Dust Control. Contractor, for the duration of the Contract, shall maintain all excavation, embankments, haul roads, plant sites, waste disposal areas, borrow areas, and all other Work areas free from dust, as determined by Owner or Owner’s Representative. Industry-accepted methods of dust control suitable for the area involved, such as sprinkling, light bituminous treatment or similar methods, will be permitted. No separate payment will be made for dust control. No chemical treatment or oil application is acceptable.
Appears in 4 contracts
Samples: Master Equipment Agreement, Master Equipment Agreement, Master Equipment Agreement
Dust Control. Contractor, for the duration of the Contract, shall maintain all excavation, embankments, haul roads, plant sites, waste disposal areas, borrow areas, and all other Work areas free from dust, as determined by Owner or Owner’s 's Representative. Industry-accepted methods of dust control suitable for the area involved, such as sprinkling, light bituminous treatment or similar methods, will be permitted. No separate payment will be made for dust control. No chemical treatment or oil application is acceptable.
Appears in 2 contracts
Samples: Master Construction Agreement, Master Construction Agreement
Dust Control. The Contractor, for the duration of the Contract, shall maintain all excavationexcavations, embankments, haul roads, permanent access roads, plant sites, waste disposal areas, borrow areas, areas and all other Work areas free work resulting from dust, as determined such Works. Dust shall be controlled by Owner or Owner’s Representativewater sprinkling. Industry-accepted methods of dust control suitable for the area involved, such as sprinkling, light No bituminous treatment or similar methods, will shall be permitted. No separate payment will be made for dust control. No chemical treatment or oil application is acceptableused unless otherwise directed.
Appears in 1 contract
Samples: Framework Agreement