Electrical/Instrumentation. All electrical components shall be protected from wet weather, station flooding, and corrosion to the satisfaction of the City. All stations shall be designed with an enclosed full-time backup generator with sound attenuation, an automatic transfer switch, and a fuel supply capable of operating the station for 24 hours. The control panel shall include standard City telemetry system and remote monitoring and controls at the City’s South Wastewater Treatment Plant. A magnetic flow meter in a vault shall be required at each lift station. The station shall be a fully integrated station with the wet well, wet well pumps and piping, electrical power and power controls, redundant level controls, emergency backup power, fuel system, pumping station system appurtenances, etc.
Appears in 2 contracts
Samples: www.ci.madras.or.us, www.ci.madras.or.us
Electrical/Instrumentation. All electrical components shall be protected from wet weather, station flooding, and corrosion to the satisfaction of the City. All stations shall be designed with an enclosed full-full time backup generator with sound attenuation, an automatic transfer switch, and a fuel supply capable of operating the station for 24 hours. The control panel shall include standard City telemetry system and remote monitoring and controls at the City’s South Wastewater Treatment Plant. A magnetic flow meter in a vault shall be required at each lift station. The station shall be a fully integrated station with the wet well, wet well pumps and piping, electrical power and power controls, redundant level controls, emergency backup power, fuel system, pumping station system appurtenances, etc.
Appears in 2 contracts
Samples: www.ci.madras.or.us, www.ci.madras.or.us