Condition Evaluation of Force Main Sample Clauses

Condition Evaluation of Force Main. Conduct non-destructive FM condition assessment to include the following. ▪ Visual inspection of the pipeline suspended on the bridge, where it is accessible. ▪ Confirm air valve condition by visual inspection and confirm operation of valve. ▪ Collect ultrasonic thickness readings to determine remaining pipe wall thickness at inspection location. ▪ Perform head and flow testing to estimate internal roughness of force main system. ▪ Inspect three-way plug valve that was installed in the early 2000s at the connection to the HDPE section of FM to determine if there is corrosion and if it is a potential failure point. A summary of the condition evaluation performed, and recommendations for additional evaluations or pipe replacement will be included in the preliminary design report, as applicable. If the condition evaluation determines that there are significant concerns about the condition of the force main pipe located on the bridge and more intrusive destructive-type evaluations are recommended, that additional work will be negotiated with the City under a separate scope of work. Task Deliverables ▪ Kickoff meeting minutes ▪ Topographic survey map and CAD file ▪ Condition evaluation forms ▪ Draft and final Geotechnical Data Report and Engineering Report Assumptions ▪ Kick-off meeting to be held remotely using a virtual meeting format acceptable to the City. ▪ City to provide applicable pump station documents and information to Consultant within three (3) days of Consultants information request. ▪ Lift station condition evaluations will be completed by up to five (5) members of the Consultant team. City will provide calibrated pressure gauges at the pump station to conduct flow and head testing. ▪ Force main condition evaluations will be completed by up to three (3) members of the Consultant team. City will locate and expose plug valve. ▪ Structural evaluation will be limited to visual observation and review of as-built documentation. No destructive investigation will be performed. If additional investigations or mitigation of seismic deficiencies are required they will be negotiated with the City under a separate scope of work. ▪ Geotechnical subsurface explorations assumptions: o All necessary right-of-entry permits will be provided by the City. o The subsurface material is not contaminated, and no testing will be performed to investigate the possible presence of toxic or hazardous materials and petroleum products. o No permits will be required, including p...
AutoNDA by SimpleDocs

Related to Condition Evaluation of Force Main

  • Definition of Force Majeure For the purposes of this section, an event of force majeure shall mean any cause beyond the control of the affected Interconnection Party or Construction Party, including but not restricted to, acts of God, flood, drought, earthquake, storm, fire, lightning, epidemic, war, riot, civil disturbance or disobedience, labor dispute, labor or material shortage, sabotage, acts of public enemy, explosions, orders, regulations or restrictions imposed by governmental, military, or lawfully established civilian authorities, which, in any of the foregoing cases, by exercise of due diligence such party could not reasonably have been expected to avoid, and which, by the exercise of due diligence, it has been unable to overcome. Force majeure does not include (i) a failure of performance that is due to an affected party’s own negligence or intentional wrongdoing; (ii) any removable or remediable causes (other than settlement of a strike or labor dispute) which an affected party fails to remove or remedy within a reasonable time; or (iii) economic hardship of an affected party.

  • Notification of Force Majeure Event 11.5.1 The Affected Party shall give notice to the other Party of any event of Force Majeure as soon as reasonably practicable, but not later than seven (7) days after the date on which such Party knew or should reasonably have known of the commencement of the event of Force Majeure. If an event of Force Majeure results in a breakdown of communications rendering it unreasonable to give notice within the applicable time limit specified herein, then the Party claiming Force Majeure shall give such notice as soon as reasonably practicable after reinstatement of communications, but not later than one (1) day after such reinstatement. Provided that such notice shall be a pre-condition to the Affected Party’s entitlement to claim relief under this Agreement. Such notice shall include full particulars of the event of Force Majeure, its effects on the Party claiming relief and the remedial measures proposed. The Affected Party shall give the other Party regular (and not less than monthly) reports on the progress of those remedial measures and such other information as the other Party may reasonably request about the Force Majeure Event.

