Documentation of the rollover test Sample Clauses

Documentation of the rollover test. 4.1. Detailed description of the tested vehicle shall be given by the manufacturer in which: 4.1.1. all the deviations between the fully finished vehicle type in running order and the tested vehicle are listed. 4.1.2. the equivalent substitution (in respect of mass, mass distribution and installation) shall be proved in every case, when structural parts, units are substituted by other units or masses. 4.1.3. there is a clear statement of the position of centre of gravity in the tested vehicle which may be based on measurements carried out on the test vehicle when it is ready for test, or a combination of measurement (carried out on the fully finished vehicle type) and calculation based on the mass substitutions. 4.2. The test report shall contain all the data (pictures, records, drawings, measured values, etc.) which show: 4.2.1. that test was carried out according to this annex; 4.2.2. that the requirements given in paragraphs 5.1.1. and 5.1.2. of this Regulation are met (or not); 4.2.3. the individual evaluation of inside observations; 4.2.4. all the data and information needed for the identification of the vehicle type, the test vehicle, the test itself, and the personnel responsible for the test and its evaluation. 4.3. It is recommended to document in the test report the centre of gravity's highest and lowest position related to the ground level of the ditch. ROLLOVER TEST USING BODY SECTIONS AS AN EQUIVALENT APPROVAL METHOD 1. Additional data and information 1.1. drawings of the body sections to be tested; 1.2. verification of the validity of the distribution of masses given in Annex 4, paragraph 4., upon successful completion of the body section rollover tests;
AutoNDA by SimpleDocs

Related to Documentation of the rollover test

  • Implementation of the Agreement Regulations of this Agreement relating to investments who investors of one Contracting Party realized before or after the entry into force of this Agreement, with what shall apply from the moment of its entry into force, provided that such investments conducted in accordance with the laws of that Party Contracting.

  • Implementation of the Report 1. The Panel report shall be final and binding on the disputing Parties. 2. If the report issued by the Panel determines that a Party has not conformed with its obligations under this Agreement, the Party complained against shall eliminate the non- conformity. 3. The Party complained against shall comply with the recommendation of the Panel promptly or, if not practicable, within a reasonable period of time. The Parties shall agree on reasonable period of time within 30 days of the notification of the report of the Panel. In any case, such reasonable period of time shall not exceed 300 calendar days after the release of the report.

  • Unbundled Loop Modifications (Line Conditioning 2.5.1 Line Conditioning is defined as routine network modification that BellSouth regularly undertakes to provide xDSL services to its own customers. This may include the removal of any device, from a copper Loop or copper Subloop that may diminish the capability of the Loop or Subloop to deliver high-speed switched wireline telecommunications capability, including xDSL service. Such devices include, load coils, excessive bridged taps, low pass filters, and range extenders. Excessive bridged taps are bridged taps that serves no network design purpose and that are beyond the limits set according to industry standards and/or the BellSouth’s TR 73600 Unbundled Local Loop Technical Specification. 2.5.2 BellSouth will remove load coils only on copper Loops and Subloops that are less than eighteen thousand (18,000) feet in length. 2.5.3 For any copper loop being ordered by NewPhone which has over six thousand (6,000) feet of combined bridged tap will be modified, upon request from NewPhone, so that the loop will have a maximum of six thousand (6,000) feet of bridged tap. This modification will be performed at no additional charge to NewPhone. Loop conditioning orders that require the removal of bridged tap that serves no network design purpose on a copper Loop that will result in a combined total of bridged tap between two thousand five hundred (2,500) and six thousand (6,000) feet will be performed at the rates set forth in Exhibit A. 2.5.4 NewPhone may request removal of any unnecessary and non-excessive bridged tap (bridged tap between zero (0) and two thousand five hundred (2,500) feet which serves no network design purpose), at rates pursuant to BellSouth’s SC Process as mutually agreed to by the Parties. 2.5.5 Rates for ULM are as set forth in Exhibit A. 2.5.6 BellSouth will not modify a Loop in such a way that it no longer meets the technical parameters of the original Loop type (e.g., voice grade, ADSL, etc.) being ordered. 2.5.7 If NewPhone requests ULM on a reserved facility for a new Loop order, BellSouth may perform a pair change and provision a different Loop facility in lieu of the reserved facility with ULM if feasible. The Loop provisioned will meet or exceed specifications of the requested Loop facility as modified. NewPhone will not be charged for ULM if a different Loop is provisioned. For Loops that require a DLR or its equivalent, BellSouth will provide LMU detail of the Loop provisioned. 2.5.8 NewPhone shall request Loop make up information pursuant to this Attachment prior to submitting a service inquiry and/or a LSR for the Loop type that NewPhone desires BellSouth to condition. 2.5.9 When requesting ULM for a Loop that BellSouth has previously provisioned for NewPhone, NewPhone will submit a SI to BellSouth. If a spare Loop facility that meets the Loop modification specifications requested by NewPhone is available at the location for which the ULM was requested, NewPhone will have the option to change the Loop facility to the qualifying spare facility rather than to provide ULM. In the event that BellSouth changes the Loop facility in lieu of providing ULM, NewPhone will not be charged for ULM but will only be charged the service order charges for submitting an order.

