Engineering Analysis and Sample Clauses

Engineering Analysis and. GeoSyntec will perform required engineering analysis and design for the Z-wall retaining structure. The engineering analysis will include both geotechnical and structural calculations to design the Z-wall. We understand that electrical service to the recycling center is sufficient and have therefore assumed that no upgrades or revisions to the electrical service will be required. Assuming that the Z-wall will remain near its existing location, GeoSyntec proposes three geotechnical borings (varying between 30 0379 feet and 50 feet) to collect geotechnical information about the foundation conditions in the area and evaluate liquefaction potential if required. GeoSyntec will also complete some laboratory testing moisture, density, gradation, Atterberg limits) for design. If the soil conditions are similar to those in the proposed Hazmat building fill and peat overlying dense to hard soils), GeoSyntec will use the seismic information for the Hazmat building; if typical soils are encountered, GeoSyntec will follow the Uniform Building Code. GeoSyntec assumes that the borings will be surveyed by the County.
AutoNDA by SimpleDocs

Related to Engineering Analysis and

  • Data Analysis In the meeting, the analysis that has led the College President to conclude that a reduction- in-force in the FSA at that College may be necessary will be shared. The analysis will include but is not limited to the following: ● Relationship of the FSA to the mission, vision, values, and strategic plan of the College and district ● External requirement for the services provided by the FSA such as accreditation or intergovernmental agreements ● Annual instructional load (as applicable) ● Percentage of annual instructional load taught by Residential Faculty (as applicable) ● Fall Full-Time Student Equivalent (FFTE) inclusive of dual enrollment ● Number of Residential Faculty teaching/working in the FSA ● Number of Residential Faculty whose primary FSA is the FSA being analyzed ● Revenue trends over five years for the FSA including but not limited to tuition and fees ● Expenditure trends over five years for the FSA including but not limited to personnel and capital ● Account balances for any fees accounts within the FSA ● Cost/benefit analysis of reducing all non-Residential Faculty plus one Residential Faculty within the FSA ● An explanation of the problem that reducing the number of faculty in the FSA would solve ● The list of potential Residential Faculty that are at risk of layoff as determined by the Vice Chancellor of Human Resources ● Other relevant information, as requested

  • Engineering Forest Service completed survey and design for Specified Roads prior to timber sale advertisement, unless otherwise shown in A8 or Purchaser survey and design are specified in A7. On those roads for which Forest Service completes the design during the contract, the design quantities shall be used as the basis for revising estimated costs stated in the Schedule of Items and adjusting Timber Sale Account. Forest Service engineering shall be completed according to the schedule in A8. Should Forest Service be unable to perform the designated survey and design by the completion date or other agreed to time, upon written agreement, Purchaser shall assume responsibility for such work. In such event, Contracting Officer shall revise:

  • Reverse Engineering The Customer must not reverse assemble or reverse compile or directly or indirectly allow or cause a third party to reverse assemble or reverse compile the whole or any part of the software or any products supplied as a part of the Licensed System.

  • Technology Research Analyst Job# 1810 General Characteristics Maintains a strong understanding of the enterprise’s IT systems and architectures. Assists in the analysis of the requirements for the enterprise and applying emerging technologies to support long-term business objectives. Responsible for researching, collecting, and disseminating information on emerging technologies and key learnings throughout the enterprise. Researches and recommends changes to foundation architecture. Supports research projects to identify and evaluate emerging technologies. Interfaces with users and staff to evaluate possible implementation of the new technology in the enterprise, consistent with the goal of improving existing systems and technologies and in meeting the needs of the business. Analyzes and researches process of deployment and assists in this process.

  • Industrial Operations Analyst (IOA ‌ The IOA is a GSA Government official who audits Contractor records and conducts Contractor Assistance Visits (CAVs) to the Contractor’s place of business to assist the Contractor with task order reporting, Contract Access Fee (CAF) management, and other general contract administration functions deemed necessary by the Government.

  • Statistical Analysis 31 F-tests and t-tests will be used to analyze OV and Quality Acceptance data. The F-test is a 32 comparison of variances to determine if the OV and Quality Acceptance population variances 33 are equal. The t-test is a comparison of means to determine if the OV and Quality Acceptance 34 population means are equal. In addition to these two types of analyses, independent verification 35 and observation verification will also be used to validate the Quality Acceptance test results.

  • Geotechnical Engineer « »« » « » « » « » « »

  • Value Engineering The Supplier may prepare, at its own cost, a value engineering proposal at any time during the performance of the contract. The value engineering proposal shall, at a minimum, include the following;

  • Disturbance Analysis Data Exchange The Parties will cooperate with one another and the NYISO in the analysis of disturbances to either the Large Generating Facility or the New York State Transmission System by gathering and providing access to any information relating to any disturbance, including information from disturbance recording equipment, protective relay targets, breaker operations and sequence of events records, and any disturbance information required by Good Utility Practice.

  • COMPENSATION ANALYSIS After the expiration of the second (2nd) Renewal Term of this Agreement, if any, a Compensation Analysis may be performed. At such time, based on the reported Total Gross Revenue, performance of the Concession, and/or Department’s existing rates for similarly- performing operations, Department may choose to increase the Concession Payment for the following Renewal Term(s), if any.

Time is Money Join Law Insider Premium to draft better contracts faster.