Electrical Interconnection. The evacuation of electric power to be generated by the Facility, will be through Chandpur 132/33 kV Grid Substation, Chandpur, Bangladesh. The proposed power plant will be connected to the Chandpur 132/33 kV Grid Substation, Chandpur by a single ckt 132 kV (O/H or U/G, as required) line (Interconnection line) from proposed power plant. This interconnection line will be implemented by the Project Company at its own cost and responsibility. The Company shall be responsible to maintain, operate and repair (including any replacement of the equipment) this interconnection line at its own cost and responsibility during the Term of the Power Purchase Agreement. The Sponsor will also arrange necessary right of way for constructing Electrical Interconnection from its power plant to PGCB’s substation. In addition to that the Project Sponsor will install, operate & maintain separate 132 kV synchronizing breaker for its machine at the high voltage side of step-up Transformer and also construct the connecting lines for connection. The required 132 kV GIS bay extension including circuit breaker, CT, PT, panel etc. of Chandpur 132/33 kV Grid Substation, Chandpur will be implemented by the Project Sponsor at its own cost and responsibility. The Sponsor will arrange necessary land for construction of 132 kV bay (if required). The evacuation system will be completed in consultation and approval of Power Grid Company of Bangladesh (PGCB). The Facility will be constructed at a land near to Chandpur 132/33 kV Grid Substation, Chandpur to be arranged by the Company at its own cost. Required development, filling upto final elevation, leveling, compacting etc. of the land will be the responsibility of the Company. The access road to the Site will also be the responsibility of the Company. The Company shall also generate matching MVARh corresponding to maintain the power factor 0.85 lagging, so that there is no adverse effect on the Grid System. If needed to satisfy the requirement in this Section 3.2, the Company, to enhance the Reactive Power capability of the Facility, at its own cost and expense, shall install a static VAR compensator (SVC), a static synchronous compensator (SATCOM), and/or other reactive support equipment at the Facility. Due to the connection of the Facility to the electrical system, if any impact on grid happens (Like: Low voltage problem, Stability problem, Frequency problem etc.) which needs to be sort out and completion of necessary measures to mitigate the impacts by a technical consultant organization with the Sponsor's own cost and responsibility. Construction of 132 KV Interconnection Line up to the Chandpur 132/33 kV Substation, Chandpur (including arrangement of land and Right of Way) from the Project, required bay extension in the Chandpur 132/33 kV Substation, with all equipments shall be the Sponsor's responsibility at its own cost as per BPDB/PGCB's advice. The Sponsor shall be responsible for the required compensation in getting the Rights of Way including land (if any) for this Interconnection Line.
Appears in 2 contracts
Electrical Interconnection. The evacuation of electric power to be generated by the Facility, will be through Chandpur Xxx'x Bazar 132/33 kV Grid Substation, ChandpurXxx'x Bazar, Bangladesh. The proposed power plant will be connected to the Chandpur Xxx'x Bazar 132/33 kV Grid Substation, Chandpur Xxx'x Bazar by a single ckt 132 kV (O/H or U/G, as required) line (Interconnection line) from proposed power plant. This interconnection line will be implemented by the Project Company at its own cost and responsibility. The Company shall be responsible to maintain, operate and repair (including any replacement of the equipment) this interconnection line at its own cost and responsibility during the Term of the Power Purchase Agreement. The Sponsor will also arrange necessary right of way for constructing Electrical Interconnection from its power plant to PGCB’s substation. In addition to that the Project Sponsor will install, operate & maintain separate 132 kV synchronizing breaker for its machine at the high voltage side of step-up Transformer and also construct the connecting lines for connection. The required 132 kV GIS bay extension including circuit breaker, CT, PT, panel etc. of Chandpur Xxx'x Bazar 132/33 kV Grid Substation, Chandpur Xxx'x Bazar will be implemented by the Project Sponsor at its own cost and responsibility. The Sponsor will arrange necessary land for construction of 132 kV GIS bay (if required). The evacuation system will be completed in consultation and approval of Power Grid Company of Bangladesh (PGCB). The Facility will be constructed at a land near to Chandpur Xxx'x Bazar 132/33 kV Grid Substation, Chandpur Xxx'x Bazar to be arranged by the Company at its own cost. Required development, filling upto final elevation, leveling, compacting etc. of the land will be the responsibility of the Company. The access road to the Site will also be the responsibility of the Company. The Company shall also generate matching MVARh corresponding to maintain the power factor 0.85 lagging, so that there is no adverse effect on the Grid System. If needed to satisfy the requirement in this Section 3.2, the Company, to enhance the Reactive Power capability of the Facility, at its own cost and expense, shall install a static VAR compensator (SVC), a static synchronous compensator (SATCOM), and/or other reactive support equipment at the Facility. Due to the connection of the Facility to the electrical system, if any impact on grid happens (Like: Low voltage problem, Stability problem, Frequency problem etc.) which needs to be sort out and completion of necessary measures to mitigate the impacts by a technical consultant organization with the Sponsor's own cost and responsibility. Construction of 132 KV Interconnection Line up to the Chandpur Xxx'x Bazar 132/33 kV Substation, Chandpur Xxx'x Bazar (including arrangement of land and Right of Way) from the Project, required GIS bay extension in the Chandpur Xxx'x Bazar 132/33 kV Substation, with all equipments shall be the Sponsor's responsibility at its own cost as per BPDB/PGCB's advice. The Sponsor shall be responsible for the required compensation in getting the Rights of Way including land (if any) for this Interconnection Line.
