Consultant’s Contract Manager and Other Staffing Identified below are the following: (a) the Consultant’s contract manager for this Approved Service Order, and (b) the Consultant(s) and/or employee(s) of the Consultant who will be principally responsible for providing the services and deliverables. If an individual identified below does not have a current Form 700 on file with the City Clerk for a separate agreement with the City, and is required to file a Form 700, the Consultant must comply with the requirements of Subsection 17.2 of the Master Agreement, entitled “Filing Form 700.”
Under-Frequency and Over Frequency Conditions The New York State Transmission System is designed to automatically activate a load- shed program as required by the NPCC in the event of an under-frequency system disturbance. Developer shall implement under-frequency and over-frequency relay set points for the Large Generating Facility as required by the NPCC to ensure “ride through” capability of the New York State Transmission System. Large Generating Facility response to frequency deviations of predetermined magnitudes, both under-frequency and over-frequency deviations, shall be studied and coordinated with the NYISO and Connecting Transmission Owner in accordance with Good Utility Practice. The term “ride through” as used herein shall mean the ability of a Generating Facility to stay connected to and synchronized with the New York State Transmission System during system disturbances within a range of under-frequency and over-frequency conditions, in accordance with Good Utility Practice and with NPCC Regional Reliability Reference Directory # 12, or its successor.