Common use of Entire Agreement and Modification Clause in Contracts

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXX, INC. By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx., P.E. Executive Director Sr. Vice President and COO Date signed: Date signed: Approved: Xxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx Xxxxxxxx Dir/Xxxxx Xxxxx DED/Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3, 2023 Xx. Xxxxxxx Xxxxxxxx TFC 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Dear Xx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Inc. (RKCI) is pleased to submit our proposal to provide the construction materials observation and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services for the referenced project. This budget is based on our understanding of the project, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPac

Appears in 1 contract

Samples: www.tfc.texas.gov

AutoNDA by SimpleDocs

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXMEP ENGINEERING, INC. __________________ By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx.Xxx X. Xxxxx, P.E. Executive Director Sr. Vice President and COO Principal Date signedof execution: Date signedPM 01/26/2021 | 4:47 PM DCSaTte of execution: Approved01/26/2021 | 4:42 PM CST DGC Dir DED EXHIBIT A DocuSign Envelope ID: Xxx D6B466FC-C048-4C0F-BBD7-431A08AE1EAA January 6, 2021 Xxxxxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx Xxxxxxxx Dir/Xxxxx Xxxxx DED/Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3Project Manager Texas Facilities Commission Facilities, 2023 Xx. Xxxxxxx Xxxxxxxx TFC Design & Construction 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx 00000 Re: Construction Materials Testing Proposal to Provide Third-Party A/E Design Review Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac for TFC 20-21DM Projects at Park 35 Complex and Promontory Point Dear Xx. XxxxxxxxXxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX ConsultantsMEP Engineering, Inc. (RKCI) is pleased to submit our proposal to provide the construction materials observation and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services for the referenced project. This budget is based on our understanding of the project, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI appreciates the opportunity to submit our this proposal for third-party professional architectural/engineering (A/E) design review services on the construction materials observation above referenced project. It is MEP’s understanding that the terms and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction conditions of this project. If you have any questions concerning our proposal or need any additional informationproject assignment agreement will be defined by the current Indefinite Delivery/Indefinite Quantity Professional Services Agreement between MEP Engineering, please call us at Inc. and TFC (Contract #18-093-000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPac).

Appears in 1 contract

Samples: www.tfc.texas.gov

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXX, INC. [INSERT PSP NAME] By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx., P.E. Print Name: Executive Director Sr. Vice President and COO Print Title: Date signed: Date signed: Approved: Xxx Xxxxxxx Assistant General TFC Legal Counsel PM/Xxxxxxx Xxxxxxxx PM/ Dir/Xxxxx X. Xxxxx DED/X.X. Xxxx DocuSign Envelope ID: C5089EDE-4774-4D53-AA2C-2CD7F690CBC2 DocuSign Envelope ID: C5089EDE-4774-4D53-AA2C-2CD7F690CBC2 Summary of Practice History xxx.xxxxxxxx.xxx TEAM ORGANIZATION, REPORTING RESPONSIBILITIES & AVAILABILITY XXXXX XXXXXXX Project Production XXXXXXXX XXXXX Project Production XXXXXX X. Xxxx TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3XXXX, 2023 XxXX. Xxxxxxx Xxxxxxxx TFC 0000 Xxx Xxxxxxx Xxxxxxxxx XxxxxxASSOCIATE AIA Assistant Project Manager XXXXXXX XXXXXX Assistant Project Manager As yhe firm’s Principal, Xxxxx 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Dear XxDayid Uegreye AIA will lead yhe firm’s inyernal yeam in iys pro¡ecy approach, communicayion expecyayions, and deliyery oG yhe firm’s seryices. Xxxxxxxx: 0000 Xxxxxxx XxxxAll team members will at some point dedicate 100% of their time to achieve the goals and milestones required for project delivery and at other times time frames less than that. In all regards, Xxxxx X-000 Xxxxxxthe projects will be fully staffed and personnel will be available for meeting, review, and coordination of the owner’s interests, needs and requirements. XXXXX XXXXXXX, AIA Project Principal / Architect / Manager XXXXX XXXXXXX Principal / Administration XXXXX X. XXXXX Asst. Project Manger (Specs/Bldg Sys.) XXXXX X. XXXXXX, XX Project Architect (Codes/Accessibility) TEXAS FACILITIES COMMISSION / Professional Architectural Services / IDIQ / RFQ #000-0-00000 P 512.339.1745 / April 15, 2021 XXXXXXX & XXXXX ARCHITECTS, LLP / Architectural Planning, Design & Construction Administration DocuSign Envelope ID: C5089EDE-4774-4D53-AA2C-2CD7F690CBC2 DocuSign Envelope ID: C5089EDE-4774-4D53-AA2C-2CD7F690CBC2 DocuSign Envelope ID: C5089EDE-4774-4D53-AA2C-2CD7F690CBC2 Exhibit F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Inc. (RKCI) is pleased to submit our proposal to provide the construction materials observation Criminal Background Checks and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing Application Guidelines The Criminal Background Checks and observation services for the referenced project. This budget is based on our understanding of the project, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented Application Guidelines are located at this TFC Construction Contracts website link at 5E in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materialsPDF: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved Byxxxxx://xxx.xxx.xxxxx.xxx/divisions/facilities/prog/construct/formsindex/TEXAS%20FACIL ITIES%20COMMISSION%20CRIMINAL%20BACKGROUND%202016.pdf DocuSign Envelope ID: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AHC5089EDE-4774-4D53-AA2C-2CD7F690CBC2 DocuSign Envelope ID: am AttachmentsC5089EDE-4774-4D53-AA2C-2CD7F690CBC2 DocuSign Envelope ID: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23C5089EDE-4774-0514D53-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project NameAA2C-2CD7F690CBC2 DocuSign Envelope ID: Camp Xxxxxxd CH6 concrete testing Project LocationC5089EDE-4774-4D53-AA2C-2CD7F690CBC2 DocuSign Envelope ID: Camp Xxxxxxd Campus on N MoPac Contact NameC5089EDE-4774-4D53-AA2C-2CD7F690CBC2 DocuSign Envelope ID: Xxxxxxx Xxxxxxxx ClientC5089EDE-4774-4D53-AA2C-2CD7F690CBC2 DocuSign Envelope ID: TFC AddressC5089EDE-4774-4D53-AA2C-2CD7F690CBC2 DocuSign Envelope ID: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone NumberC5089EDE-4774-4D53-AA2C-2CD7F690CBC2 DocuSign Envelope ID: 000.000.0000 (O) 000.000.0000 (M) E MailC5089EDE-4774-4D53-AA2C-2CD7F690CBC2 DocuSign Envelope ID: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 GeneralC5089EDE-4774-4D53-AA2C-2CD7F690CBC2 DocuSign Envelope ID: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacC5089EDE-4774-4D53-AA2C-2CD7F690CBC2

Appears in 1 contract

Samples: Architectural Services Agreement

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXXXXXXXXX, XXXXX & XXXXXX, INC. ., DBA XXXXXXXX By: By: Xxxx Xxxxx Xxxxxxx Xxxxx X. Xxxxxxx, Xx., P.E. PE Executive Director Sr. Vice President and COO Principal in Charge Date signed: Date signed: Approved: Xxx Xxxxxxx Assistant X. Xxxxxx General Counsel PM/Xxxxxxx Xxxxxxxx Dir/Xxxxx Xxxxx DED/Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3Contract 22-106-000 January 4, 2023 Xx. Xxxxxxx Xxxxxxxx TFC Senior Project Manager Texas Facilities Commission Facilities Design & Construction 0000 Xxx Xxxxxxx Xxxxxxxxx XxxxxxXxxx. Austin, Xxxxx 00000 TX 78701 Re: Construction Materials Testing Surveying Services at Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac (35th & Mopac) Proposal for Professional Services Dear Xx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Inc. Xxxxxxxx (RKCIA/E) is pleased to submit our proposal have the opportunity to provide Surveying Services to the construction materials observation Texas Facilities Commission (Client) for +/- 13 acres located at 35th Street and testing services on the project referenced aboveMopac Expressway. We propose an estimated budget of $1,428.90 for testing and observation services for the referenced projectSurvey Services include ALTA/Tree/Topo surveys. This budget It is based on our understanding of the project, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times understood that the client or their representative requests our services will affect the suggested budget. these Services will be provided issued as an assignment under Contact 00-000-00. Project Information Surveying Services are to be performed on the following described site: +/- 13 acres parallel to Mopac Expressway (west boundary) between W 35th Street (south boundary), Xxxxxxx Avenue (east boundary) and 41st Street (north boundary). Site is referred to as the Camp Xxxxxxx Campus with existing structures including: Travel and Information Division, TxDot, Transportation Department Maintenance, and Texas Department of Motor Vehicles. Figure 1 – Site Limits Identified in Red Outline A:\2022\40465.22\04_PRCMNT\00_PASS\Proposal\TFC_Camp_Hubbard_Survey_Proposal_Letter_40465.22.docx TFC IDIQ Contract 00-000-000 Xx. Xxxxxxxx December 5, 2022 Texas Facilities Commission Page 2 Basic Services (ALTA/Tree/Topo of Full Site +/- 13 Acres) A/E will prepare a call out basis Land Title Survey in accordance with current minimum standard detail requirements for ALTA/NSPS Land Title Surveys as adopted in 2021 by American Land Title Association and the cost estimate spreadsheet attached to this proposalNational Society of Professional Surveyors. The scope of work includes the observation Land Title Survey will include items 1 through 4, 7(a), 8, 9, and testing 13 of the following construction materialsTable “A” Requirements. The Survey will show the field location of all monuments necessary to determine the boundary: Concrete compressive strength specimen samplingimprovements, testingvisible utilities, and reportingany easement information provided, or listed in a title commitment. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, Boundary corners will be found and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order verified or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacset.

Appears in 1 contract

Samples: www.tfc.texas.gov

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXX, INC. [INSERT PSP NAME] By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx., P.E. Print Name: Executive Director Sr. Vice President and COO Print Title: Date signed: Date signed: Approved: Xxx Xxxxxxx Assistant General TFC Legal Counsel PM/Xxxxxxx Xxxxxxxx PM/ Dir/Xxxxx X. Xxxxx DED/X.X. Xxxx X. DocuSign Envelope ID: 816CED92-6451-4FFE-8FF7-DFFADE923C84 ORGANIZATIONAL CHART 14 Stantec Stantec is excited to introduce our team for the Texas Facilities Commissioning IDIQ for Professional Civil Engineering and Land/Utility Surveying Services. A proposed organizational chart for this assignment, including all key team members, is provided below. Additionally, resumes for team members are included in the following pages. Principal-in-Charge/Client Liaison Xxxx TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3Xxxxxxxx, 2023 Xx. PE Project Manager Xxxxxxxxx Xxxxxxxxx, PE CIVIL ENGINEERING SURVEY AND GEOSPATIAL SERVICES Practice Lead Xxxxxxx Xxxxxxxx TFC 0000 Xxxxxxx Practice Lead, QA/QC Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, PLS QA/QC, Austin/Central Texas Civil Design Team Lead Xxxxx 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Dear Xx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX ConsultantsXxxxxx/Central Texas Survey Team Lead Xxxx Xxxxxxxx, Inc. (RKCI) is pleased to submit our proposal to provide the construction materials observation and testing services on the project referenced aboveRPLS Dallas/Ft. We propose an estimated budget of $1,428.90 Worth/North Texas Survey Team San Antonio South Rio Grande Valley Civil Lead Design Team Lead Xxxx Xxxxxx, RPLS Chance Xxxxx, XX San Antonio/South Rio Grande Valley, Dallas/Ft. Worth/North Texas Civil Design Houston/South Texas Survey Team Lead Team Lead Xxx Xxxx III, RPLS, LSLS Xxxx Xxxxx, XX Xxxxxxx/South Texas Civil Design Team Lead Xxxxx Xxxxxx, PE Potential for testing and observation services for the referenced project. This budget is based on our understanding of the project“On-Call” HUB Subconsultant Partners Civil Xxxxxx & Associates, an estimate of quantitiesMWM Design Group Geotechnical Alliance Geotechnical Group MWM Design Group Mechanical/ Plumbing Encotech ADA/Accessibility Altura Solutions, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacLLC Landscape Survey MWM Design Group Environmental Xxxx Environmental Structural

