Electrical and Building Mechanical Sizing Sample Clauses

Electrical and Building Mechanical Sizing. Complete preliminary sizing for electrical and building mechanical items as follows. ▪ Perform heat gain and loss HVAC load calculations for building mechanical sizing. ▪ Prepare load calculation for generator sizing. ▪ Provide preliminary cabinet sizing to support building layout. ▪ Conduct initial electrical service coordination with PGE. o Electrical service sizing will initially consider the largest motor loads related to pump sizing alternatives and additional alternatives will be discussed with PGE.
AutoNDA by SimpleDocs

Related to Electrical and Building Mechanical Sizing

  • Electrical Provide drawings for the following systems:

  • Electrical Safety Only UL approved items are permitted in Housing & Residence Life. Extension and multi-use cords must be heavy duty, single plug, and be UL approved. Altering or adapting electrical outlets and equipment and overloading circuits jeopardize safety and thus are not permitted.

  • MAINTENANCE OF THE BUILDING /APARTMENT / PROJECT The Promoter shall be responsible to provide and maintain essential services in the Project till the taking over of the maintenance of the project by the Association upon the issuance of the completion certificate of the Project. The cost of such maintenance has been included in the Total Extras and Deposits as mentioned in clause 1.2.

  • Exterior Drainage Does water stand on the property for more than 24 hours after a heavy rain? Yes No Unknown Comments Are gutters and downspouts in good repair? Yes No Unknown Comments:

  • Electrical Equipment Residents must use only CSA, UL-approved or Canadian-certified electrical equipment; the rated wattage of light fixtures must never be exceeded; and only replacement bulbs supplied by Waterloo maintenance staff may be used. Do not leave any unattended electrical equipment turned on (i.e. hair straighteners, lights etc.)

  • Building Maintenance The host facility provider shall maintain (in a state of good repair) all buildings used for the educational program. All damages made by the AGENCY’s program will be the responsibility of the AGENCY to repair.

  • Lighting A system of fixtures providing or controlling the light sources used on or near the airport or within the airport buildings. The field lighting includes all luminous signals, markers, floodlights, and illuminating devices used on or near the airport or to aid in the operation of aircraft landing at, taking off from, or taxiing on the airport surface.

  • Building Use Agency facilities may be used for Union activities according to current building use policies, so long as the facility is available and proper scheduling has been arranged.

  • Mechanical a. Heating and cooling load calculations as required and major duct or pipe runs sized to interface with structural.

  • Electrical appliance safety The Hirer shall ensure that any electrical appliances brought by them to the premises and used there shall be safe, in good working order, and used in a safe manner in accordance with the Electricity at Work Regulations 1989. Where a residual circuit breaker is provided the hirer must make use of it in the interests of public safety.

Time is Money Join Law Insider Premium to draft better contracts faster.