Appears in 1 contract
Samples: Power Purchase Agreement
Electrical Interconnection. The evacuation of electric power to be generated by the Facility, will be through Chandpur Xxx'x Bazar 132/33 kV Grid Substation, ChandpurXxx'x Bazar, Bangladesh. The proposed power plant will be connected to the Chandpur Xxx'x Bazar 132/33 kV Grid Substation, Chandpur Xxx'x Bazar by a single ckt 132 kV (O/H or U/G, as required) line (Interconnection line) from proposed power plant. This interconnection line will be implemented by the Project Company at its own cost and responsibility. The Company shall be responsible to maintain, operate and repair (including any replacement of the equipment) this interconnection line at its own cost and responsibility during the Term of the Power Purchase Agreement. The Sponsor will also arrange necessary right of way for constructing Electrical Interconnection from its power plant to PGCB’s substation. In addition to that the Project Sponsor will install, operate & maintain separate 132 kV synchronizing breaker for its machine at the high voltage side of step-up Transformer and also construct the connecting lines for connection. The required 132 kV GIS bay extension including circuit breaker, CT, PT, panel etc. of Chandpur Xxx'x Bazar 132/33 kV Grid Substation, Chandpur Xxx'x Bazar will be implemented by the Project Sponsor at its own cost and responsibility. The Sponsor will arrange necessary land for construction of 132 kV GIS bay (if required). The evacuation system will be completed in consultation and approval of Power Grid Company of Bangladesh (PGCB). The Facility will be constructed at a land near to Chandpur Xxx'x Bazar 132/33 kV Grid Substation, Chandpur Xxx'x Bazar to be arranged by the Company at its own cost. Required development, filling upto final elevation, leveling, compacting etc. of the land will be the responsibility of the Company. The access road to the Site will also be the responsibility of the Company. The Company shall also generate matching MVARh corresponding to maintain the power factor 0.85 lagging, so that there is no adverse effect on the Grid System. If needed to satisfy the requirement in this Section 3.2, the Company, to enhance the Reactive Power capability of the Facility, at its own cost and expense, shall install a static VAR compensator (SVC), a static synchronous compensator (SATCOM), and/or other reactive support equipment at the Facility. Due to the connection of the Facility to the electrical system, if any impact on grid happens (Like: Low voltage problem, Stability problem, Frequency problem etc.) which needs to be sort out and completion of necessary measures to mitigate the impacts by a technical consultant organization with the Sponsor's own cost and responsibility. Construction of 132 KV Interconnection Line up to the Chandpur Xxx'x Bazar 132/33 kV Substation, Chandpur Xxx'x Bazar (including arrangement of land and Right of Way) from the Project, required GIS bay extension in the Chandpur Xxx'x Bazar 132/33 kV Substation, with all equipments shall be the Sponsor's responsibility at its own cost as per BPDB/PGCB's advice. The Sponsor shall be responsible for the required compensation in getting the Rights of Way including land (if any) for this Interconnection Line.