Appears in 1 contract

Samples: Professional Engineering Services Agreement

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXX, INC. [INSERT PSP NAME] By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx., P.E. Print Name: Executive Director Sr. Vice President and COO Print Title: Date signed: Date signed: Approved: Xxx Xxxxxxx Assistant General TFC Legal Counsel PM/Xxxxxxx Xxxxxxxx PM/ Dir/Xxxxx X. Xxxxx DED/X.X. Xxxx DocuSign Envelope ID: E9A9750A-188F-45B0-AD83-AEBF87856C82 DocuSign Envelope ID: E9A9750A-188F-45B0-AD83-AEBF87856C82 From: Xxxxx. X. Xxxxxx To: Xxxx TFC IDIQ C [Delivered by E mail toXxxxxxxxxxx Subject: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3, 2023 Xx. Xxxxxxx Xxxxxxxx TFC 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Dear Xx. XxxxxxxxContact info Xxxxxx Design RFQ 303-0-00762 IDIQ Architecture Date: 0000 Xxxxxxx Monday, August 2, 2021 10:06:39 AM External: Beware of links/attachments Xxxx, Xxxxx X-000 Xxxxxx, XXXX, XX, RID: President, Principal-in-Charge Xxxxxx Xxxxxx, AIA, RA: Project Manager, Director of Design Xxxx Xxxxxx, AIA, RA: Senior Project Manager Let me know if you need additional information Xxxxx X. Xxxxxx, XXXX President XXXXXX • DESIGN ASSOCIATES 000 Xxxx Xxxxxxxx Xxxxxx Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX ConsultantsPhone: 000-000-0000 Fax: 000-000-0000 e-mail: xxxxx@xxxxxxxxxxxx.xxx On 8/2/2021 9:53 AM, Inc. (RKCI) is pleased to submit our proposal to provide the construction materials observation and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services for the referenced project. This budget is based on our understanding of the projectXxxx Xxxxxxxxxxx wrote: Dear Xxxxx, an estimate of quantitiesRegarding RFQ 303-0-00762 IDIQ Professional Architectural Services, and past experience with similar projects. A cost estimate breakdown is presented we are in the attached spreadsheet. Construction sequencing, delays, and the number process of times that the client or their representative requests obtaining complete company information for Xxxxxx Design Associates to present to our services will affect the suggested budget. Services will be provided on a call out basis Commission for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced projectaward. Please sign this proposalforward a pdf list of key personnel, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to or a company org chart so we can complete our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal numbercontract template. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional informationyou, please call us at Xxxx Xxxxxxxxxxx, CTPM, CTCM Purchaser Texas Facilities Commission Phone: (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, 000-0000 Fax: (Signature000) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23000-0510000 E-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reportingxxxx.xxxxxxxxxxx@xxx.xxxxx.xxx ***The Facilities Commission values customer service*** Please Tell Us What You Think. To provide feedback, Engineer Review, please go to the following Website: xxxx://xxxxxx.xxx.xxxxx.xx.xx/survey/ We appreciate and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 Generalvalue your input. DocuSign Envelope ID: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacE9A9750A-188F-45B0-AD83-AEBF87856C82 DocuSign Envelope ID: E9A9750A-188F-45B0-AD83-AEBF87856C82 DocuSign Envelope ID: E9A9750A-188F-45B0-AD83-AEBF87856C82 DocuSign Envelope ID: E9A9750A-188F-45B0-AD83-AEBF87856C82 DocuSign Envelope ID: E9A9750A-188F-45B0-AD83-AEBF87856C82 DocuSign Envelope ID: E9A9750A-188F-45B0-AD83-AEBF87856C82 DocuSign Envelope ID: E9A9750A-188F-45B0-AD83-AEBF87856C82 DocuSign Envelope ID: E9A9750A-188F-45B0-AD83-AEBF87856C82 DocuSign Envelope ID: E9A9750A-188F-45B0-AD83-AEBF87856C82 DocuSign Envelope ID: E9A9750A-188F-45B0-AD83-AEBF87856C82 DocuSign Envelope ID: E9A9750A-188F-45B0-AD83-AEBF87856C82 DocuSign Envelope ID: E9A9750A-188F-45B0-AD83-AEBF87856C82 DocuSign Envelope ID: E9A9750A-188F-45B0-AD83-AEBF87856C82 DocuSign Envelope ID: E9A9750A-188F-45B0-AD83-AEBF87856C82

Appears in 1 contract

Samples: Architectural Services Agreement

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXX, INC. [INSERT PSP NAME] By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx., P.E. Print Name: Executive Director Sr. Vice President and COO Print Title: Date signed: Date signed: Approved: Xxx Xxxxxxx Assistant General TFC Legal Counsel PM/Xxxxxxx Xxxxxxxx PM/ Dir/Xxxxx X. Xxxxx DED/X.X. Xxxx DocuSign Envelope ID: 2B07CD0C-DE7C-4B5F-AD1C-D96E2E430AD7 DocuSign Envelope ID: 2B07CD0C-DE7C-4B5F-AD1C-D96E2E430AD7 Xxxx Xxxxxxx, Inc. Summary of Practice History Organizational Chart TFC Contract No. 00-000-000 IDIQ for Environmental Engineering TEXAS FACILITIES COMMISSION PROJECT MANAGER XXXXXXX X. XXXX, PG PRINCIPAL IN CHARGE XXX XXXX PHASE I ESAS Xxxxx Xxxxx Xxxx TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3Xxx, 2023 Xx. PG Xxxxx Xxxxxxxxxx, PE AMBIENT AIR/IAQ AEHS* LEAD BASED PAINT Xxxxx Xxxxx AEHS* Xxxxxxxx TOXIC HAZMAT MGMT Xxxx Xxx, PG AEHS* Xxxxxx Xxxxxx PHASE II & III ESAS Xxxxxx Xxxxxxx Xxxx Xxx, PG SPECS/MGMT PLANS Xxxxx Xxxxx Xxxxxxxx TFC 0000 Xxx Xxxx Sak, PG ASBESTOS Xxxxx Xxxxx AEHS* Xxxxxxxx DEMOLITION MONITORING Xxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Dear Xx. Xxxxxxxx: 0000 Xxxxxxx X. Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Inc. (RKCI) is pleased to submit our proposal to provide the construction materials observation and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services for the referenced project. This budget is based on our understanding of the project, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • Xxxxxxxx ANALYTICAL LAB TESTING San Antonio Testing* SURVEYING Xxxxxxx & Associates* ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacDRILLING Vortex*

Appears in 1 contract

Samples: Engineering Services Agreement

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXMCKINNEY ARCHITECTS, INC. ., DBA XXXXXXXX YORK ARCHITECTS By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx., P.E. Xxxxxxxx Xxxxxxxxxx Executive Director Sr. Vice President and COO Date signed: 04/28/2022 | 12:09 PM CDT Date signed: 04/28/2022 | 11:54 AM CDT Approved: Xxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx Xxxxxxxx Xxxxx Xxxxx Dir/Xxxxx Xxxxx DED/Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3April 7, 2023 Xx. Xxxxxxx Xxxxxxxx TFC 2022 Xxxxx Xxxxx Director of Project Management Texas Facilities Commission Facilities Design & Construction 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Dear XxXxxx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Inc. Direct:(000)000-0000 Mobile: (RKCI000)000-0000 Xxxxx.xxxxxx@xxx.xxxxx.xx.xx RE: Proposal for Professional Services INDEFINITE DELIVERY INDEFINITE QUANTITY PROFESSIONAL SERVICES AGREEMENT CONTRACT NO. 00-000-000 ASSIGNMENT NO. 01 Dear Xx. Xxxxx: XxXxxxxx York Architects (MYA) is pleased to submit our provide this proposal for Professional AE Services for the Texas Facilities Commission (TFC) Assessment of Xxxxx Xxxxxxx State Building (XXX) and Waco State Building (WAC) (the PROJECT). The Xxxxx Xxxxxxx State Building (XXX) is located at 0000 Xxxx Xxxxxx, Xxxxxxx and is a four story office building approximately 239,271 sq ft. The Waco State Building (WAC) is located at 000 Xxxxxx Xxxxxx, Xxxx and is an eleven story office building approximately 97,314 sq ft. The AE team shall comply with the 2018 TFC Architectural/Engineering Guidelines and other requirements applicable to the campus and/or location of the PROJECT. The PROJECT consists of architectural consulting services for assessment of existing building systems and replacement building systems. We will review reported deficiencies of existing buildings systems and provide the summary recommendations and opinions of probable construction materials observation costs (OPCCs) for repair/correction of deficiencies of existing buildings systems and testing services replacement building systems. Finally, we will provide recommendations and opinions of recommended project budgets for new facilities on the project referenced abovecurrent sites. We propose an estimated budget will coordinate with Project 00- 000-0000 for support information. Owner will provide AutoCAD drawings of $1,428.90 for testing the existing buildings that reasonably represent the built conditions of architectural, structural, mechanical, electrical, and observation services plumbing systems. In addition, the Owner will provide AutoCAD drawings or pdf copies for the referenced projectsubject building including original construction, subsequent modifications in the areas where the work will take place, and proposed modifications to the building to the AE team. This budget is based on our understanding Owner will provide all available deficiency reports of the projectexisting buildings including requests for DM list additions submitted by building managers or other TFC personnel. Sub-Consultants that may be Utilized for Project: TG&W Engineers Inc – Mechanical, an estimate of quantitiesElectrical, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencingPlumbing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at FA/FS Engineers (000HUB) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms Pre-Design Services MYA and Conditions (Date) its sub-consultants shall provide the following Pre-Design Phase services indicated below in accordance with the 2018 TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx CityArchitectural/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, Engineering Guidelines to the extent relevant and Report Distribution 10% appropriate to the scope of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacthe work.

Appears in 1 contract

Samples: Professional Services Agreement

Entire Agreement and Modification. The This Agreement and this Assignment and their its integrated attachment(s) constitute the entire agreement of the Parties parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment Agreement specifically displays a mutual intent to amend a particular part of this AssignmentAgreement, general conflicts in language between any such attachment and this Assignment Agreement shall be construed consistently with the terms of this AssignmentAgreement. Unless otherwise expressly authorized by the terms of this AssignmentAgreement, no modification, renewal, extension, or amendment to this Assignment Agreement shall be binding upon the Parties parties unless the same is in writing and signed by the respective Parties parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXXXXXXXX CONSULTANTS, INC. By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx., P.E. Xxxxx X. Xxxxxx Executive Director Sr. Vice President and COO Date signed: 11/16/2021 | 1:13 PM CST Date signed: 11/16/2021 | 9:30 AM PST Approved: Xxx Xxxxxxx Assistant General Legal Counsel PM/Xxxxxxx X. Xxxxxxxx Dir/Xxxxx X. Xxxxx DED/Xxxx X. Xxxx Exhibit A 2015 Uniform General Conditions The 2015 Uniform General Conditions (hereinafter referred to as “UGC”) are located at this TFC IDIQ Construction Contracts website link, at 5C in PDF: xxxx://xxx.xxx.xxxxx.xx.xx/divisions/facilities/prog/construct/formsindex/2015%20UGC%20 03.07.2017.Final.pdf Exhibit B 2018 Supplementary General Conditions The 2018 Supplementary General Conditions to the 2015 Uniform General Conditions are located at this TFC website link in PDF: xxxx://xxx.xxx.xxxxx.xx.xx/divisions/facilities/prog/construct/formsindex/2018%20Supplementary %20Modifications%20to%20Article%205%000-00-0000%20(003).pdf Exhibit C [Delivered by TFC 2018 Architectural/Engineering Guidelines, Edit Date March 19, 2018 The A/E mail toGuidelines are located at this TFC A/E Forms link in PDF: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 xxxx://xxx.xxx.xxxxx.xx.xx/divisions/facilities/prog/construct/formsindex/01%20-%202018%20A- E%20GUIDELINES.pdf Exhibit D Professional Services Schedule DocuSign Envelope ID: B8382F7E-8F57-4152-95A9-FE863709AD95 Xxxxxxx Consultants TFC Project Schedule for Commissing DBGL Cal Days Item or Package Project Milestones Design & Commissioning Phase Services - Follows TGCE Proposed Design through Construction Schedule 11-18-2020 0 BP-1 TGCE 100% Bid Package 1 Release - Controls & VAVs Design 0 BP-3 TGCE 100% Bid Package 3 Release - Generator Design 1 XX-0, XX-0, XX-0 XXXX begins Construction Sequence - Solicits Subs, etc. 1 XX-0, XX-0, XX-0 Xxxxxxx Consultants Notice to Proceed - NTP - XX-0, -0, -0 00 March 3XX-0, 2023 XxXX-0, BP-3 Xxxxxxx Consultants coordinates / provides Cx Specifications & begins attending meetings 320 XX-0, XX-0, XX-0 Xxxxxxx Consultants provides Commissioning throughout Construction Schedule 332 XX-0, XX-0, XX-0 Xxxxxxx Consultants coordinates / provides Cx - Eleven (11) month Warranty Check 1 BP-4 Xxxxxxx Consultants Notice to Proceed - NTP - XX-0 00 XX-0 Xxxxxxx Consultants coordinates / provides Cx Specifications & begins attending meetings 0 BP-4 TGCE 100% Bid Package 4 Release - Central Plant Design 1 BP-4 XXXX begins Construction Sequence - Solicits Subs, etc. 364 BP-4 Xxxxxxx Xxxxxxxx TFC 0000 Xxx Consultants provides Commissioning throughout Construction Schedule 335 BP-4 Xxxxxxx Xxxxxxxxx XxxxxxConsultants coordinates / provides Cx - Eleven (11) month Warranty Check 1 BP-5 Xxxxxxx Consultants Notice to Proceed - NTP - XX-0 00 XX-0 Xxxxxxx Consultants coordinates / provides Cx Specifications & begins attending meetings 0 BP-5 TGCE 100% Bid Package 4 Release - Central Plant Design 1 BP-5 XXXX begins Construction Sequence - Solicits Subs, Xxxxx 00000 Reetc. 364 BP-5 Xxxxxxx Consultants provides Commissioning throughout Construction Schedule 335 BP-5 Xxxxxxx Consultants coordinates / provides Cx - Eleven (11) month Warranty Check 1157 DocuSign Envelope ID: Construction Materials Testing Services Camp B8382F7E-8F57-4152-95A9-FE863709AD95 Exhibit E List of Project Manager and Subcontractors DocuSign Envelope ID: E30D3DAE-1569-4BBA-9470-BFC18B24B097 DocuSign Envelope ID: B8382F7E-8F57-4152-95A9-FE863709AD95 Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Dear Xx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Inc. (RKCI) is pleased to submit our proposal to provide the construction materials observation and testing services on the project referenced aboveTFC Contract No. We propose an estimated budget of $1,428.90 for testing and observation services for the referenced project. This budget is based on our understanding of the project, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (00-000) -000 0000. CONSULTANTS • ENVIRONMENTAL • PSP’S LIST OF PSP PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacMANGER AND SUBCONTRACTORS

