Construction Requirements (a) All Life and Safety and applicable Building Codes will be strictly enforced (i.e., tempered glass, fire dampers, exit signs, smoke detectors, alarms, etc.). Prior coordination with the Building Manager is required. (b) Electric panel schedules must be brought up to date identifying all new circuits added. (c) All electrical outlets and lighting circuits are to be properly identified. Outlets will be labeled on back side of each cover plate. (d) All electrical and phone closets being used must have panels replaced and doors shut at the end of each day’s work. Any electrical closet that is opened with the panel exposed must have a work person present. (e) All electricians, telephone personnel, etc. will, upon completion of their respective projects, pick up and discard their trash leaving the telephone and electrical rooms clean. If this is not complied with, a clean-up will be conducted by the building janitors and the general contractor will be back-charged for this service. (f) Welding or burning with an open flame will not be done without prior approval of the Building Manager. Fire extinguishers must be on hand at all times. (g) All “anchoring” of walls or supports to the concrete are not to be done during normal working hours (7:30 AM—6:00 PM, Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend. (h) All core drilling is not to be done during normal working hours (7:30 AM—6:00 PM, Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend. (i) All HVAC work must be inspected by the Building Engineer. The following procedures will be followed by the general contractor: i) A preliminary inspection of the HVAC work in progress will be scheduled through the Building Office prior to the reinstallation of the ceiling grid. ii) A second inspection of the HVAC operation will also be scheduled through the Building Office and will take place with the attendance of the HVAC contractor’s Air Balance Engineer. This inspection will take place when the suite in question is ready to be air-balanced. [***] = CONFIDENTIAL INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION. CONFIDENTIAL TREATMENT HAS BEEN REQUESTED WITH RESPECT TO THIS OMITTED INFORMATION. iii) The Building Engineer will inspect the construction on a periodic basis as well. (j) All existing thermostats, ceiling tiles, lighting fixtures and air conditioning grilles shall be saved and turned over to the Building Engineer.
Application Requirements This application shall contain, as a minimum, a sketch showing the location of proposed facilities; a description, sketch, manufacturer’s brochure, etc. of the proposed facilities; and a description of the operation proposed. (11-28-90) 101. -- 199. (RESERVED) 200. OPERATIONAL AGREEMENT.
Documentation Requirements ODM shall pay the MCP after it receives sufficient documentation, as determined by ODM, detailing the MCP’s Ohio Medicaid-specific liability for the Annual Fee. The MCP shall provide documentation that includes the following: 1. Total premiums reported on IRS Form 8963;
Design Requirements The DG Facility shall be installed in compliance with Wisconsin Administrative Code Chapter PSC 119.
Certification Requirements The hospice program certifies and attaches hereto documentation that: (a) it is Medicare approved and meets all Medicare conditions of participation (42 CFR 418); and (b) is licensed pursuant to any applicable state or local law.
Documentation Required The certificates and endorsements shall be received and approved by the District before Work commences. As an alternative, the Contractor may submit certified copies of any policy that includes the required endorsement language set forth herein.
Certification of Compliance with the Energy Policy and Conservation Act When appropriate and to the extent consistent with the law, Vendor certifies that it will comply with the Energy Policy and Conservation Act (42 U.S.C. 6321 et seq; 49 C.F.R. Part 18) and any mandatory standards and policies relating to energy efficiency which are contained in applicable state energy conservation plans issued in compliance with the Act. Does Vendor agree? Yes
Notification Requirements 1. If the Family Leave is foreseeable, the employee must provide the agency/department with thirty (30) calendar days notice of his or her intent to take Family Leave. 2. If the event necessitating the Family Leave becomes known to the employee less than thirty (30) calendar days prior to the employee's need for Family Leave, the employee must provide as much notice as possible. In no case shall the employee provide notice later than five (5) calendar days after he or she learns of the need for Family Leave. 3. For foreseeable leave due to a qualifying exigency, an employee must provide notice of the need for leave as soon as practicable, regardless of how far in advance such leave is foreseeable. 4. When the Family Leave is for the purpose of the scheduled medical treatment or planned medical care of a child, parent, spouse or registered domestic partner, the employee shall, to the extent practicable, schedule treatment and/or care in a way that minimizes disruption to agency/department operations.
Submission Requirements Requirement Deliverable (Report Name) Due Date Submission System
Abbreviated Documentation Requirements Compile and submit: