Common use of Electrical Protection, Communication and Instrument Systems Clause in Contracts

Electrical Protection, Communication and Instrument Systems. The Company shall provide a complete and comprehensive protection system for the generators/generator transformers/service transformers, transmission lines and the station electrical distribution systems. The Company shall undertake the installation of the protection relay panels within the control room, wiring between panels and switchyard equipment, and commissioning tests of the protection schemes. Communication, control, monitoring and voice channels shall be provided between the power station and PGCB’s National/Regional Control Center by the Company in consultation with PGCB. SCADA, communication, telemetry, fiber optical terminal, and tele-protection equipment shall be supplied and installed by the Company and shall be compatible with PGCB equipment and systems. The wiring of all signaling and control circuits required for the system shall be cabled out to interface marshalling cubicles by the Company. The Company shall supply and install necessary cabling and cubicles. Cabling between the Company’s cubicles and PGCB’ LDC equipment shall be provided and installed by the Company. The Company shall provide the following tele-control facilities required at the LDC: □ Control of the 230 kV circuit switches and reset of trip relays. □ Control of generator active MW and reactive MVAr. □ Indications of 230 kV switches and trip relays activated. □ Measurement of 230 kV circuit MW, MVAr, and voltage quantities. □ Alarm facilities in the event of any 230 kV circuit tripping and protection-operated and communication equipment failure.

Appears in 1 contract

Samples: Power Purchase Agreement

AutoNDA by SimpleDocs

Electrical Protection, Communication and Instrument Systems. The Company shall provide a complete and comprehensive protection system for the generators/generator transformers/service transformers, transmission lines and the station electrical distribution systems. The Company shall undertake the installation of the protection relay panels within the control room, wiring between panels and switchyard equipment, and commissioning tests of the protection schemes. Communication, control, monitoring and voice channels shall be provided between the power station and PGCBDPDC’s National/Regional Control Center by the Company in consultation with PGCBDPDC. SCADA, communication, telemetry, fiber optical terminal, and tele-protection equipment shall be supplied and installed by the Company and shall be compatible with PGCB DPDC equipment and systems. The wiring of all signaling and control circuits required for the system shall be cabled out to interface marshalling cubicles by the Company. The Company shall supply and install necessary cabling and cubicles. Cabling between the Company’s cubicles and PGCB’ LDC DPDC equipment shall be provided and installed by the Company. The Company shall provide the following tele-control facilities required at the LDC: Control of the 230 33 kV circuit switches and reset of trip relays. □ Control of generator active MW and reactive MVAr. □ Indications of 230 33 kV switches and trip relays activated. Measurement of 230 33 kV circuit MW, MVAr, and voltage quantities. □ quantities  Alarm facilities in the event of any 230 33 kV circuit tripping and protection-protection- operated and communication equipment failure.

Appears in 1 contract

Samples: Implementation Agreement

Electrical Protection, Communication and Instrument Systems. The Company shall provide a complete and comprehensive protection system for the generators/generator transformers/service transformers, transmission lines and the station electrical distribution systems. The Company shall undertake the installation of the protection relay panels within the control room, wiring between panels and switchyard equipment, and commissioning tests of the protection schemes. Communication, control, monitoring and voice channels shall be provided between the power station and PGCB’s National/Regional Control Center by the Company in consultation with PGCB. SCADA, communication, telemetry, fiber optical terminal, and tele-protection equipment shall be supplied and installed by the Company and shall be compatible with PGCB equipment and systems. The wiring of all signaling and control circuits required for the system shall be cabled out to interface marshalling cubicles by the Company. The Company shall supply and install necessary cabling and cubicles. Cabling between the Company’s cubicles and PGCB’ LDC equipment shall be provided and installed by the Company. The Company shall provide the following tele-control facilities required at the LDC: □ Control of the 230 kV circuit switches and reset of trip relays. □ Control of generator active MW and reactive MVAr. □ Indications of 230 kV switches and trip relays activated. □ Measurement of 230 kV circuit MW, MVAr, and voltage quantities. □ Alarm facilities in the event of any 230 kV circuit tripping and protection-operated and communication equipment failure.

Appears in 1 contract

Samples: Power Purchase Agreement

Electrical Protection, Communication and Instrument Systems. The Company shall provide a complete and comprehensive protection system for the generators/generator transformers/service transformers, transmission lines and the station electrical distribution systems. The Company shall undertake the installation of the protection relay panels within the control room, wiring between panels and switchyard equipment, and commissioning tests of the protection schemes. Communication, control, monitoring and voice channels shall be provided between the power station and PGCB’s National/Regional Control Center by the Company in consultation with PGCB. SCADA, communication, telemetry, fiber optical terminal, and tele-protection equipment shall be supplied and installed by the Company and shall be compatible with PGCB equipment and systems. The wiring of all signaling and control circuits required for the system shall be cabled out to interface marshalling cubicles by the Company. The Company shall supply and install necessary cabling and cubicles. Cabling between the Company’s cubicles and PGCB’ LDC equipment shall be provided and installed by the Company. The Company shall provide the following tele-control facilities required at the LDC: Control of the 230 132 kV circuit switches and reset of trip relays. Control of generator active MW and reactive MVAr. Indications of 230 132 kV switches and trip relays activated. Measurement of 230 132 kV circuit MW, MVAr, and voltage quantities. Alarm facilities in the event of any 230 132 kV circuit tripping and protection-operated and communication equipment failure.

Appears in 1 contract

Samples: Power Purchase Agreement

Electrical Protection, Communication and Instrument Systems. The Company shall provide a complete and comprehensive protection system for the generators/generator transformers/service transformers, transmission lines and the station electrical distribution systems. The Company shall undertake the installation of the protection relay panels within the control room, wiring between panels and switchyard equipment, and commissioning tests of the protection schemes. Communication, control, monitoring and voice channels shall be provided between the power station and PGCBDPDC’s National/Regional Control Center by the Company in consultation with PGCBDPDC. SCADA, communication, telemetry, fiber optical terminal, and tele-protection equipment shall be supplied and installed by the Company and shall be compatible with PGCB DPDC equipment and systems. The wiring of all signaling and control circuits required for the system shall be cabled out to interface marshalling cubicles by the Company. The Company shall supply and install necessary cabling and cubicles. Cabling between the Company’s cubicles and PGCBDPDC’ LDC equipment shall be provided and installed by the Company. The Company shall provide the following tele-control facilities required at the LDC: Control of the 230 33 kV circuit switches and reset of trip relays. Control of generator active MW and reactive MVAr. Indications of 230 33 kV switches and trip relays activated. Measurement of 230 33 kV circuit MW, MVAr, and voltage quantities. Alarm facilities in the event of any 230 33 kV circuit tripping and protection-protection- operated and communication equipment failure.

Appears in 1 contract

Samples: Power Purchase Agreement

Electrical Protection, Communication and Instrument Systems. The Company shall provide a complete and comprehensive protection system for the generators/generator transformers/service transformers, transmission lines and the station electrical distribution systems. The Company shall undertake the installation of the protection relay panels within the control room, wiring between panels and switchyard equipment, and commissioning tests of the protection schemes. Communication, control, monitoring and voice channels shall be provided between the power station and PGCB’s National/Regional Control Center by the Company in consultation with PGCB. SCADA, communication, telemetry, fiber optical terminal, and tele-protection equipment shall be supplied and installed by the Company and shall be compatible with PGCB equipment and systems. The wiring of all signaling and control circuits required for the system shall be cabled out to interface marshalling cubicles by the Company. The Company shall supply and install necessary cabling and cubicles. Cabling between the Company’s cubicles and PGCB’ LDC equipment shall be provided and installed by the Company. The Company shall provide the following tele-control facilities required at the LDC: □ Control of the 230 132 kV circuit switches and reset of trip relays. □ Control of generator active MW and reactive MVAr. □ Indications of 230 132 kV switches and trip relays activated. □ Measurement of 230 132 kV circuit MW, MVAr, and voltage quantities. □ Alarm facilities in the event of any 230 132 kV circuit tripping and protection-operated and communication equipment failure.