Appears in 1 contract

Samples: Professional Engineering Services Agreement

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXTAB TECHNOLOGIES, INC. LLC By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx., P.E. Xxxxx See Executive Director Sr. Vice President and COO Date signed: 05/08/2023 | 12:52 PM CDT Date signed: 05/08/2023 | 10:49 AM PDT Approved: Xxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx Xxxxxxxx Xxxxxx Xxx Dir/Xxxxx Xxxxx DED/Xxxx X. Xxxx TFC DocuSign Envelope ID: 359E9246-167B-42D4-8ACD-80F42BD449C9 DocuSign Envelope ID: E2DE4B55-7BD0-4C19-8616-40E4CFFFB497 TAB TECHNOLOGIES, LLC. IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 CONTRACT NO. 00-000-000 ASSIGNMENT NO. 5 EXHIBIT A PSP PROPOSAL 2 PAGES March 331, 2023 Xx. Xxxxxxx Xxxxxxxx TFC Texas Facilities Commission 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Dear XxXxxx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Inc. (RKCI) is pleased to submit our proposal to provide the construction materials observation and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services for the referenced project. This budget is based on our understanding of the project, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone NumberATTN: 000.000.0000 Xxxxxx Xxx RE: TFC Texas School for the Deaf DM 20-21 GMP-1, 2, & 4 Xxxxxx, We are pleased to quote the testing, adjusting and balancing (OTAB) 000.000.0000 of the HVAC systems on the referenced project for the total net sum of: $93,786.00 (MNinety-Three Thousand Seven Hundred Eighty-Six Dollars 0/00 US less tax) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacCLARIFICATIONS:

Appears in 1 contract

Samples: www.tfc.texas.gov

Entire Agreement and Modification. The This Agreement and this Assignment and their its integrated attachment(s) constitute the entire agreement of the Parties parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment Agreement specifically displays a mutual intent to amend a particular part of this AssignmentAgreement, general conflicts in language between any such attachment and this Assignment Agreement shall be construed consistently with the terms of this AssignmentAgreement. Unless otherwise expressly authorized by the terms of this AssignmentAgreement, no modification, renewal, extension, or amendment to this Assignment Agreement shall be binding upon the Parties parties unless the same is in writing and signed by the respective Parties parties hereto. This Assignment shall be effective as of the date of the last Party to sign. [INTENTIONALLY LEFT BLANK – SIGNATURE PAGE FOLLOWS] FOR OWNER: FOR PE: TEXAS FACILITIES COMMISSION XXXX XXXXXXXXXXXXX XXXXXXXXXX ENGINEERS, INC. LLC By: By: Xxxx Xxxxx Xxxxxxx XxxxxxxXxxxx Xxxxx, Xx., P.E. PE Executive Director Sr. Vice President and COO Principal, Building MEP Date signed: 01/29/2023 | 8:03 PM CST Date signed: 01/29/2023 | 7:12 PM CST Approved: Xxx Xxxxxxx Assistant X. Xxxxxx General Counsel PM/Xxxxxxx Xxxxxxxx Xxxxx Xxxxx Dir/Xxxxx Xxxxx Xxxxxxxxx DED/Xxxx X. Xxxx TFC IDIQ Exhibit A 2015 Uniform General Conditions 2015 UGC 03.07.2017.Final.pdf (xxxxx.xxx) Exhibit B 2018 Supplementary General Conditions 2018 Supplementary Modifications to Article 5 3-23-2018 (003).pdf (xxxxx.xxx) Exhibit C [Delivered by 2018 Architectural/Engineering Guidelines 01 - 2018 A-E mail toGUIDELINES.pdf (xxxxx.xxx) Exhibit D PE’s Schedule of Rates and Fees 2022 Hourly Rate Schedule Division Rate Design Principal $275 Electrical Engineer $215 Technology Design Consultant $210 Mechanical Engineer $210 Mechanical Designer $165 Electrical Designer $175 Plumbing Designer $160 Construction Inspector $160 Modeling Technician $135 Commissioning Principal $275 Project Manager $195 Mechanical Engineer $210 Electrical Engineer $215 Field Technician $160 SCADA SCADA Engineer $250 Administration Clerical $115 Accounting $165 Expenses Cost plus 10% unless otherwise noted *Rates applicable through December 31, 2024 2022 Hourly Rate Schedule Division Rate Design Principal $275 Electrical Engineer $215 Technology Design Consultant $210 Mechanical Engineer $210 Mechanical Designer $165 Electrical Designer $175 Plumbing Designer $160 Construction Inspector $160 Modeling Technician $135 Commissioning Principal $275 Project Manager $195 Mechanical Engineer $210 Electrical Engineer $215 Field Technician $160 Administration Clerical $115 Accounting $165 Expenses Cost plus 10% unless otherwise noted *Rates applicable through December 31, 2024 STANDARD RATE SCHEDULE THE FOLLOWING RATES ARE FOR WORK PERFORMED ON AN HOURLY CHARGE BASIS. RATES INCLUDE COMPANY OVERHEAD AND PROFIT FOR SERVICES ACCOMPLISHED DURING REGULAR WORKING HOURS. DIRECT LABOR OFFICE PERSONNEL SERVICES Managing Principal ………………………………………………………………………………………………………………. $ 329.00 per hour Senior Vice President …………………………………………………………………………………………………………… $ 319.00 per hour Vice President ……………………………………………………………………………………………………………………… $ 238.00 per hour Senior Project Manager ……………………………………………………………………….................................. $ 204.00 per hour Project Manager ………………………………………………………………………………….................................. $ 180.00 per hour Senior Consultant ……………………………………………………………………………………………………………….. $ 180.00 per hour Consultant …………………………………………………………………………………………………………………………… $ 160.00 per hour Associate Consultant …………………………………………………………………………………………………………… $ 130.00 per hour Senior Technical Designer …………………………………………………………………………………………………… $ 110.00 per hour Accounting / HR Manager …………………………………………………………………………………………………… $ 162.00 per hour Construction Inspector ……………………………………………………………………………………………………….. $ 120.00 per hour Engineer Associate ……………………………………………………………………………………………………………… $ 110.00 per hour Technical Designer ……………………………………………………………………………………………………………… $ 120.00 per hour Administration ……………………………………………………………………………………………………………………. $ 85.00 per hour DIRECT EXPENSES Transportation: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3By Firm’s Passenger Vehicles ……………………………………………………………………………………. $ Per IRS Rates GarzaEMC Austin | Houston | San Antonio xxx.xxxxxxxx.xxx | TBPE No. F-14629 2022 Hourly Billing Rates Senior Principal $345.00 Principal II $270.00 Principal I $235.00 Senior Project Manager $195.00 Project Manager $165.00 Project Engineer $140.00 Graduate Engineer $125.00 Senior Production Manager $200.00 Senior Technician $165.00 Technician II $145.00 Technician $100.00 Support Personnel $100.00 Senior Support Personnel $170.00 xxx.xxxxxxxxx.xxx | Datum Xxxx, 2023 Xx. Xxxxxxx Xxxxxxxx TFC 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, LLC | F-16674 000 Xxxxx 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Dear Xx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx000 Xxx Xxxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Inc. (RKCI) is pleased to submit our proposal to provide the construction materials observation and testing services on the project referenced above. We propose an estimated budget 210.623.0409 Exhibit E List of $1,428.90 for testing and observation services for the referenced project. This budget is based on our understanding of the project, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET PE Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions Subcontractors Exhibit E LIST OF PE PROJECT MANAGER AND SUBCONTRACTORS (Date) TFC IDIQ C PAD23-051-00 3 March 3Name, 2023 COST ESTIMATE BREAKDOWN Address & Contact Person (Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacManager))

Appears in 1 contract

Samples: Professional and Technical Services Agreement

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXTERRACON CONSULTANTS, INC. By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx.Xxxxx Xxxxxxxxxxx, P.E. Executive Director Sr. Vice President and COO Date signed: 01/27/2022 | 1:08 PM CST Date signed: 01/27/2022 | 12:59 PM CST Approved: Xxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx Xxxxxxxx Xxxx Xxxxxx Dir/Xxxxx Xxxxx DED/Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail toDocuSign Envelope ID: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3EA74EA45-764E-4021-9037-5F156B21C6FE December 23, 2023 2021 Texas Facilities Commission Attn: Xx. Xxxxxxx Xxxxxxxx TFC Xxxx Xxxxxx 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxx. Xxxxxx, Xxxxx 00000 ReSubject: Cost Estimate for Construction Materials Testing Services Camp TFC Xxxxx Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Building Repairs 0000 Xxxx Xxxxxx, Xxxxxxx, Xxxxx 00000 Terracon Document No. P92211616, Revision 1 Dear Xx. XxxxxxxxXxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Terracon Consultants, Inc. (RKCITerracon) is pleased to submit our proposal understands that we have been selected based on qualifications to provide the construction materials observation and testing services for the above referenced project. This document outlines our understanding of the scope of services to be performed by Terracon and provides an estimate of the cost of our services. Terracon is providing this revised proposal as requested to incorporate changes to our scope of services so that they are more applicable to the project requirements. Terracon provided geotechnical services for this project. Our presence on this project and commitment to responsive quality services will make Terracon a valuable asset to the project. PROJECT INFORMATION The site is located at the existing Xxxxx Xxxxxxx Building at 0000 Xxxx Xxxxxx in Houston, Texas. The project involves renovations to the existing building, which will include repairs to a pedestrian bridge and the addition of a new ramp slab, ramp walls, and fire water break tank. The foundation slabs will be supported by 42 inches of select fill. Structural steel repairs will also be included with the project. If blended or mixed soils are intended for use to construct the pad and slab areas, Terracon should be contacted to provide additional recommendations. Blended or mixed soils do not occur naturally. These soils are a blend of sand and clay and will require mechanical mixing with a xxxxxx-mixer at the site. If these soils are not mixed thoroughly to break down the clay clods and blend-in the sand to produce a uniform soil matrix, the fill material may be detrimental to the slab performance. If blended soils are used, we recommend that additional samples of the blended soils, as well as the clay clods, be obtained prior to and during earthwork operations to evaluate if the blended soils can be used in lieu of select fill. The actual type and amount of mechanical mixing at the site will depend on the amount of clay and sand, and properties of the clay. DocuSign Envelope ID: EA74EA45-764E-4021-9037-5F156B21C6FE Cost Estimate for Construction Materials Testing Services TFC Xxxxx Xxxxxxx Building Repairs ■ Houston, Texas December 23, 2021 ■ Terracon Document No. P92211616, Rev.1 Terracon was provided with the following construction documents for preparation of this document: ◼ 90% Construction Documents prepared by Xxxxxxx Architecture, dated November 19, 2021 ◼ Terracon Geotechnical Engineering Report 92215279, dated September 10, 2021 If selected for this project, Terracon requests that we be placed on the distribution of all plan revisions. Site Access and Safety - Client shall secure all necessary site related approvals, permits, licenses, and consents necessary to commence and complete the services and will execute any necessary site access agreement. Terracon will be responsible for supervision and site safety measures for its own employees, but shall not be responsible for the supervision or health and safety precautions for any third parties, including Client’s contractors, subcontractors, or other parties present at the site. Testing and Observation - Client understands that testing and observation are discrete sampling procedures, and that such procedures indicate conditions only at the depths, locations, and times the procedures were performed. Terracon will provide test results and opinions based on tests and field observations only for the work tested. Client understands that testing and observation are not continuous or exhaustive, and are conducted to reduce – not eliminate - project referenced aboverisk. We propose an estimated budget Client agrees to the level or amount of $1,428.90 testing performed and the associated risk. Client is responsible (even if delegated to contractor) for notifying and scheduling Terracon so Terracon can perform these services. Terracon shall not be responsible for the quality and completeness of Client’s contractor’s work or their adherence to the project documents, and Terracon’s performance of testing and observation services shall not relieve contractor in any way from its responsibility for defects discovered in its work or create a warranty or guarantee. Terracon will not supervise or direct the referenced projectwork performed by contractor or its subcontractors and is not responsible for their means and methods. This budget is based on our understanding of the project, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materialsDocuSign Envelope ID: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: EA74EA45-764E-4021-9037-5F156B21C6FE Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK for Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacTFC Xxxxx Xxxxxxx Building Repairs ■ Houston, Texas December 23, 2021 ■ Terracon Document No. P92211616, Rev.1

Appears in 1 contract

Samples: www.tfc.texas.gov

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXKCI TECHNOLOGIES, INC. By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx.Xxxx Xxxxx, P.E. Executive Director Sr. Vice President and COO Date signed: 08/11/2023 | 10:44 AM CDT Date signed: 08/11/2023 | 11:25 AM EDT Approved: Xxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx Xxxxxxxx Dir/Xxxxx Xxxxx DED/Xxxxx Xxxxx for Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3May 31, 2023 Xx. Xxxxxxx Xxxxxxxx TFC Texas Facilities Commission Facilities Design & Construction 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx 00000 Attn: Xxxxxxx Xxxxxxxx Senior Project Manager Re.: Construction Materials Testing Cost Proposal for Professional Land Surveying Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac site survey Dear XxXxx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Inc. (RKCI) is pleased to submit our proposal to provide the construction materials observation and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services for the referenced project. This budget is based on our understanding of the project, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPac,

Appears in 1 contract

Samples: www.tfc.texas.gov

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXX, INC. [INSERT PSP NAME] By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx., P.E. Print Name: Executive Director Sr. Vice President and COO Print Title: Date signed: Date signed: Approved: Xxx Xxxxxxx Assistant General TFC Legal Counsel PM/Xxxxxxx Xxxxxxxx PM/ Dir/Xxxxx X. Xxxxx DED/X.X. Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail toDocuSign Envelope ID: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3B7933028-1A8C-4EE8-8F11-278F9DB6525E DocuSign Envelope ID: B7933028-1A8C-4EE8-8F11-278F9DB6525E Resumes and Organizational Chart TEXAS FACILITIES COMMISSION XXXXXX X XXXXX Xxxxxx Xxxxx, 2023 Xx. Xxxxxxx PE Austin, Texas Xxxxxxxx TFC 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxx Engineers (HUB) Xxxxxx Xxxxxx, PE, LEED AP Dallas, Texas Xxxxxx X Xxxxx 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx, PE, ENV SP Houston, Texas Xxxxxx X Xxxxx Xxxxx Xxxxxxxx, PE Austin, Texas Xxxxxx X Xxxxx Xxxxxxxx Xxxxx, PE El Paso, Texas Xxxxxx X Xxxxx Xxxxx Xxxxxxxx, PE Austin, Texas Xxxxxx X Xxxxx CIVIL ENGINEERING Xxx Xxxxx, PE, LEED AP, ENV SP Xxxxxx X Xxxxx Xxxxxxx Campus on N MoPac Dear Xx. Xxxxxxxx: 0000 Xxxxxxx XxxxXxxxxxx, PE, LEED AP Xxxxxx X Xxxxx X-000 OPERATIONS/QUALITY MANAGER PRINCIPAL IN CHARGE Xxxx Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX ConsultantsPE, Inc. (RKCI) is pleased to submit our proposal to provide the construction materials observation and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services for the referenced project. This budget is based on our understanding of the projectENV SP Xxxxxx X Xxxxx POINT OF CONTACT STRUCTURAL ENGINEERING Xxxx Xxxxxxxx, an estimate of quantitiesPE, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip PEng Austin, TX 78701 Phone NumberTexas Xxxxxx X Xxxxx Xxxxx Xxxxxxxx, PE, SE Austin, Texas Xxxxxxxx Xxxxx Engineers (HUB) Lane Lease, PE, CFM RODS SUE (HUB) SUBSURFACE UTILITY ENGINEERING Xxxxx Xxxxxxx Xxxxxxxx, RPLS RODS Surveying (HUB) SURVEYING Xxxxxx X Xxxxx | Texas Facilities Commission RFQ #000-0-00000 14 DocuSign Envelope ID: 000.000.0000 (O) 000.000.0000 (M) E MailB7933028-1A8C-4EE8-8F11-278F9DB6525E DocuSign Envelope ID: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, B7933028-1A8C-4EE8-8F11-278F9DB6525E DocuSign Envelope ID: B7933028-1A8C-4EE8-8F11-278F9DB6525E Exhibit F Criminal Background Checks and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 Application Guidelines The Criminal Background Checks and Application Guidelines are located at this TFC IDIQ C PAD23 050 00 March 3, 2023 GeneralConstruction Contracts website link at 5E in PDF: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacxxxxx://xxx.xxx.xxxxx.xxx/divisions/facilities/prog/construct/formsindex/TEXAS%20FACIL ITIES%20COMMISSION%20CRIMINAL%20BACKGROUND%202016.pdf DocuSign Envelope ID: B7933028-1A8C-4EE8-8F11-278F9DB6525E DocuSign Envelope ID: B7933028-1A8C-4EE8-8F11-278F9DB6525E DocuSign Envelope ID: B7933028-1A8C-4EE8-8F11-278F9DB6525E DocuSign Envelope ID: B7933028-1A8C-4EE8-8F11-278F9DB6525E DocuSign Envelope ID: B7933028-1A8C-4EE8-8F11-278F9DB6525E DocuSign Envelope ID: B7933028-1A8C-4EE8-8F11-278F9DB6525E DocuSign Envelope ID: B7933028-1A8C-4EE8-8F11-278F9DB6525E DocuSign Envelope ID: B7933028-1A8C-4EE8-8F11-278F9DB6525E DocuSign Envelope ID: B7933028-1A8C-4EE8-8F11-278F9DB6525E DocuSign Envelope ID: B7933028-1A8C-4EE8-8F11-278F9DB6525E DocuSign Envelope ID: B7933028-1A8C-4EE8-8F11-278F9DB6525E

Appears in 1 contract

Samples: Professional Engineering Services Agreement

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXTERRACON CONSULTANTS, INC. By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx.Xxxxx Xxxxxxxxxxx, P.E. Executive Director Sr. Vice President and COO Date signed: 10/20/2022 | 4:02 PM CDT Date signed: 10/20/2022 | 3:54 PM CDT Approved: Xxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx Xxxxxxxx Xxxx Xxxxx Dir/Xxxxx Xxxxx DED/Xxxx X. Xxxx DocuSign Envelope ID: 9FE69033-7A72-4016-BCF2-AB969DE43FD3 TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3, 2023 Xx. Xxxxxxx Xxxxxxxx TFC 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx 00000 Re: Construction Materials Testing Contract 00-000-000 Exhibit A EXHIBIT A - PROJECT UNDERSTANDING Our Scope of Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Dear Xx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Inc. (RKCI) is pleased to submit our proposal to provide the construction materials observation and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services for the referenced project. This budget is based on our understanding of the project as described by Xx. Xxxx Xxxxx of TFC and the expected subsurface conditions as described below. We have not visited the project site to confirm the information provided. Aspects of the project, an estimate undefined or assumed, are highlighted as shown below. We request the design team verify all information prior to our initiation of quantitiesfield exploration activities. Site Location and Anticipated Conditions Item Description Parcel Information The project is located at 0000 Xxx Xxxxx Xxxx in Lubbock, Texas. Existing Improvements The project site is a vacant area. Current Ground Cover Mostly exposed soils and vegetation. Existing Topography Relatively flat. Site Access We expect the site, and past all exploration locations, are accessible with our truck-mounted drilling equipment. Expected Subsurface Conditions Our experience near the vicinity of the site indicates subsurface conditions consist of lean clay and clayey sand within 30 feet below existing grades. Planned Construction Item Description Information Provided Email request for proposal from Xx. Xxxx Xxxxx on March 9, 2022. Project Description The proposed project will consist of a new canopy with similar projectsan approximate area of 3,200 square feet. A cost estimate breakdown is presented in It will also include associated parking and driveways. Finished Floor Elevation Within 2 feet of existing grade. Maximum Loads Not available, anticipated to be lightly loaded. Without further information, our analysis will assume maximum 50-xxx column loads compression and uplift forces. Below-Grade Structures None anticipated. Pavements Sections of the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services proposed pavements will be rigid or flexible pavements. Heavy duty traffic is anticipated at the site. However, traffic count has not been provided on a call out basis for the cost estimate spreadsheet attached to as writing this proposal. The scope EXHIBIT B - SCOPE OF SERVICES Our proposed Scope of work includes the observation and testing Services consists of the following construction materials: Concrete compressive strength specimen samplingfield exploration, laboratory testing, and reportingengineering/project delivery. This proposal may serve as RKCI’s work agreement for These services are described in the referenced projectfollowing sections. Please sign this proposal, initial every page Field Exploration The following exploration boring schedule has been created based on the information included with the site plan: Number of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at Borings Planned Boring Depth (000feet) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project 1 Planned Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPac

Appears in 1 contract

Samples: www.tfc.texas.gov

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXTERRACON CONSULTANTS, INC. By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx.Xxxxx Xxxxxxxxxxx, P.E. Executive Director Sr. Vice President and COO Date signed: 06/20/2022 | 1:25 PM CDT Date signed: 06/20/2022 | 1:21 PM CDT Approved: Xxx Xxxxxxx Assistant X. Xxxxxx General Counsel PM/Xxxxxxx Xxxxxxxx Dir/Xxxxx Xxxx Xxxxx DED/Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail toDocuSign Envelope ID: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 5A02FF8A-D9BB-4CF2-8F22-D6D44CD520E4 Assignment No. 4 - EXHIBIT A March 317, 2023 Xx. Xxxxxxx Xxxxxxxx TFC 2022 Texas Facilities Commission Facilities Design and Construction Division 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx 00000 Attn: Xx. Xxxx Xxxxx P: (000) 000-0000 E: Xxxx.Xxxxx@xxx.xxxxx.xx.xx Re: Construction Materials Testing Proposal for Geotechnical Engineering Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac DPS Northwest Area Office Pavements 00000 Xxxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx Terracon Proposal No. X00000000 Dear Xx. XxxxxxxxXxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX We appreciate your selection of Terracon Consultants, Inc. (RKCITerracon) is pleased to submit our proposal to provide the construction materials observation and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation geotechnical engineering services for the above referenced publicly-funded project. The following are exhibits attached to this proposal. Exhibit A Project Understanding Exhibit B Scope of Services Exhibit C Compensation and Project Schedule Exhibit D Site Location Exhibit E Anticipated Exploration Plan Exhibit F Summary of Estimated Costs Exhibit G List of Contractor Project Manager and Subcontractors This budget proposal may be accepted by executing a signed Purchase Order/Work Order and returning the executed copy to Terracon. The Scope of Work proposed in this proposal and the Proposal for Services and accompanying limitations agreed to in the Indefinite Quantity Professional Services Agreement (TFC Contract No. 00-000-000 / RFQ No. 303-1-01246) shall constitute the exclusive services to be performed for this project. Sincerely, Terracon Consultants, Inc. Xxxxx Xxxxx Xxxxxxxxx, X.X. Xxxxx X. Xxxxxx, P.E. Project Geotechnical Engineer Senior Principal, Geotechnical Department Manager Terracon Consultants, Inc. 0000 Xxxxxxxxxx Xxxx Xxxxxxxxx, Xxx xx 000 Xxxxx x, XX 00000 Xxxx xxxxxxxx No. F - 3272 P ( 000) 000 0000 F ( 000) 000 0000 terracon. com DocuSign Envelope ID: E6130EDB-9FBC-4ECC-A2D5-23FA637F4803 Proposal for Geotechnical Engineering Services DPS Northwest Area Office Pavements ■ Austin, Texas March 17, 2022 ■ Terracon Proposal No. X00000000 EXHIBIT A - PROJECT UNDERSTANDING Our Scope of Services is based on our understanding of the project, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, project as described by Texas Facilities Commission and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve expected subsurface conditions as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing servicesdescribed below. We have not visited the project site to confirm the information provided. Aspects of the project, undefined or assumed, are highlighted as shown below. We request the design team verify all information prior to our initiation of field exploration activities. Site Location and Anticipated Conditions Item Description Parcel Information The project is located at 13730 Research Boulevard in Austin, Texas. Existing Improvements Existing building and pavements. Current Ground Cover Grass and concrete. Existing Topography (from Google Earth ®) Per Google Earth®, the ground surface appears to slope from ~EL 937 feet in the south downhill to ~EL 931 feet in the north. Once a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional informationprofessional topographic survey is available, please call us at (000) 000 0000provide such information to Terracon. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer ReviewSite Access We expect the site, and Report Distribution 10% all exploration locations, are accessible with our truck- mounted drilling equipment. Expected Subsurface Conditions Our experience near the vicinity of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 the proposed development and/or geologic maps indicates subsurface conditions consist of clayey soils underlain by Austin Group limestone. Planned Construction Item Description Information Provided Email and site plan with requested boring locations provided by Xx. Xxxx Xxxxx with Texas Facilities Commission on March 33rd, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPac2022.

Appears in 1 contract

Samples: www.tfc.texas.gov

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXX, INC. [INSERT PSP NAME] By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx., P.E. Print Name: Executive Director Sr. Vice President and COO Print Title: Date signed: Date signed: Approved: Xxx Xxxxxxx Assistant General TFC Legal Counsel PM/Xxxxxxx Xxxxxxxx PM/ Dir/Xxxxx X. Xxxxx DED/X.X. Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail toDocuSign Envelope ID: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3, 2023 Xx. Xxxxxxx Xxxxxxxx TFC 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Dear Xx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Inc. (RKCI) is pleased to submit our proposal to provide the E7DAE2F8-E811-4779-8C63-9F592F2C9FB8 PACKAGE 3 - SCORED MATERIAL ORGANIZATIONAL CHART KEY geotechnical construction materials observation and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services for the referenced project. This budget is based on our understanding of the projectZY XXXXXXX, an estimate of quantitiesCET, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencingCWI PROJECT MANAGER/ SENIOR SPECIAL INSPECTOR XXXXXX XXXXXXXXX, delaysPE SENIOR VICE PRESIDENT/ QUALITY CONTROL XXXXXXX XXXXXXXXXX, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materialsPE, PG POINT OF CONTACT/ BRANCH MANAGER ECS PROJECT TEAM XXXXXX XXXXX, PE GEOTECHNICAL DEPARTMENT MANAGER XXXXX XXXXXX, CET CONSTRUCTION MATERIALS DEPARTMENT MANAGER Texas Facilities Commission RFQ 000-0-00000 page | 5 ™ DocuSign Envelope ID: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved ByE7DAE2F8-E811-4779-8C63-9F592F2C9FB8 DocuSign Envelope ID: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AHE7DAE2F8-E811-4779-8C63-9F592F2C9FB8 DocuSign Envelope ID: am AttachmentsE7DAE2F8-E811-4779-8C63-9F592F2C9FB8 DocuSign Envelope ID: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23E7DAE2F8-051E811-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name4779-8C63-9F592F2C9FB8 DocuSign Envelope ID: Camp Xxxxxxd CH6 concrete testing Project LocationE7DAE2F8-E811-4779-8C63-9F592F2C9FB8 DocuSign Envelope ID: Camp Xxxxxxd Campus on N MoPac Contact NameE7DAE2F8-E811-4779-8C63-9F592F2C9FB8 DocuSign Envelope ID: Xxxxxxx Xxxxxxxx ClientE7DAE2F8-E811-4779-8C63-9F592F2C9FB8 DocuSign Envelope ID: TFC AddressE7DAE2F8-E811-4779-8C63-9F592F2C9FB8 DocuSign Envelope ID: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone NumberE7DAE2F8-E811-4779-8C63-9F592F2C9FB8 DocuSign Envelope ID: 000.000.0000 (O) 000.000.0000 (M) E MailE7DAE2F8-E811-4779-8C63-9F592F2C9FB8 DocuSign Envelope ID: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 GeneralE7DAE2F8-E811-4779-8C63-9F592F2C9FB8 DocuSign Envelope ID: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacE7DAE2F8-E811-4779-8C63-9F592F2C9FB8 DocuSign Envelope ID: E7DAE2F8-E811-4779-8C63-9F592F2C9FB8 DocuSign Envelope ID: E7DAE2F8-E811-4779-8C63-9F592F2C9FB8 DocuSign Envelope ID: E7DAE2F8-E811-4779-8C63-9F592F2C9FB8

Appears in 1 contract

Samples: Professional Engineering Services Agreement

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXTERRACON CONSULTANTS, INC. By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx.Xxxxx Xxxxxxxxxxx, P.E. Executive Director Sr. Vice President and COO Date signed: 06/14/2022 | 9:54 AM CDT Date signed: 06/14/2022 | 9:50 AM CDT Approved: Xxx Xxxxxxx Assistant X. Xxxxxx General Counsel PM/Xxxxxxx Xxxxx Xxxxxxxx Dir/Xxxxx Xxxxx DED/Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail toDocuSign Envelope ID: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3DCB64C8E-255A-4E9F-904C-76E084D2D4C3 April 4, 2023 Xx. Xxxxxxx Xxxxxxxx TFC 2022 Texas Facilities Commission Facilities Design and Construction 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx 00000 Attn: Xx. Xxxxx Xxxxxxxx P: (000) 000-0000 E: xxxxx.xxxxxxxx@xxx.xxxxx.xxx Re: Construction Materials Testing Proposal for Asbestos Consulting Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac DSHS Deferred Maintenance Project Building F, Department of Health Tower, and North Link Corridor 0000 Xxxx 00xx Xxxxxx Xxxxxx, Xxxxx 00000 Terracon Proposal No. P96227311 Dear Xx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Terracon Consultants, Inc. (RKCITerracon) is pleased to submit our this proposal to provide the construction materials observation and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation asbestos consulting services for the referenced project. This budget is based on our understanding abatement phase of the project, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in project at the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposalabove referenced locations. The scope of services is intended to meet state and federal requirements for asbestos abatement projects conducted prior to renovation or demolition operations in public buildings. Terracon understands the work includes will include the observation removal of asbestos-containing HVAC duct mastic materials throughout Building F; removal of asbestos-containing floor tile and testing mastic materials from selection portions of the following construction materials: Concrete compressive strength specimen sampling2nd, testing4th, 5th, and reporting. This proposal may serve as RKCI’s work agreement for 7th Floors (primarily common corridors and a variety of smaller areas in close proximity to the referenced project. Please sign this proposalcommon corridors) in the Department of Health Tower (DHT); and removal of asbestos-containing plaster materials from the south, initial every page of each attachment, fill out the Report Distribution Listwest, and return one signed original east exterior elevations and southeast interior area of the North Link Corridor (connecting Building F and DHT) prior to our office renovation activities. The asbestos-containing materials (ACM) were identified as authorization for RKCI to provide these servicespart of previous asbestos surveys conducted by Terracon in 2017 and 2018 (Project Nos. If you choose to issue your own purchase order or work agreement96177344 and 96187083). Terracon Consultants, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional informationInc. 0000 Xxxxxxxxxx Xxxx Xxxxxxxxx, please call us at Xxxxx 000 Xxxxxx, Xxxxx 00000 P (000) 000 00000000 F (000) 000 0000 xxxxxxxx.xxx Terracon proposes to prepare abatement plans and specifications, provide air monitoring/inspection services during abatement and prepare project closeout documents following abatement operations as part of the scope of work in this proposal. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3Terracon understands that a Texas Department of State Health Services (TDSHS) licensed Abatement Contractor will be selected for the asbestos abatement services. DocuSign Envelope ID: DCB64C8E-255A-4E9F-904C-76E084D2D4C3 Proposal for Asbestos Consulting Services DSHS DM Project – Building F, 2023 Very truly yoursDHT, and North Link Corridor ■ Austin, Texas April 4, 2022 ■ Terracon Proposal No. P96227311 PROPOSED SCOPE OF SERVICES Task 1 - Asbestos Abatement Design Terracon will review site conditions and compare the current finish materials with existing sampling data, quantify and locate known asbestos-containing materials and utilize any available data to develop a site specific set of asbestos abatement plans and specifications for the removal and disposal of the identified ACM from the above referenced locations. The specifications will be prepared by a TDSHS licensed Individual Asbestos Consultant in accordance with current local, state and federal regulations. Two (Signature2) (Printed copies of the documents will be provided to the Client and the Asbestos Abatement Contractor selected for abatement work. The specifications will define abatement practices, procedures and inspection protocols. Task 2 - Project Implementation Terracon will provide a licensed Asbestos Consultant and Technicians, who will be available for periodic inspections and air sampling throughout the duration of the removal project. The Asbestos Consultant will coordinate operations with and for the Client and provide abatement project management for the duration of the project. Terracon will also review all pre-job submittals pertaining to asbestos abatement prior to the beginning of the project. Critical visual inspections conducted prior to the start of work and at the completion of abatement prior to encapsulation, will be conducted by the Consultant or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET a qualified Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope delegated by the Consultant. Air monitoring will be conducted during the abatement activities. The air samples collected during the work periods and following completion of Work Report Distribution Terms abatement activities will be analyzed on-site by Phase Contrast Microscopy (PCM) in accordance with the National Institute of Occupational Safety and Conditions Health (DateNIOSH) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacMethod 7400.

