, rights-of-way, or other costs, which is the responsibility of the State as provided in Paragraphs
Construction Cost. The sum total of all costs of constructing the Project as depicted in the Construction Documents, such as labor and materials, general conditions costs, Contractor costs, fees and contingencies, fixed equipment furnished and installed by a member of the Construction Team, but excluding: (a) the cost of moveable furniture and fixed equipment furnished and/or installed by parties other than the Construction Team, as defined in §1.5; (b) the cost of Work not designed or specified by the Design Professional or a member of the Construction Team; and (c) the fees and expenses of the Design Professional and Sub-consultants retained directly or indirectly by either the Design Professional or the Owner. The Design Professional will design the Project so that the Construction Cost for the Project will not exceed the “Fixed Limit of Construction Cost,” set forth in the Schedule of Project Details.
Construction Cost. (Re: 3.1 of the Agreement) (Re: 4.1 of the Agreement)
Construction Cost. If a Construction Cost Estimate is required to be provided by the CONSULTANT pursuant to a Services Authorization, then the following will apply: 6.2.2.1 The acceptance by the CITY at any time during the Basic Services of a revised opinion of Total Project Cost or Construction Cost Estimate in excess of the then established cost limit will constitute a corresponding revision in the Construction Cost Estimate limit to the extent indicated in such revised opinion. 6.2.2.2 If a Construction Cost Estimate is established, the CONSULTANT will be permitted, with review and approval by the CITY, to determine what types of materials, equipment and component systems are to be included in the drawings and specifications and to make reasonable adjustments in the general scope, extent and character of the Project to bring it within the cost estimate. 6.2.2.3 If the Bidding or negotiating Phase of a Project has not commenced within six (6) months after completion of the Final Design Phase, the established Construction Cost Estimate will not be binding on the CONSULTANT, and the CITY shall consent to any reasonable adjustment in the Construction Cost Estimate commensurate with any applicable change in the general level of prices in the construction industry between the date of completion of the Final Design Phase and the date on which proposals or bids are sought. 6.2.2.4 If the lowest bona fide proposal or bid exceeds the established Construction Cost Estimate by 15% or more, the CITY may, (1) give written approval to increase such Construction Cost Estimate, (2) authorize negotiating or rebidding of the Project within a reasonable time, or (3) cooperate in revising the Project's general scope, extent or character to the extent consistent with the Project's requirements and with sound professional practices. In the case of (3), the CONSULTANT shall modify the drawings and specifications as necessary to bring the construction cost within the Construction Cost Estimate. In lieu of other compensation for Services in making such modifications, the CITY shall pay the CONSULTANT's cost of such Services, all overhead expenses reasonably related thereto, and Reimbursable Expenses, but without profit to the CONSULTANT on account of such Services; and the CONSULTANT's providing these modification Services shall be the extent of the CONSULTANT's cost-estimating liability as memorialized in this Subsection.
AutoNDA by SimpleDocs
Construction Cost. TENANT shall construct its own building at its own costs and bear all construction within its demised premises, as identified in Exhibit A.
Construction Cost. The total construction cost to CITY of all elements of the Project designed or specified by CONSULTANT.
Construction Cost. The total cost to OWNER of those portions of the entire Project designed or specified by ENGINEER. Construction Cost does not include ENGINEER's compensation and expenses, the cost of land, rights-of-way, or compensation for or damages to properties, or OWNER's legal, accounting, insurance counseling or auditing services, or interest and financing charges incurred in connection with the Project or the cost of other services to be provided by others to OWNER pursuant to Article 3. Construction Cost is one of the items comprising Total Project Costs.