Generators Temporary installation of generators, and permanent installation of generators that are placed inside existing non-residential buildings or that occupy an area under 50 square feet behind the building they serve.
ELECTRICAL SERVICES The Company must construct and reticulate electrical requirements for all amenities and facilities. The Company must construct sub-station and distribution boards necessary to reticulate power to all Company owned or leased facilities which provide amenities to the public. The electrical installation must be to the design and installation standards of the State Energy Commission of Western Australia. All electrical reticulation must be placed underground.
Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at a P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.
Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins. (2) Maintain waterbars, drainage dips, and other water diversion measures. (3) During active use, patrol and maintain functional drainage. (4) Repair damaged culvert ends.
Electrical Provide drawings for the following systems: .1 Lighting including circuiting and luminaire identification and switching. Also provide illuminance computer printout for all indoor typical indoor spaces and parking lots. .2 Convenience outlets and circuiting, special outlets and circuiting, television outlets, and power systems and equipment. Provide riser diagrams for all electrical systems including master clock, intercom, fire alarm, ITV, computer networking/telephone. Also, provide for emergency and normal power distribution. Provide luminaire schedule. .3 Panel schedule may be in preliminary form but circuitry must be included. .4 Applicable installation details. .5 General legend and list of abbreviations. .6 Voltage drop computation for all main feeders. .7 Short circuit analysis .8 Provide 1/2" scale floor plan and wall elevations for all electrical rooms.
Electric Service 1. The Authority shall make available Electric Service to enable the Customer to receive the Allocation in accordance with this Agreement, Service Tariff No. WNY-2 and the Rules. 2. The Customer shall not be entitled to receive Electric Service under this Agreement for any EP and/or RP allocation unless such EP and/or RP allocation is identified in Schedule A. 3. The Authority will provide, and the Customer shall accept and pay for, Electric Service with respect to the Allocation specified in Schedule A. If Schedule C specifies a Takedown Schedule for the Allocation, the Authority will provide, and the Customer shall accept and pay for, Electric Service with respect to the Allocation in accordance with such Takedown Schedule. 4. The Authority shall provide UCAP in amounts necessary to meet the Customer’s NYISO UCAP requirements associated with the Allocation in accordance with the NYISO Tariffs. The Customer shall be responsible to pay the Authority for such UCAP in accordance with Service Tariff No. WNY-2. 5. The provision of Electric Service associated with the Allocation is an unbundled service separate from the transmission and delivery of power and energy to the Customer. The Customer acknowledges and agrees that Customer’s local electric utility, not the Authority, shall be responsible for delivering the Allocation to the Facility specified in Schedule A in accordance with the applicable Utility Tariff(s). 6. The Contract Demand for the Customer’s Allocation may be modified by the Authority if the amount of Firm Power and Firm Energy available for sale as EP or RP from the Project is modified as required to comply with any ruling, order, or decision of any regulatory or judicial body having jurisdiction, including but not limited to FERC. Any such modification will be made on a pro rata basis to all EP and RP customers, as applicable, based on the terms of such ruling, order, or decision. 7. The Contract Demand may not exceed the Allocation. 8. The Customer’s Facility must be metered by the Customer’s local electric utility in a manner satisfactory to the Authority, or another metering arrangement satisfactory to the Authority must be provided (collectively, “Metering Arrangement”). A Metering Arrangement that is not satisfactory to the Authority shall be grounds, after notice to the Customer, for the Authority to modify, withhold, suspend, or terminate Electric Service to the Customer. If a Metering Arrangement is not made to conform to the Authority’s requirements within thirty
Electric If Customer has selected an Electricity Fixed Rate on the Application, Customer’s Price will be based on the Fixed Rate(s) which includes Local and State taxes, Gross Receipts Tax (GRT), PJM Adjustment (defined below) charges and adjustments and Utility applied charges and/or fees related to generation, plus the Administration Charge, which includes, Electricity Balancing Amount and third party utility and billing charges.
Electrical Service Electrical service for new construction or a renovated existing building shall be 480/277-volt, 3-phase, 4-wire or approved equal. Service shall be sized for HVAC and other mechanical system(s) loads, lighting, general building services, and dedicated computer based office equipment loads. 5 xxxxx per square foot shall be provided for lighting and general service receptacles. Size of neutral conductor of 3- phase circuits shall be twice that of phase conductor to accommodate potential harmonic currents associated with computer system electronic power supplies and fluorescent lighting fixtures electronic ballasts.
Lighting A system of fixtures providing or controlling the light sources used on or near the airport or within the airport buildings. The field lighting includes all luminous signals, markers, floodlights, and illuminating devices used on or near the airport or to aid in the operation of aircraft landing at, taking off from, or taxiing on the airport surface.
NETWORK INTERCONNECTION METHODS 3.1 The Interconnection provided herein may not be used solely for the purpose of originating a Party’s own interexchange traffic.