DESIGN VARIANCE FUNDING REDUCTION(S) Sample Clauses

DESIGN VARIANCE FUNDING REDUCTION(S). Where an Operator is permitted in respect of a project to rely on a standard variance specified in the applicable Design Manual, the amount of the CFS Per Diem in respect of the project is reduced by the applicable amount set out in the Design Manual, unless the ministry agrees in writing to waive the reduction in whole or in part. The list of standard variances and associated reductions from the 2015 Design Manual are summarized for convenience in the table below. Design Variances Per Diem Reduction 1 RHA size (up to 40 beds) $0.54 2 Split level RHA $1.50 3 Bedroom Size $0.67 4 Closet Size $0.13 5 Lounge / Activity Space per Resident $0.39 6 Dining Space per Resident $0.39 7 Dining Space at 70% $0.39 8 Corridor W idths $0.26 9 Percentage Lounge / Activity Space in RHA $0.26 10 Outdoor space not provided on each floor or 1 floor of a split RHA $0.40 11 5-Foot Turning Circle Radius in Washroom $0.25 Total of Potential Funding Reductions to the CFS Per Diem from Design Variances $5.18 Note: Variances from applicable design requirements may only be permitted in respect of Renovations, whether within or outside existing building footprint. All variances from applicable design standards require ministry approval in writing except for variances specified in the 2015 Design Manual in respect of a portion of a Project that is classified as “Renovation (within existing building footprint)”. Applications for variances and/or relief from applicable associated funding reductions shall be in accordance with any instructions provided by the ministry from time to time.
AutoNDA by SimpleDocs

Related to DESIGN VARIANCE FUNDING REDUCTION(S)

  • Enhancement Budget Enhancements refer to additional functionality and deliverables unknown to the Authorized User at the time of Mini-Bid release. An Authorized User is permitted to include an enhancement budget, as included in the Mini-Bid (up to 10%). The total cost of the project including the enhancement budget shall not exceed the Lot threshold from which the award was made. An Authorized User shall use Appendix F, Attachment 3, Enhancement Request Template to reflect such modifications. Mini-Bid/Statement of Work documents will define specific criteria and method of reimbursement for the enhancement budget. Written approval of the Enhancement Budget Request is required from both the Authorized User and the Contractor.

  • Commercial Price List Reductions Where NYS Net Prices are based on a discount from Contractor’s list prices, price decreases shall take effect automatically during the Contract term and apply to Purchase Orders submitted on or after the date Contractor lowers its pricing to its customers generally or to similarly situated government customers during the Contract term; or

  • OGS Centralized Contract Modifications OGS, an Authorized User, or the Contractor may suggest modifications to the Centralized Contract or its Appendices. Except as specifically provided herein, modifications to the terms and conditions set forth herein may only be made with mutual written agreement of the Parties. Modifications may take the form of an update or an amendment. “

  • CENTRALIZED CONTRACT MODIFICATIONS A. OGS, an Authorized User, or the Contractor may suggest modifications to the Centralized Contract or its Appendices. Except as specifically provided herein, modifications to the terms and conditions set forth herein may only be made with mutual written agreement of the Parties. Modifications may take the form of an update or an amendment. “

  • Commercial Operation Date Testing and Modifications Prior to the Commercial Operation Date, the Connecting Transmission Owner shall test the Connecting Transmission Owner’s Attachment Facilities and System Upgrade Facilities and System Deliverability Upgrades and Developer shall test the Large Generating Facility and the Developer Attachment Facilities to ensure their safe and reliable operation. Similar testing may be required after initial operation. Developer and Connecting Transmission Owner shall each make any modifications to its facilities that are found to be necessary as a result of such testing. Developer shall bear the cost of all such testing and modifications. Developer shall generate test energy at the Large Generating Facility only if it has arranged for the injection of such test energy in accordance with NYISO procedures.

  • Construction Administration Phase Delete the following paragraph if Submittal Exchange isn’t going to be used:

  • Post-Commercial Operation Date Testing and Modifications Each Party shall at its own expense perform routine inspection and testing of its facilities and equipment in accordance with Good Utility Practice as may be necessary to ensure the continued interconnection of the Large Generating Facility with the Participating TO’s Transmission System in a safe and reliable manner. Each Party shall have the right, upon advance written notice, to require reasonable additional testing of the other Party’s facilities, at the requesting Party’s expense, as may be in accordance with Good Utility Practice.

  • Construction Phase Payments 10.3.1 Payments for Construction Phase Services shall be made as provided for in the UGSC and Owner’s Specifications. All payment requests shall be submitted through e- Builder® with a Schedule of Values and include all required attachments. Payment for approved Change Orders shall be made as part of Contractor’s Application for Payment. Failure to submit a Prime Contractor Progress Assessment Report form with each Application for Payment will cause rejection of the application by Owner and its return to Contractor.

  • Construction Funding Subsidies 5.1 Subject to 5.2 and 5.3 the HSP is required to continue to fulfill all CFS Commitments, and the CFS Commitments are hereby incorporated into and deemed part of the Agreement.

  • Project Funding 8.1 The Project Funding for completion of this PFA is as follows:

Time is Money Join Law Insider Premium to draft better contracts faster.