Appears in 1 contract

Samples: Power Purchase Agreement

AutoNDA by SimpleDocs

Electrical Protection, Communication and Instrument Systems. The Company shall provide a complete and comprehensive protection system for the generators/generator transformers/service transformers, transmission lines and the station electrical distribution systems. The Company shall undertake the installation of the protection relay panels within the control room, wiring between panels and switchyard equipment, and commissioning tests of the protection schemes. Communication, control, monitoring and voice channels shall be provided between the power station and PGCBREB’s National/Regional Control Center by the Company in consultation with PGCBREB. SCADA, communication, telemetry, fiber optical terminal, and tele-protection equipment shall be supplied and installed by the Company and shall be compatible with PGCB REB equipment and systems. The wiring of all signaling and control circuits required for the system shall be cabled out to interface marshalling cubicles by the Company. The Company shall supply and install necessary cabling and cubicles. Cabling between the Company’s cubicles and PGCBREB’ LDC equipment shall be provided and installed by the Company. The Company shall provide the following tele-control facilities required at the LDC: Control of the 230 11 kV circuit switches and reset of trip relays. Control of generator active MW and reactive MVAr. Indications of 230 11 kV switches and trip relays activated. Measurement of 230 11 kV circuit MW, MVAr, and voltage quantities. Alarm facilities in the event of any 230 11 kV circuit tripping and protection-protection- operated and communication equipment failure.

Appears in 1 contract

Samples: Power Purchase Agreement

Electrical Protection, Communication and Instrument Systems. The Company shall provide a complete and comprehensive protection system for the generators/generator transformers/service transformers, transmission lines and the station electrical distribution systems. The Company shall undertake the installation of the protection relay panels within the control room, wiring between panels and switchyard equipment, and commissioning tests of the protection schemes. Communication, control, monitoring and voice channels shall be provided between the power station and PGCBDPDC’s National/Regional Control Center by the Company in consultation with PGCBDPDC. SCADA, communication, telemetry, fiber optical terminal, and tele-protection equipment shall be supplied and installed by the Company and shall be compatible with PGCB DPDC equipment and systems. The wiring of all signaling and control circuits required for the system shall be cabled out to interface marshalling cubicles by the Company. The Company shall supply and install necessary cabling and cubicles. Cabling between the Company’s cubicles and PGCB’ LDC DPDC equipment shall be provided and installed by the Company. The Company shall provide the following tele-control facilities required at the LDC: Control of the 230 33 kV circuit switches and reset of trip relays. □ Control of generator active MW and reactive MVAr. □ Indications of 230 33 kV switches and trip relays activated. Measurement of 230 33 kV circuit MW, MVAr, and voltage quantities. □ quantities  Alarm facilities in the event of any 230 33 kV circuit tripping and protection-operated and communication equipment failure.

Appears in 1 contract

Samples: Implementation Agreement

Electrical Protection, Communication and Instrument Systems. The Company shall provide a complete and comprehensive protection system for the generators/generator transformers/service transformers, transmission lines and the station electrical distribution systems. The Company shall undertake the installation of the protection relay panels within the control room, wiring between panels and switchyard equipment, and commissioning tests of the protection schemes. Communication, control, monitoring and voice channels shall be provided between the power station and PGCB’s National/Regional Control Center by the Company in consultation with PGCB. SCADA, communication, telemetry, fiber optical terminal, and tele-protection equipment shall be supplied and installed by the Company and shall be compatible with PGCB equipment and systems. The wiring of all signaling and control circuits required for the system shall be cabled out to interface marshalling cubicles by the Company. The Company shall supply and install necessary cabling and cubicles. Cabling between the Company’s cubicles and PGCB’ LDC equipment shall be provided and installed by the Company. The Company shall provide the following tele-control facilities required at the LDC: □ Control of the 230 132 kV circuit switches and reset of trip relays. □ Control of generator active MW and reactive MVAr. □ Indications of 230 132 kV switches and trip relays activated. □ Measurement of 230 132 kV circuit MW, MVAr, and voltage quantities. □ Alarm facilities in the event of any 230 132 kV circuit tripping and protection-operated and communication equipment failure.