Appears in 1 contract

Samples: www.tfc.texas.gov

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXWOOD ENVIRONMENT & INFRASTRUCTURE SOLUTIONS, INC. By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx., P.E. Xxxxxxxx High Executive Director Sr. Vice President and COO Texas Office Manager Date signed: 01/31/2022 | 1:29 PM CST Date signed: 01/31/2022 | 1:08 PM CST Approved: Xxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx Xxx Xxxxxxxx Dir/Xxxxx Xxxxx DED/Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail toDocuSign Envelope ID: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3D4BCBDD9-5E68-496B-9DAB-F7D90DB5DA70 December 22, 2023 2021 Xx. Xxxxxxx Xxxxxxxx TFC Xxx Xxxxxxxx, PMP, CTCM Project Manager Facilities Design & Construction Texas Facilities Commission Wood Environment & Infrastructure Solutions, Inc. 0000 Xxxxxxxxx Xxxxxx Xxxxx, Xxx Xxxxxxx Xxxxxxxxx 000 Xxxxxx, Xxxxx 00000 ReT: Construction Materials Testing 000-000-0000 xxx.xxxxxxx.xxx Subject: Proposal for Abatement Consulting Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac LBJ Building Floor 6 000 Xxxx 00xx Xxxxxx, Xxxxxx, Xxxxx 00000 Wood Proposal No. 670621AU22.02 Dear Xx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX ConsultantsXxxx Environment & Infrastructure Solutions, Inc. (RKCIWood) is pleased appreciates the opportunity to submit present our proposal to the Texas Facilities Commission (TFC) to provide asbestos abatement consulting services prior to upcoming renovations at the construction materials observation and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services for the referenced projectXxxxxx X. Xxxxxxx (LBJ) Building, Floor 6. This budget is based on proposal presents our understanding approach to providing asbestos design and monitoring services, using our multi-disciplinary capabilities and knowledge of the projectasbestos abatements. The following sections present our Scope of Work, an estimate of quantitiesSchedule, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposalFee Estimate. The scope of work includes services will be performed in accordance with the observation terms and testing of conditions outlined in the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work professional services agreement, please reference our proposal number. Thank you for allowing RKCI TFC Contract 00-000-000, between the opportunity to submit our proposal for the construction materials observation Texas Facilities Commission and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional informationWood Environment & Infrastructure Solutions, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Inc. Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March Xxxx performed an asbestos survey of Floors 2, 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin6, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review11 and Suite 124, and results are included in our report titled Report Distribution of Pre-Renovation Asbestos Survey, and dated January 21, 2021. It was determined that the drywall construction on Floor 6 (approximately 15,000 SF) is an asbestos-containing material and is expected to be disturbed during the upcoming renovation project. Based on results of our asbestos survey, we will prepare an asbestos abatement specification as required by the Texas Department of State Health Services (TDSHS). The abatement activities will be limited to the areas determined to contain asbestos-containing building materials as determined by our survey. We will attend one abatement preconstruction meeting, and coordinate the removal operations and scheduling with the TFC and abatement personnel. During abatement, we will have a Texas licensed asbestos project manager/air monitoring technician on-site at all times the abatement contractor is performing removal operations in order to observe and document on-site conditions as required by state law. Our on-site licensed project manager/air monitoring technician will collect ambient air samples during abatement for in-house analysis utilizing phase contrast microscopy (PCM) techniques and provide visual clearance after completion of the removal. Close-out documentation submitted to TFC will include a written report detailing the scope of work, materials abated, conditions observed, procedures used, air sample results, identification of certified abatement and monitoring personnel, and documentation of waste disposal. ‘Wood’ is a trading name for Xxxx Xxxx Group PLC and its subsidiaries DocuSign Envelope ID: D4BCBDD9-5E68-496B-9DAB-F7D90DB5DA70 Proposal for Asbestos Consulting Services Wood Proposal No.: 670621AU22.02 LBJ Building, Floor 6 December 22, 2021 Schedule and Fee Information Upon notice to proceed from the TFC, Xxxx will proceed with the asbestos abatement design. Wood will provide the design specifications to TFC within two weeks of NTP. Notification to DSHS requires a ten (10% ) working day period before any disturbance of total cost $129.90 GRAND TOTAL $1,428.90 ACMs may occur. TFC IDIQ C PAD23 050 00 March 3will be responsible for payment of required notification fees to the DSHS. Based on the type, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacquantity, and locations of material anticipated for removal, and the availability and efficiency of the abatement contractor, asbestos abatement is expected to take Fifteen (15) 10-hour workdays for Floor 6. After completion of abatement, we estimate it will take two (2) business week to submit the final abatement report.

Appears in 1 contract

Samples: www.tfc.texas.gov

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXLCCX, INC. LLC DBA XXXXXX XX XXXXXXXX CX ______________________________ By: _ By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx.X. Xxxxxx, P.E. Date of execution: Executive Director Sr. Vice President and COO Managing Member Date signedof execution: Date signed01/26/2021 | 8:46 AM CST 01/26/2021 | 6:39 AM PST PM GC Dir DED EXHIBIT A DocuSign Envelope ID: Approved546DE0DA-AC39-4AD2-B296-60FED6466A3F DocuSign Envelope ID: Xxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx Xxxxxxxx Dir/B21A61DD-2AA0-4949-891A-64875B2B485E October 26, 2020 Xxxxx Xxxxx DED/Xxxx X. Xxxx Xxxxxxxx, CTCM Senior Project Manager Facilities Design & Construction Division Texas Facilities Commission 1711 San Jacinto Austin, TX 78712 RE: Proposal LCCx 20.1003 Professional Engineering Services – HVAC Test Adjust Balance DSHS Campus Tower Building TFC IDIQ C [Delivered by E mail toProject Number: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3, 2023 Xx. Xxxxxxx Xxxxxxxx TFC 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac 018-014-5530 Dear Xx. Xxxxxxxx: 0000 Xxxxxxx XxxxThank you for the opportunity for Xxxxxx xx Xxxxxxxx Cx (hereinafter called LCCx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Inc. (RKCILLC) is pleased to submit furnish our proposal to provide the construction materials observation and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services Professional TAB Engineering Services to TFC Project Management (Hereinafter called CLIENT) for the above referenced projectproject (hereinafter called PROJECT). This budget is based on Proposal Letter outlines our understanding of the projectFee proposal subject to a formal agreement. PROJECT SCOPE Provide Professional TAB Services, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposalPROJECT. The scope of Coordinate all TAB work includes with the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reportingProject Manager. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacGENERAL ASSUMPTIONS:

Appears in 1 contract

Samples: Professional Services Agreement

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXTERRACON CONSULTANTS, INC. By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx.Xxxxx Xxxxxxxxxxx, P.E. Executive Director Sr. Vice President and COO Date signed: 03/15/2022 | 9:44 AM CDT Date signed: signed:03/15/2022 | 9:41 AM CDT Approved: Xxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx Xxxxxxxx Xxxx Xxxxx Dir/Xxxxx Xxxxx DED/Xxxx X. Xxxx TFC IDIQ C [Delivered Contract 00-000-000 - Assignment No. 5 - EXHIBIT A This Proposal is accpeted by E mail tothe mutual execution of Assignment No.5 to TFC IDIQ Contract No. 00-000-000 DocuSign Envelope ID: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3, 2023 XxCF3D5077-5E8D-4359-B3CA-A8098F8709D3 DocuSign Envelope ID: CF3D5077-5E8D-4359-B3CA-A8098F8709D3 Exhibit B TFC IDIQ Contract No. Xxxxxxx Xxxxxxxx TFC 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Dear Xx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX 00-000-000 Terracon Consultants, Inc. Assignment No. 5 Project No. 00-000-0000 List of PSP Project Manager and Subcontractors (RKCI) is pleased to submit our proposal to provide the construction materials observation and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services for the referenced project. This budget is based on our understanding of the projectName, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Address & Contact Person (Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacManager))

Appears in 1 contract

Samples: www.tfc.texas.gov

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXLCCX, INC. LLC DBA XXXXXX XX XXXXXXXX CX ______________________________ By: _ By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx.X. Xxxxxx, P.E. Date of execution: Executive Director Sr. Vice President and COO Managing Member Date signedof execution: Date signed01/26/2021 | 8:46 AM CST 01/26/2021 | 6:39 AM PST PM GC Dir DED EXHIBIT A DocuSign Envelope ID: Approved546DE0DA-AC39-4AD2-B296-60FED6466A3F DocuSign Envelope ID: Xxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx Xxxxxxxx Dir/B21A61DD-2AA0-4949-891A-64875B2B485E October 26, 2020 Xxxxx Xxxxx DED/Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3Xxxxxxxx, 2023 Xx. Xxxxxxx Xxxxxxxx TFC CTCM Senior Project Manager Facilities Design & Construction Division Texas Facilities Commission 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx XX 00000 ReRE: Construction Materials Testing Proposal LCCx 20.1003 Professional Engineering Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx – HVAC Test Adjust Balance DSHS Campus on N MoPac Tower Building TFC Project Number: 018-014-5530 Dear Xx. Xxxxxxxx: 0000 Xxxxxxx XxxxThank you for the opportunity for Xxxxxx xx Xxxxxxxx Cx (hereinafter called LCCx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Inc. (RKCILLC) is pleased to submit furnish our proposal to provide the construction materials observation and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services Professional TAB Engineering Services to TFC Project Management (Hereinafter called CLIENT) for the above referenced projectproject (hereinafter called PROJECT). This budget is based on Proposal Letter outlines our understanding of the projectFee proposal subject to a formal agreement. PROJECT SCOPE Provide Professional TAB Services, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposalPROJECT. The scope of Coordinate all TAB work includes with the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reportingProject Manager. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacGENERAL ASSUMPTIONS:

Appears in 1 contract

Samples: Professional Services Agreement

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXTERRACON CONSULTANTS, INC. By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx.Xxxxx Xxxxxxxxxxx, P.E. Executive Director Sr. Vice President and COO Date signed: 11/04/2021 | 10:56 AM CDT Date signed: 11/04/2021 | 10:37 AM CDT Approved: Xxx Xxxxxxx Assistant General TFC Legal Counsel PMFMO CM/Xxxxxxx Xxxxxxxx Xxxxxx FDC Dir/Xxxxx Xxxxx FDC DED/X.X. Xxxx X. FMO Mgr./Xxxxxx Xxxxx FMO Dir/Xxxxx Xxxxxxxx COO/Xxxx TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3Xxxxxxx October 11, 2023 Xx. Xxxxxxx Xxxxxxxx TFC 2021 Texas Facilities Commission General Maintenance 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx 00000 Attn: Xx. Xxxxx Xxxxxx P: (000) 000-0000 E: xxxxx.xxxxxx@xxx.xxxxx.xxx Re: Construction Materials Testing Proposal for Asbestos Consulting Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Department of Health Main Building – Rooms 103, 104, 105, and 107 000 X. 00xx Xxxxxx Xxxxxx, Xxxxx 00000 Terracon Proposal No. P96217805 Dear Xx. XxxxxxxxXxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Terracon Consultants, Inc. (RKCITerracon) is pleased to submit our this proposal to provide the construction materials observation and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation asbestos consulting services for the referenced project. This budget is based on our understanding abatement phase of the project, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in project at the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposalabove referenced location. The scope of services is intended to meet state and federal requirements for asbestos abatement projects conducted prior to renovation or demolition operations in public buildings. Terracon understands the work includes will include the observation removal of approximately 575 square feet of asbestos-containing floor tile and testing mastic materials from Rooms 103, 104, 105, and 107 on the 1st Floor of the Department of Health Main Building (DHB) prior to carpet replacement activities. The asbestos-containing materials (ACM) were identified as part of an asbestos survey conducted by Terracon on September 20, 2021 (Project No. 96217704). Terracon proposes to prepare abatement plans and specifications, provide air monitoring/inspection services during abatement and prepare project closeout documents following construction materials: Concrete compressive strength specimen sampling, testing, and reportingabatement operations as part of the scope of work in this proposal. This proposal may serve as RKCI’s work agreement Terracon understands that a Texas Department of State Health Services (TDSHS) licensed Abatement Contractor has been selected for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these asbestos abatement services. If you choose to issue your own purchase order or work agreementPROPOSED SCOPE OF SERVICES Task 1 - Asbestos Abatement Design Terracon Consultants, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional informationInc. 0000 Xxxxxxxxxx Xxxx Xxxxxxxxx, please call us at Xxxxx 000 Xxxxxx, Xxxxx 00000 P (000) 000 00000000 F (000) 000 0000 xxxxxxxx.xxx Terracon will review site conditions and compare the current finish materials with existing sampling data, quantify and locate known asbestos-containing materials and utilize any available data to develop a site specific set of asbestos abatement plans and specifications for the removal and disposal of the identified ACM from the above referenced locations. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3The specifications will be prepared by a TDSHS licensed Individual Asbestos Consultant in accordance with current local, 2023 Very truly yoursstate and federal regulations. Two (2) copies of the documents will be provided to the Client and the Asbestos Abatement Contractor selected for abatement work. The specifications will define abatement practices, (Signature) (Printed procedures and inspection protocols. Task 2 - Project Implementation Terracon will provide a licensed Asbestos Consultant and Technicians, who will be available for periodic inspections and air sampling throughout the duration of the removal project. The Asbestos Consultant will coordinate operations with and for the Client and provide abatement project management for the duration of the project. Terracon will also review all pre-job submittals pertaining to asbestos abatement prior to the beginning of the project. Critical visual inspections conducted prior to the start of work and at the completion of abatement prior to encapsulation, will be conducted by the Consultant or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET a qualified Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope delegated by the Consultant. Air monitoring will be conducted during the abatement activities. The air samples collected during the work periods and following completion of Work Report Distribution Terms abatement activities will be analyzed on-site by Phase Contrast Microscopy (PCM) in accordance with the National Institute of Occupational Safety and Conditions Health (DateNIOSH) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacMethod 7400.

