Common use of - Drainage Structures Clause in Contracts

- Drainage Structures. Manufactured structures which control the runoff of water from the Roadway including Inslope, overside drains, aprons, flumes, down drains, downpipes, and the like. 800-1.10 Dust Abatement Plan: A table which lists the road, dust palliative, application rates, and estimated number of subsequent applications. 800-1.11 Lead-off Ditches: A ditch used to transmit water from a Drainage Structure or Drainage Dip outlet to the natural drainage area. 800-1.12 Material: Any substances specified for use in the performance of the work. 800-1.13 Prehaul Maintenance: Road maintenance work which the Purchaser determines must be accomplished to maintain the roads to a satisfactory condition commensurate with the Purchaser's use provided Purchaser's Operations do not damage improvements under B6.22 or National Forest resources and hauling can be done safely. This work will be shown in the Annual Road Maintenance Plan as provided in C/CT5.4. 800-1.14 Prehaul Maintenance work the Purchaser elects to perform will be in compliance with the Road Maintenance T- Specifications. Roadbed: The portion of a road between the intersection of Subgrade and side slopes, excluding that portion of the ditch below Subgrade.

Appears in 7 contracts

Samples: www.fs.usda.gov, www.fs.usda.gov, www.fs.usda.gov

AutoNDA by SimpleDocs

- Drainage Structures. Manufactured structures which control the runoff of water from the Roadway including Roadwayincluding Inslope, overside drains, aprons, flumes, down drains, downpipes, and the like. 800-1.10 Dust Abatement Plan: A table which lists the road, dust palliative, application rates, and estimated number of numberof subsequent applications. 800-1.11 Lead-off Ditches: A ditch used to transmit water from a Drainage Structure or Drainage Dip outlet to the natural thenatural drainage area. 800-1.12 Material: Any substances specified for use in the performance of the work. 800-1.13 Prehaul Maintenance: Road maintenance work which the Purchaser determines must be accomplished to maintain the roads to a satisfactory condition commensurate with the Purchaser's use provided Purchaser's Operations do not damage improvements under B6.22 or National Forest resources and hauling can be done bedone safely. This work will be shown in the Annual Road Maintenance Plan as provided in C/CT5.4. 800-1.14 Prehaul Maintenance work the Purchaser elects to perform will be in compliance with the Road Maintenance T- Specifications. Roadbed: The portion of a road between the intersection of Subgrade and side slopes, excluding that portion of the ditch below Subgrade.

Appears in 1 contract

Samples: www.fs.usda.gov

- Drainage Structures. Manufactured structures which control the runoff of water from the Roadway including Inslope, overside drains, aprons, flumes, down drains, downpipes, and the like. 800-1.10 Dust Abatement Plan: A table which lists the road, dust palliative, application rates, and estimated number of subsequent applications. 800-1.11 Lead-off Ditches: A ditch used to transmit water from a Drainage Structure or Drainage Dip outlet to the natural drainage area. 800-1.12 Material: Any substances specified for use in the performance of the work. 800-1.13 Prehaul Maintenance: Road maintenance work which the Purchaser determines must be accomplished to maintain the roads to a satisfactory condition commensurate with the Purchaser's use provided Purchaser's Operations do not damage improvements under B6.22 or National Forest resources and hauling can be done safely. This work will be shown in the Annual Road Maintenance Plan as provided in C/CT5.4. 800-1.14 Prehaul Maintenance work the Purchaser elects to perform will be in compliance with the Road Maintenance T- T-Specifications. Roadbed: The portion of a road between the intersection of Subgrade and side slopes, excluding that portion of the ditch below Subgrade.

Appears in 1 contract

Samples: Service Timber Sale Contract

AutoNDA by SimpleDocs

- Drainage Structures. Manufactured structures which control the runoff of water from the Roadway including Inslope, overside drains, aprons, flumes, down drainsdowndrains, downpipes, and the like. 800-1.10 - Dust Abatement Plan: . A table which lists the road, dust palliative, application rates, and estimated number of subsequent applications. 800-1.11 - Lead-off Ditches: . A ditch used to transmit water from a Drainage Structure or Drainage Dip outlet to the natural drainage area. 800-1.12 - Material: . Any substances specified for use in the performance of the work. 800-1.13 - Prehaul Maintenance: . Road maintenance work which the Purchaser Contractor determines must be accomplished to maintain the roads to a satisfactory condition commensurate with the Purchaser's use Contractor’s use, provided Purchaser's Contractor’s Operations do not damage improvements under B6.22 or National Forest resources and hauling can be done safely. This work will be shown in the Annual Road Maintenance Plan as provided in C/CT5.4Plan. 800-1.14 Prehaul Maintenance work the Purchaser Contractor elects to perform will be in compliance with the Road Maintenance T- Specifications. Roadbed: 000-0.00 - Xxxxxxx. The portion of a road between the intersection of Subgrade and side slopessideslopes, excluding that portion of the ditch below Subgrade. 800-1.15 - Road Maintenance Plan. A table which shows applicable road maintenance specifications to be performed by Contractor on specific roads.

Appears in 1 contract

Samples: svrcd.org

Time is Money Join Law Insider Premium to draft better contracts faster.