  • Mitigation of Force Majeure The suspension of a Party’s performance under the Agreement due to a claim of Force Majeure shall be of no greater scope and of no longer duration than is required by the Force Majeure event. A Party suspending performance due to Force Majeure shall take, or cause to be taken, such action as may be necessary to void, or nullify, or otherwise to mitigate, in all material respects, the effects of such event of Force Majeure. The Parties shall take all reasonable steps to resume normal performance under this Agreement after the cessation of any Force Majeure event. If Seller cannot meet the Expected Initial Delivery Date as a result of a Force Majeure event declared by Seller in accordance with Article Two, then Seller shall work diligently to resolve the effect of the Force Majeure and provide evidence of its efforts promptly upon Xxxxx’s written request.

  • Duration of Force Majeure An Interconnection Party shall not be responsible, or considered to be in Breach or Default under this Interconnection Service Agreement, for any non-performance, any interruption or failure of service, deficiency in the quality or quantity of service, or any other failure to perform any obligation hereunder to the extent that such failure or deficiency is due to Force Majeure. An Interconnection Party shall be excused from whatever performance is affected only for the duration of the Force Majeure and while the Interconnection Party exercises Reasonable Efforts to alleviate such situation. As soon as the non-performing Interconnection Party is able to resume performance of its obligations excused because of the occurrence of Force Majeure, such Interconnection Party shall resume performance and give prompt notice thereof to the other parties.

  • Events of Force Majeure Neither Party shall be held liable or responsible to the other Party nor be deemed to be in default under, or in breach of any provision of, this Agreement for failure or delay in fulfilling or performing any obligation of this Agreement when such failure or delay is due to force majeure, and without the fault or negligence of the Party so failing or delaying. For purposes of this Agreement, force majeure is defined as causes beyond the control of the Party, including, without limitation, acts of God; acts, regulations, or laws of any government; war; civil commotion; destruction of production facilities or materials by fire, flood, earthquake, explosion or storm; labor disturbances; epidemic; and failure of public utilities or common carriers. In such event Medistem or Licensee, as the case may be, shall immediately notify the other Party of such inability and of the period for which such inability is expected to continue. The Party giving such notice shall thereupon be excused from such of its obligations under this Agreement as it is thereby disabled from performing for so long as it is so disabled and the 30 days thereafter. To the extent possible, each Party shall use reasonable efforts to minimize the duration of any force majeure.

  • Suspension of Rules Relating to Recalcitrant Accounts The United States shall not require a Reporting [FATCA Partner] Financial Institution to withhold tax under section 1471 or 1472 of the U.S. Internal Revenue Code with respect to an account held by a recalcitrant account holder (as defined in section 1471(d)(6) of the U.S. Internal Revenue Code), or to close such account, if the U.S. Competent Authority receives the information set forth in paragraph 2 of Article 2 of this Agreement, subject to the provisions of Article 3 of this Agreement, with respect to such account.

  • Effect of Force Majeure Event If either party to this contract cannot meet an obligation under this contract because of an event outside the control of that party (‘a force majeure event’):

  • Complete Disposal Upon Termination of Service Agreement Upon Termination of the Service Agreement Provider shall dispose or delete all Student Data obtained under the Service Agreement. Prior to disposition of the data, Provider shall notify LEA in writing of its option to transfer data to a separate account, pursuant to Article II, section 3, above. In no event shall Provider dispose of data pursuant to this provision unless and until Provider has received affirmative written confirmation from LEA that data will not be transferred to a separate account.

  • Effect of Force Majeure If either Party is rendered wholly or partially unable to perform its obligations under this Agreement because of a Force Majeure Act, that Party shall be excused from whatever performance is affected by the Force Majeure Act to the extent so affected, provided that:

  • Duration of relief for force majeure The right of an Affected Party to relief under Clause 17.2 shall cease on the earlier of:

Time is Money Join Law Insider Premium to draft better contracts faster.