Appears in 1 contract

Samples: www.tfc.texas.gov

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXX AND XXXXXXX, INC. By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx., P.E. Xxxxx Xxxx Executive Director Sr. Principal/Vice President and COO Date signed: 01/26/2022 | 12:23 PM CST Date signed: 01/26/2022 | 9:28 AM PST Approved: Xxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx Xxxxxxxx Xxxx Xxxxx Dir/Xxxxx Xxxxx DED/Xxxx X. Xxxx DocuSign Envelope ID: 67B37D36-0ABA-4FB7-B837-F6AAAFE04CF3 TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3Contract 00-000-000 Assignment No. 1 - EXHIBIT A 0000 Xxxxxxxxxxxxx Xxxxx, 2023 Xx. Xxxxxxx Xxxxxxxx TFC Xxxxx 000  Xxxx Xxxxx, Xxxxx 00000  000-000-0000  fax 000-000-0000 xxx.xxxxxx.xxx September 16th 2021 Xxxx Xxxxx Project Manager Facilities Design & Construction Texas Facilities Commission 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx Xxxxxx XX 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Pre-construction and Guaranteed Max Price Phase Project Support for DPS Deferred Maintenance Design Build Contract Dear Xx. XxxxxxxxXxxxx: 0000 Xxxxxxx XxxxPursuant to our discussion and your request for proposal on September 1, Xxxxx X-000 Xxxxxx2021, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX ConsultantsXxxxxx and Xxxxxxx, Inc. (RKCIFNI) is pleased to submit our this proposal to provide the construction materials observation Texas Facilities Commission (TFC or Client) for providing professional Architectural and testing Engineering services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services required for the referenced projectA/E Pre-Construction and Design Phase Services associated with the DPS Deferred Maintenance Design Build Contract. This budget is based on Xxxx Xxxxxx, P.E., shall be our understanding of the project, an estimate of quantities, and past experience with similar projectsproject manager for this important project which shall be accomplished under our new Professional Services Agreement IDIQ under RFQ: #000-0-00000. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services SCOPE OF SERVICES FNI will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of render the following construction materials: Concrete compressive strength specimen sampling, testing, professional Architectural and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these Engineering services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPaclisted below.

Appears in 1 contract

Samples: www.tfc.texas.gov

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXX AND XXXXXXX, INC. By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx., P.E. Xxxxx Xxxx Executive Director Sr. Principal/Vice President and COO Date signed: 06/20/2023 | 6:05 PM CDT Date signed: 06/20/2023 | 5:18 PM CDT Approved: Xxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx Xxxxxxxx Xxxx Xxxxx Dir/Xxxxx Xxxxx DED/Xxxx X. Xxxx Exhibit A PSP’s Proposal dated August 22, 2022 and TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3Contract No. 00-000-000 Xxxxxx and Xxxxxxx, 2023 XxInc. Assignment No. Xxxxxxx Xxxxxxxx TFC 2 Project No. 00-000-0000 PO No. 000-0-0000 Additional Services Proposal dated December 9,2022 9 Pages 00000 Xxxxxx Xxxxxx, Suite 300 □ Austin, Texas, 78759 □ 000-000-0000 □ fax 000-000-0000 xxx.xxxxxx.com August 22, 2022 Xxxx Xxxxx Project Manager, Facilities Design & Construction Texas Facilities Commission 0000 Xxx Xxxxxxx Xxxxxxxxx XxxxxxXxxxxxx, Xxxxx Xxxxxx XX 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac IDIQ 00-000-000 DPS Project Analysis for Williamson County TTC and El Paso HQ rev 1 Dear Xx. Xxxxxxxx: 0000 Xxxxxxx XxxxXxxxx, Xxxxx X-000 XxxxxxPursuant to our discussion and your request for proposal on June 21 and subsequent conversations, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultantsand feedback on the proposal provided August 12, Xxxxxx and Xxxxxxx, Inc. (RKCIFNI) is pleased to submit our this revised proposal to provide the construction materials observation and testing Texas Facilities Commission ( TFC, Client) for providing professional AE services on associated with the development of project referenced above. We propose an estimated budget of $1,428.90 analysis for testing and observation services for the referenced project. This budget is based on our understanding of the project, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacthe:

Appears in 1 contract

Samples: www.tfc.texas.gov

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXMEP ENGINEERING, INC. By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx.Xxxxxxxxx X. Xxxxx, P.E. Executive Director Sr. Vice President and COO Associate Principal Date signed: 06/13/2022 | 4:06 PM CDT Date signed: 06/13/2022 | 1:33 PM PDT Approved: Xxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx Xxxxxxxx Dir/Xxxxx Xxxxx DED/Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3May 18, 2023 Xx. 2022 (Revised 5/19/2022) AIA, CTCM Xxxxxxx Xxxxxxxx TFC Xxxxxxxx, Senior Project Manager Texas Facilities Commission Facilities, Design & Construction 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx 00000 Re: Construction Materials Testing Services Proposal for Texas DMV Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac XX-6 Large Paper Roll Storage Dear Xx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX ConsultantsMEP Engineering, Inc. (RKCI) is pleased to submit our proposal to provide the construction materials observation and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services for the referenced project. This budget is based on our understanding of the project, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI appreciates the opportunity to submit our this proposal for professional services on the construction materials observation above-referenced project. As requested, this proposal has been developed for Design/Construction Administration Services with a project scope of work as noted herein. It is MEP’s understanding that the terms and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction conditions of this project. If you have any questions concerning our proposal or need any additional informationproject assignment agreement will be defined by the standard form of TFC’s Professional Architectural/Engineering Services Agreement, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPaclatest edition.

Appears in 1 contract

Samples: www.tfc.texas.gov

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXX, INC. [INSERT PSP NAME] By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx., P.E. Print Name: Executive Director Sr. Vice President and COO Print Title: Date signed: Date signed: Approved: Xxx Xxxxxxx Assistant General TFC Legal Counsel PM/Xxxxxxx Xxxxxxxx PM/ Dir/Xxxxx X. Xxxxx DED/X.X. Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail toDocuSign Envelope ID: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3B56BF2B7-588F-4C84-A138-5DFF8EC679B5 DocuSign Envelope ID: B56BF2B7-588F-4C84-A138-5DFF8EC679B5 ORGANIZATION CHART Program Manager/Point of Contact Xxxxx Xxxxxxxxx, 2023 Xx. ., PG QA/QC Manager Xxxxxxx Xxxxxxxx TFC 0000 Xxx Xxxxxx Project Manager Xxxxx Xxxxx, PE Lead Mold and Asbestos Consultant Xxxxxx Xxxxxxx Xxxxxxxxx Phase I and Phase II ESA Lead Xxxxxx Xxxxxx, PG Project Professional Xxxxxxx Xxxxxx Senior Project Professional Xxxxx 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Dear Xx. Xxxxxxxx: 0000 Xxxxxxx XxxxXxxxxxx, Xxxxx X-000 PE Senior Project Professional Xxxxxx Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX ConsultantsGIT Project Professional Xxxxxxxxxxx Xxxxx Senior Project Professional Xxxxxxx (Alex) Xxxxxx Subcontractors Alamo Analytical Laboratories Alamo Environmental, Inc. (RKCI) is pleased to submit our proposal to provide the construction materials observation A&J Enterprise Purely Environmental Xxxxx Labs, LLC Phase I and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing Phase II Environmental Site Assessments/ RFQ #000-0-0000 /Texas Facilities Commission 3 DocuSign Envelope ID: B56BF2B7-588F-4C84-A138-5DFF8EC679B5 DocuSign Envelope ID: B56BF2B7-588F-4C84-A138-5DFF8EC679B5 DocuSign Envelope ID: B56BF2B7-588F-4C84-A138-5DFF8EC679B5 Exhibit F Criminal Background Checks and observation services for the referenced project. This budget is based on our understanding of the project, an estimate of quantities, Application Guidelines The Criminal Background Checks and past experience with similar projects. A cost estimate breakdown is presented Application Guidelines are located at this TFC Construction Contracts website link at 5E in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materialsPDF: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved Byxxxxx://xxx.xxx.xxxxx.xxx/divisions/facilities/prog/construct/formsindex/TEXAS%20FACIL ITIES%20COMMISSION%20CRIMINAL%20BACKGROUND%202016.pdf DocuSign Envelope ID: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AHB56BF2B7-588F-4C84-A138-5DFF8EC679B5 DocuSign Envelope ID: am AttachmentsB56BF2B7-588F-4C84-A138-5DFF8EC679B5 DocuSign Envelope ID: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23B56BF2B7-051588F-4C84-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project NameA138-5DFF8EC679B5 DocuSign Envelope ID: Camp Xxxxxxd CH6 concrete testing Project LocationB56BF2B7-588F-4C84-A138-5DFF8EC679B5 DocuSign Envelope ID: Camp Xxxxxxd Campus on N MoPac Contact NameB56BF2B7-588F-4C84-A138-5DFF8EC679B5 DocuSign Envelope ID: Xxxxxxx Xxxxxxxx ClientB56BF2B7-588F-4C84-A138-5DFF8EC679B5 DocuSign Envelope ID: TFC AddressB56BF2B7-588F-4C84-A138-5DFF8EC679B5 DocuSign Envelope ID: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone NumberB56BF2B7-588F-4C84-A138-5DFF8EC679B5 DocuSign Envelope ID: 000.000.0000 (O) 000.000.0000 (M) E MailB56BF2B7-588F-4C84-A138-5DFF8EC679B5 DocuSign Envelope ID: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 GeneralB56BF2B7-588F-4C84-A138-5DFF8EC679B5 DocuSign Envelope ID: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacB56BF2B7-588F-4C84-A138-5DFF8EC679B5

Appears in 1 contract

Samples: Engineering Services Agreement

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXX, INC. [INSERT PSP NAME] By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx., P.E. Print Name: Executive Director Sr. Vice President and COO Print Title: Date signed: Date signed: Approved: Xxx Xxxxxxx Assistant General TFC Legal Counsel PM/Xxxxxxx Xxxxxxxx PM/ Dir/Xxxxx X. Xxxxx DED/X.X. Xxxx DocuSign Envelope ID: E35DCB66-7E45-47AA-9A1F-684B91A847B0 Texas Facilities Commission DocuSign Envelope ID: E35DCB66-7E45-47AA-9A1F-684B91A847B0 IDIQ for Professional Civil Engineering & Land/Utility Surveying Services (RFQ #303-1-02152) Organizational Chart Halff provides experienced professionals who are committed to the successful execution of projects for TFC. The following organizational chart identifies key people who are available and ready for assignment to projects. Halff has assembled a project team whom is organized to be efficient, consistent, and accessible. Resumes for key personnel can be found on the following pages. FIRMWIDE SUPPORT Xxxx Xxxxxxxxxx, PE 2 Xxxxxxx Xxxxx, PE 3 FIRMWIDE SUPPORT Xxxxxxx X. XxXxxxx, PE 3 Xxxxxx X. Xxxxx, PE, CFM, PMP 4 Xxxxxxx Xxxxxxx, PE, CPESC 6 FIRMWIDE SUPPORT Xxxxx Steel 8 Xxxx Xxxxxxxx, RPLS 4 Xxxx Xxxxx, CP 2 Xxxxxx Xxxxxxx, RPLS 5 TASK LEAD Xxxx Xxxxx, PE 1 LOCAL SUPPORT Xxxxx Xxxxxx, PE 1 Xxxxxx Xxxxxx, PE 1 Xxxx Xxxxxxx 1 SUBSURFACE UTILITY ENGINEERING (SUE) CIVIL SURVEY Program Manager Xxxx Xxxxxx, PE 1 TEXAS FACILITIES COMMISSION QA/QC Manager Xxxxxx Xxxxxx, PE 7 TASK LEAD Xxx Xxxxx, RPLS 1 LOCAL SUPPORT Xxxxx Xxxxxx, RPLS 1 Xxxx Xxxxxx, RPLS 1 Xxxx Xxxxx, SIT 1 Xxxx X. Xxxxxxxxxx, Xx., SIT 1 TASK LEAD Xxxx TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3, 2023 Xx. Xxxxxxx Xxxxxxxx TFC 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Dear Xx. Xxxxxxxx: 0000 PE 1 LOCAL SUPPORT Xxxx Xxxxx, PE, PTOE 1 Xxxx Xxxxxx, PE CFM 0 Xxxxxxx Xxxx, Xxxxx X-000 XxxxxxPE 1 Xxxxxxx Xxxxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX ConsultantsPE, Inc. (RKCI) is pleased to submit our proposal to provide the construction materials observation and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services for the referenced project. This budget is based on our understanding of the project, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materialsCFM 1 ADDITIONAL STAFF RESOURCES UTILITY RELOCATION/SUE Firmwide: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By29 Local: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH11 CIVIL Firmwide: am Attachments220 Local: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD2339 SURVEY Firmwide: 91 Local: 15 RIGHT-051OF-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project NameWAY Firmwide: Camp Xxxxxxd CH6 concrete testing Project Location22 Local: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip 1 OFFICE LOCATION 1—Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacTexas

