Effect on PUD Preliminary Plan Sample Clauses

Effect on PUD Preliminary Plan. Rezoning of the Battle North Property as provided above will have the effect of terminating, and fully releasing Battle and the Town from any further rights, obligations or liabilities with respect to, the PUD Preliminary Plan as it applies to the Battle North Property. Simultaneous with approving the rezoning described herein, the Town will adopt a resolution formalizing the termination of Ordinance No. 12-Series 2008, Resolution No. 18-Series 2008, and Resolution No. 19-Series 2008, together with the Conditions to Approval and all other documents, instruments and matters appended to, attached to, referenced by and otherwise incorporated in said Resolutions.
AutoNDA by SimpleDocs

Related to Effect on PUD Preliminary Plan

  • Preliminary Evaluation Site evaluation and planning functions should proceed concurrently with the accomplishment of Schematic Design, Design Development, and Construction Documents. The Design Professional shall conduct a preliminary review of the site based on information furnished by the Owner. The Design Professional will advise the Owner of potential site-related problems that the Design Professional notes from such review.

  • Construction Progress Schedule A schedule indicating proposed activity sequences and durations, milestone dates for receipt and approval of pertinent information, preparation, submittal, and processing of Shop Drawings and Samples, delivery of materials or equipment requiring long-lead time procurement, and proposed date(s) of Material Completion and Occupancy and Final Completion. The schedule will be developed to represent the sixteen or seventeen CSI Specification Divisions. It shall have a minimum number of activities as required to adequately represent to Owner the complete scope of work and define the Project’s critical path and associated activities. If the Project is to be phased, then each individual Phase should be identified from start through completion of the overall Project and should be individually scheduled and described, including any Owner’s occupancy requirements and showing portions of the Project having occupancy priority. The format of the schedule will have dependencies indicated on a monthly grid identifying milestone dates such as construction start, phase construction, structural top out, dry-in, rough-in completion, metal stud and drywall completion, equipment installation, systems operational, Material Completion and Occupancy Date, final inspection dates, Punchlist, and Final Completion date.

  • Evaluation Plan The systematic blueprint detailing the evaluation aspects of the project.

  • Evaluation Schedule CLIENT REFERENCES The Tenderer shall provide details of his performance on each of the previous projects listed in the “Relevant Experience” returnable schedule. “Client Reference Scorecards” will be completed by each of the respective Clients for the projects listed in the “Relevant Experience” returnable schedule. The following are to be completed by the Client and Principal Agent and is to be supported in each case by a letter of award and the works completion certificate. Both Client and Principal Agent must sign and stamp the documents, failure to obtain both signatures and stamps will result in no allocation of points. PROJECT NAME and SCOPE OF WORK: Principal agent: ................................................................................................................................. Client: .. ..............................................................................................................................................

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • Construction Schedule The progress schedule of construction of the Project as provided by Developer and approved by District.

  • Job Evaluation Plan (a) The Employer agrees that no job evaluation plan pertaining to positions covered by this Agreement will be introduced without the mutual agreement of the Parties.

  • MWBE Utilization Plan A. In accordance with 5 NYCRR § 142.4, Bidders are required to submit a completed Utilization Plan on Form MWBE 100 with their bid.

  • Construction Change Directives 7.3.1 A Construction Change Directive is written order prepared by the Architect and signed by the Owner and Architect, directing a change in the Work and stating a proposed basis for adjustment, if any, in the Contract Sum, or Contract Time, or both. The Owner may by Construction Change Directive, without invalidating the Contract, order changes in the Work within the general scope of the Contract consisting of additions, deletions or other revisions, the Contract Sum and Contract Time being adjusting accordingly.

  • Rating Impact on Student Learning Growth ESE will provide model contract language and guidance on rating educator impact on student learning growth based on state and district-determined measures of student learning. Upon receiving this model contract language and guidance, the parties agree to bargain with respect to this matter.