Appears in 1 contract
Samples: Implementation Agreement
Electrical Interconnection. The evacuation of electric power to be generated by the Facility, will be through Chandpur Mongla 132/33 kV Grid Substation, ChandpurBagerhat or Gollamari 132/33 kV Grid Substation, Khulna, Bangladesh. The proposed power plant will be connected to the Chandpur Mongla 132/33 kV Grid Substation, Chandpur Bagerhat or Gollamari 132/33 kV Grid Substation, Khulna by a single ckt 132 kV (O/H or U/G, as required) line (Interconnection line) from proposed power plant. This interconnection line will be implemented by the Project Company at its own cost and responsibility. The Company shall be responsible to maintain, operate and repair (including any replacement of the equipment) this interconnection line at its own cost and responsibility during the Term of the Power Purchase Agreement. The Sponsor will also arrange necessary right of way for constructing Electrical Interconnection from its power plant to PGCB’s substation. In addition to that the Project Sponsor will install, operate & maintain separate 132 kV synchronizing breaker for its machine at the high voltage side of step-up Transformer and also construct the connecting lines for connection. The required 132 kV GIS bay extension including circuit breaker, CT, PT, panel etc. of Chandpur Mongla 132/33 kV Grid Substation, Chandpur Bagerhat or Gollamari 132/33 kV Grid Substation, Khulna will be implemented by the Project Sponsor at its own cost and responsibility. The Sponsor will arrange necessary land for construction of 132 kV GIS bay (if required). The evacuation system will be completed in consultation and approval of Power Grid Company of Bangladesh (PGCB). The Facility will be constructed at a land near to Chandpur Mongla 132/33 kV Grid Substation, Chandpur Bagerhat or Gollamari 132/33 kV Grid Substation, Khulna to be arranged by the Company at its own cost. Required development, filling upto final elevation, leveling, compacting etc. of the land will be the responsibility of the Company. The access road to the Site will also be the responsibility of the Company. The Company shall also generate matching MVARh corresponding to maintain the power factor 0.85 lagging, so that there is no adverse effect on the Grid System. If needed to satisfy the requirement in this Section 3.2, the Company, to enhance the Reactive Power capability of the Facility, at its own cost and expense, shall install a static VAR compensator (SVC), a static synchronous compensator (SATCOM), and/or other reactive support equipment at the Facility. Due to the connection of the Facility to the electrical system, if any impact on grid happens (Like: Low voltage problem, Stability problem, Frequency problem etc.) which needs to be sort out and completion of necessary measures to mitigate the impacts by a technical consultant organization with the Sponsor's own cost and responsibility. Construction of 132 KV Interconnection Line up to the Chandpur Mongla 132/33 kV Grid Substation, Chandpur Bagerhat or Gollamari 132/33 kV Grid Substation, Khulna (including arrangement of land and Right of Way) from the Project, required GIS bay extension in the Chandpur Mongla 132/33 kV Grid Substation, Bagerhat or Gollamari 132/33 kV Grid Substation, Khulna, with all equipments shall be the Sponsor's responsibility at its own cost as per BPDB/PGCB's advice. The Sponsor shall be responsible for the required compensation in getting the Rights of Way including land (if any) for this Interconnection Line.
Appears in 1 contract
Samples: Power Purchase Agreement
Electrical Interconnection. The evacuation of electric power to be generated by the Facility, will be through Chandpur Kachua 132/33 kV Grid Substation, Chandpur, Bangladesh. The proposed power plant will be connected to the Chandpur Kachua 132/33 kV Grid Substation, Chandpur by a single ckt 132 kV (O/H or U/G, as required) line (Interconnection line) from proposed power plant. This interconnection line will be implemented by the Project Company at its own cost and responsibility. The Company shall be responsible to maintain, operate and repair (including any replacement of the equipment) this interconnection line at its own cost and responsibility during the Term of the Power Purchase Agreement. The Sponsor will also arrange necessary right of way for constructing Electrical Interconnection from its power plant to PGCB’s substation. In addition to that the Project Sponsor will install, operate & maintain separate 132 kV synchronizing breaker for its machine at the high voltage side of step-up Transformer and also construct the connecting lines for connection. The required 132 kV GIS bay extension including circuit breaker, CT, PT, panel etc. of Chandpur Kachua 132/33 kV Grid Substation, Chandpur will be implemented by the Project Sponsor at its own cost and responsibility. The Sponsor will arrange necessary land for construction of 132 kV bay (if required). The evacuation system will be completed in consultation and approval of Power Grid Company of Bangladesh (PGCB). The Facility will be constructed at a land near to Chandpur Kachua 132/33 kV Grid Substation, Chandpur to be arranged by the Company at its own cost. Required development, filling upto final elevation, leveling, compacting etc. of the land will be the responsibility of the Company. The access road to the Site will also be the responsibility of the Company. The Company shall also generate matching MVARh corresponding to maintain the power factor 0.85 lagging, so that there is no adverse effect on the Grid System. If needed to satisfy the requirement in this Section 3.2, the Company, to enhance the Reactive Power capability of the Facility, at its own cost and expense, shall install a static VAR compensator (SVC), a static synchronous compensator (SATCOM), and/or other reactive support equipment at the Facility. Due to the connection of the Facility to the electrical system, if any impact on grid happens (Like: Low voltage problem, Stability problem, Frequency problem etc.) which needs to be sort out and completion of necessary measures to mitigate the impacts by a technical consultant organization with the Sponsor's own cost and responsibility. Construction of 132 KV Interconnection Line up to the Chandpur Kachua 132/33 kV Substation, Chandpur (including arrangement of land and Right of Way) from the Project, required bay extension in the Chandpur Kachua 132/33 kV Substation, with all equipments shall be the Sponsor's responsibility at its own cost as per BPDB/PGCB's advice. The Sponsor shall be responsible for the required compensation in getting the Rights of Way including land (if any) for this Interconnection Line.
Appears in 1 contract
Samples: Power Purchase Agreement