ENGINEER’s Review. 1. ENGINEER will timely review and approve Shop Drawings and Samples in accordance with the schedule of Shop Drawings and Sample submittals acceptable to ENGINEER. ENGINEER’s review and approval will be only to determine if the items covered by the submittals will, after installation or incorporation in the Work, con- form to the information given in the Contract Docu- ments and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. 2. ENGINEER’s review and approval will not extend to means, methods, techniques, sequences, or procedures of construction (except where a particular means, method, technique, sequence, or procedure of construction is specifically and expressly called for by the Contract Documents) or to safety precautions or programs incident thereto. The review and approval of a separate item as such will not indicate approval of the assembly in which the item functions. 3. ENGINEER’s review and approval of Shop Drawings or Samples shall not relieve CON- TRACTOR from responsibility for any variation from the requirements of the Contract Documents unless CONTRACTOR has in writing called ENGINEER’s attention to each such variation at the time of each submittal as required by paragraph
Appears in 6 contracts
Samples: Maintenance Contract, Maintenance Contract for Electrical Work, Hvac and Temperature Control Inspections and Service Contract