  • Post-Commercial Operation Date Testing and Modifications Each Party shall at its own expense perform routine inspection and testing of its facilities and equipment in accordance with Good Utility Practice as may be necessary to ensure the continued interconnection of the Large Generating Facility with the Participating TO’s Transmission System in a safe and reliable manner. Each Party shall have the right, upon advance written notice, to require reasonable additional testing of the other Party’s facilities, at the requesting Party’s expense, as may be in accordance with Good Utility Practice.

  • Investment Analysis and Implementation In carrying out its obligations under Section 1 hereof, the Advisor shall: (a) supervise all aspects of the operations of the Funds; (b) obtain and evaluate pertinent information about significant developments and economic, statistical and financial data, domestic, foreign or otherwise, whether affecting the economy generally or the Funds, and whether concerning the individual issuers whose securities are included in the assets of the Funds or the activities in which such issuers engage, or with respect to securities which the Advisor considers desirable for inclusion in the Funds' assets; (c) determine which issuers and securities shall be represented in the Funds' investment portfolios and regularly report thereon to the Board of Trustees; (d) formulate and implement continuing programs for the purchases and sales of the securities of such issuers and regularly report thereon to the Board of Trustees; and (e) take, on behalf of the Trust and the Funds, all actions which appear to the Trust and the Funds necessary to carry into effect such purchase and sale programs and supervisory functions as aforesaid, including but not limited to the placing of orders for the purchase and sale of securities for the Funds.

  • Description of the Transfer The details of the transfer and of the personal data are specified in Annex B. The parties agree that Annex B may contain confidential business information which they will not disclose to third parties, except as required by law or in response to a competent regulatory or government agency, or as required under clause I(e). The parties may execute additional annexes to cover additional transfers, which will be submitted to the authority where required. Annex B may, in the alternative, be drafted to cover multiple transfers.

  • Amendments in Writing; Waiver; Integration No purported amendment or modification of any Loan Document, or waiver, discharge or termination of any obligation under any Loan Document, shall be enforceable or admissible unless, and only to the extent, expressly set forth in a writing signed by the party against which enforcement or admission is sought. Without limiting the generality of the foregoing, no oral promise or statement, nor any action, inaction, delay, failure to require performance or course of conduct shall operate as, or evidence, an amendment, supplement or waiver or have any other effect on any Loan Document. Any waiver granted shall be limited to the specific circumstance expressly described in it, and shall not apply to any subsequent or other circumstance, whether similar or dissimilar, or give rise to, or evidence, any obligation or commitment to grant any further waiver. The Loan Documents represent the entire agreement about this subject matter and supersede prior negotiations or agreements. All prior agreements, understandings, representations, warranties, and negotiations between the parties about the subject matter of the Loan Documents merge into the Loan Documents.

  • Project Implementation Manual The Recipient, through the PCU, shall: (i) take all action required to carry out Parts 1.1, 1.3, 1.4, 2, 3.1(b), 3.2, 3.3 and 4 (ii) of the Project in accordance with the provisions and requirements set forth or referred to in the Project Implementation Manual; (ii) submit recommendations to the Association for its consideration for changes and updates of the Project Implementation Manual as they may become necessary or advisable during Project implementation in order to achieve the objective of Parts 1.1, 1.3, 1.4, 2, 3.1(b), 3.2, 3.3 and 4(ii) of the Project; and (iii) not assign, amend, abrogate or waive the Project Implementation Manual or any of its provisions without the Association’s prior agreement. Notwithstanding the foregoing, if any of the provisions of the Project Implementation Manual is inconsistent with the provisions of this Agreement, the provisions of this Agreement shall prevail and govern.

  • Commercial Operation Date Testing and Modifications Prior to the Commercial Operation Date, the Connecting Transmission Owner shall test the Connecting Transmission Owner’s Attachment Facilities and System Upgrade Facilities and System Deliverability Upgrades and Developer shall test the Large Generating Facility and the Developer Attachment Facilities to ensure their safe and reliable operation. Similar testing may be required after initial operation. Developer and Connecting Transmission Owner shall each make any modifications to its facilities that are found to be necessary as a result of such testing. Developer shall bear the cost of all such testing and modifications. Developer shall generate test energy at the Large Generating Facility only if it has arranged for the injection of such test energy in accordance with NYISO procedures.

  • Project Implementation The Borrower shall:

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!