Appears in 1 contract

Samples: Professional Engineering Services Agreement

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXXXXX, XXXXXXX & ASSOCIATES, INC. By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx., P.E. Xxx Xxxxx Executive Director Sr. Vice President and COO Project Principal / Program Manager Date signed: 02/01/2022 | 12:38 PM CST Date signed: 02/01/2022 | 11:09 AM CST Approved: Xxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx Xxxxxxxx Dir/Xxxxx Xxxxx DED/Xxxx X. Xxxx DocuSign Envelope ID: 18AF586B-843A-4D5B-9FC4-54EA1F344089 DocuSign Envelope ID: 3E020DB4-B7C0-40C2-A5FF-38CC8D5E1DE1 TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3Contract No. 00-000-000 Assignment No. 1 Exhibit A January 25, 2023 Xx. 2022 Xxxxxxx Xxxxxxxx TFC Project Manager Facilities Design & Construction Texas Facilities Commission 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx 00000 ReRE: Construction Materials Testing Services TFC Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Project – XXX Services Dear Xx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX ConsultantsXxxxxxx & Associates, Inc. (RKCICobbFendley) is pleased to submit this scope and fee proposal Subsurface Utility Engineering (XXX) for the TFC Camp Xxxxxxx campus located along Xxxxxxx Street north of 35th Street in Austin, Texas. It is our proposal understanding that this campus will become the new Headquarters for the Texas Department of Motor Vehicles (TxDMV). The estimated fee for these services is included in Attachment 1. Supporting scope and assumption details for the professional services are described in Attachment 2. We anticipate beginning work 10 days after notice to provide proceed (NTP). We will develop an integrated schedule for XXX services in conjunction with the construction materials observation and testing services other teams (i.e., Architect of Record, Construction Manager at Risk, Geotechnical, etc.) involved on the project referenced aboveproject. These services will be completed under TFC Contract No. 00-000-000 (IDIQ Professional Engineering Services Agreement for Civil Engineering and Land/Utility Surveying). We propose an estimated budget of $1,428.90 for testing and observation services for the referenced project. This budget is based on our understanding of the project, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing implementing these services to you during the construction of important support activities on this projectvery important project for TFC. If you have any questions concerning our proposal or need any additional informationSincerely, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3XXXX, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS& ASSOCIATES, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D.Xxxxx, P.E. CoMET Xxxxx Xxxx, P.E. Project Principal | Executive Vice President Principal | Project Manager DB/AH000 Xxxx Xxxxxxxx Xxxxx, Xxxxx 000 | Xxxxxx, Xxxxx 00000 | 000.000.0000 | fax 000.000.0000 | xxx.xxxxxxxxxxx.xxx TBPE Firm Registration No. F-274 | TBPLS Registration No. 10046701 DocuSign Envelope ID: am Attachments18AF586B-843A-4D5B-9FC4-54EA1F344089 DocuSign Envelope ID: Cost Estimate Breakdown 3E020DB4-B7C0-40C2-A5FF-38CC8D5E1DE1 TFC IDIQ Contract No. 00-000-000 Assignment No. 1 Exhibit A ATTACHMENT 1 Subsurface Utility Engineering (XXX) Services TFC - Camp Xxxxxxx Site Services Engineer Project Management $ 8,210.00 Subsurface Utility Engineering $ 91,110.00 Total $ 99,320.00 DocuSign Envelope ID: 18AF586B-843A-4D5B-9FC4-54EA1F344089 ATTACHMENT 2 Scope of Work Report Distribution Terms and Conditions Services for Professional Services DocuSign Envelope ID: 18AF586B-843A-4D5B-9FC4-54EA1F344089 Project Management Xxxx, Xxxxxxx & Associates, Inc. CobbFendley will provide project management for the Camp Xxxxxxx Subsurface Utility Engineering (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacXXX). Assumptions

Appears in 1 contract

Samples: www.tfc.texas.gov

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties Parties, and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXX, INC. By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx., P.E. Xxxxxx X. Xxxx‌ Executive Director Sr. Senior Vice President and & COO Date signed: 04/18/2022 | 12:31 PM CDT Date signed: 04/18/2022 | 12:09 PM CDT Approved: Xxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx Xxxxxxxx Dir/Xxxxx Xxxxx DED/Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 Proposal No. PSF21-322-00 March 3February 8, 2023 Xx2022 Texas Facilities Commission Central Services Bldg. Xxxxxxx Xxxxxxxx TFC 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxx. Xxxxxx, Xxxxx 00000 RePROPRIETARY RE: Construction Materials Testing Services Proposal for Architectural History Survey and Report for the Texas Facilities Commission (TFC) for the Redevelopment of the Texas Department of Motor Vehicles (TxDMV) Camp Xxxxxxx CH6 Concrete Testing Camo Campus, Austin, Texas. To Whom It May Concern: Xxxx Xxxxxxx Campus on N MoPac Dear Xx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Inc. (RKCIRKI) is pleased to submit our this proposal to the Texas Facilities Commission (TFC) for historical background review for the aforementioned project. The proposed undertaking will involve the demolition of one building and the evaluation of six historic-age buildings on the Texas Department of Motor Vehicles (TxDMV) Camp Xxxxxxx Campus in Austin, Texas. Funding for the project will come from the TFC. The Camp Xxxxxxx Campus, named for X.X. Xxxxxxx, a State Highway Commissioner, was originally part of land donated to the Texas State Guard in 1892 for Camp Xxxxx. In 1932, the State Highway Department began plans for a headquarters building at the site, which was completed in 1936 as part of the District 14 headquarters. New facilities were constructed beginning in 1952. Some of the extant structures on the site may be eligible for listing on the National Register of Historic Places (NRHP). In anticipation of the proposed undertaking, RKI proposes to conduct a historical background study that will be provided to the TFC and the Texas Historical Commission (THC) for their review. The reviewing agencies may also require a Historical Standing Structure survey. As such, RKI proposes to provide the construction materials observation and testing services on the project referenced above. We propose Historic Standing Structure Survey as an estimated budget of $1,428.90 for testing and observation services for the referenced project. This budget is based on our understanding of the project, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacoptional task.

Appears in 1 contract

Samples: www.tfc.texas.gov

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXX, INC. [INSERT PSP NAME] By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx., P.E. Print Name: Executive Director Sr. Vice President and COO Print Title: Date signed: Date signed: Approved: Xxx Xxxxxxx Assistant General TFC Legal Counsel PM/Xxxxxxx Xxxxxxxx PM/ Dir/Xxxxx X. Xxxxx DED/X.X. Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail toDocuSign Envelope ID: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3E37D55DE-A24E-417F-89B5-F8948C09DE2E DocuSign Envelope ID: E37D55DE-A24E-417F-89B5-F8948C09DE2E Team Organization TEXAS FACILITIES COMMISSION MEP/FP ENGINEERING POTENTIAL CONSULTANT TEAM MEMBERS XXXXXXXX GROUP (ARCHITECTURE/INTERIOR DESIGN) COST ESTIMATING LANDSCAPE ARCHITECTURE LOW VOLTAGE CIVIL ENGINEERING STRUCTURAL ENGINEERING LUMA JAFFAR AIA, 2023 Xx. Xxxxxxx Xxxxxxxx TFC 0000 Xxx Xxxxxxx Xxxxxxxxx XxxxxxRIBA, Xxxxx 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Dear Xx. Xxxxxxxx: 0000 Xxxxxxx XxxxLEED BD+C Principal-in-Charge/Lead Architect/Project Designer XXXXX XXXXXX AIA, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Inc. (RKCI) is pleased to submit our proposal to provide the construction materials observation and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services for the referenced project. This budget is based on our understanding of the project, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET NCARB Project Manager DBXXXX XXXXX Associate AIA, EDAC Project Architect XXXXXX XXXXXXXXX NCIDQ Sr. Interior Designer XXXX XXX XXXXXX NCIDQ Sr. Interior Designer/AHFFE xxx.xxxxxxxxxxxxxxxx.xxx | 3 DocuSign Envelope ID: am AttachmentsE37D55DE-A24E-417F-89B5-F8948C09DE2E DocuSign Envelope ID: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23E37D55DE-051A24E-417F-89B5-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project NameF8948C09DE2E DocuSign Envelope ID: Camp Xxxxxxd CH6 concrete testing Project LocationE37D55DE-A24E-417F-89B5-F8948C09DE2E DocuSign Envelope ID: Camp Xxxxxxd Campus on N MoPac Contact NameE37D55DE-A24E-417F-89B5-F8948C09DE2E DocuSign Envelope ID: Xxxxxxx Xxxxxxxx ClientE37D55DE-A24E-417F-89B5-F8948C09DE2E DocuSign Envelope ID: TFC AddressE37D55DE-A24E-417F-89B5-F8948C09DE2E DocuSign Envelope ID: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone NumberE37D55DE-A24E-417F-89B5-F8948C09DE2E DocuSign Envelope ID: 000.000.0000 (O) 000.000.0000 (M) E MailE37D55DE-A24E-417F-89B5-F8948C09DE2E DocuSign Envelope ID: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 GeneralE37D55DE-A24E-417F-89B5-F8948C09DE2E DocuSign Envelope ID: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacE37D55DE-A24E-417F-89B5-F8948C09DE2E DocuSign Envelope ID: E37D55DE-A24E-417F-89B5-F8948C09DE2E DocuSign Envelope ID: E37D55DE-A24E-417F-89B5-F8948C09DE2E DocuSign Envelope ID: E37D55DE-A24E-417F-89B5-F8948C09DE2E DocuSign Envelope ID: E37D55DE-A24E-417F-89B5-F8948C09DE2E

Appears in 1 contract

Samples: Architectural Services Agreement

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. [This Space Intentionally Left Blank] This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXXXXXXX X. XXXXX AND ASSOCIATES, INC. ___________________ By: By: _ Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx.Xxxx Xxxxxxxx, P.E. Executive Director Sr. Vice President and COO Principal, Managing Director Date signedof execution: Date signed04/07/2021 | 9:37 AM CDDTate of execution: Approved04/07/2021 | 9:29 AM EDT PM DGC Dir DED EXHIBIT A DocuSign Envelope ID: Xxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx Xxxxxxxx Dir/912E9B9C-6B36-466C-BA98-1427568E4F2E November 2, 2020 Mr. Xxxxx Xxxxx DED/Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3, 2023 Xx. Xxxxxxx Xxxxxxxx TFC Xxxxxx Project Manager Facilities Design & Construction Texas Facilities Commission 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Dear Xx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxx Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX ConsultantsRe: Proposal for Professional Services Texas Department of Public Safety Radio Antenna Complex Foundation Movement Assessment 00000 XX 00 Xxxxxxxx, Inc. (RKCI) Xxxxxx XX Xxxxxx X Xxxxx Proposal No. 20-0737 r1 Dear Xxxxx: Xxxxxx X Xxxxx is pleased to submit our this revised proposal to provide the construction materials observation and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation professional services for the referenced project. This budget proposal is presented in order to establish a basis for the commencement of our scope of services for the Project. We anticipate that this Proposal and Agreement for Professional Services and attachments, when signed, will serve as our entire Agreement unless superseded by another document signed by both parties. Basis of Proposal This proposal is based on our understanding phone call discussion on March 12, 2020 and subsequent emails the same day as well as in September and October of the project, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPac2020.

Appears in 1 contract

Samples: www.tfc.texas.gov

Entire Agreement and Modification. The This Agreement and this Assignment and their its integrated attachment(s) constitute the entire agreement of the Parties parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment Agreement specifically displays a mutual intent to amend a particular part of this AssignmentAgreement, general conflicts in language between any such attachment and this Assignment Agreement shall be construed consistently with the terms of this AssignmentAgreement. Unless otherwise expressly authorized by the terms of this AssignmentAgreement, no modification, renewal, extension, or amendment to this Assignment Agreement shall be binding upon the Parties parties unless the same is in writing and signed by the respective Parties parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXXXXX, XXXXXXX & ASSOCIATES, INC. By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx., P.E. Xxx Xxxxx Executive Director Sr. Vice President and COO Project Principal/Program Manager Date signed: 12/16/2021 | 11:56 AM CST Date signed: 12/16/2021 | 11:37 AM CST Approved: Xxx Xxxxxxx Assistant General TFC Legal Counsel PM/Xxxxxxx Xxxxxxxx Dir/Xxxxx X. Xxxxx DED/Xxxx X. X. Xxxx Exhibit A 2015 Uniform General Conditions The 2015 Uniform General Conditions (hereinafter referred to as "UGC") are located at this TFC IDIQ C Construction Contracts website link, at 5C in PDF: xxxxx://xxx.xxx.xxxxx.xxx/divisions/facilities/prog/construct/formsindex/2015%20UGC%20 03.07.2017.Final.pdf Exhibit B TFC 2018 Architectural/Engineering Guidelines, Edit Date March 19, 2018. The A/E Guidelines are located at this TFC A/E Forms link in PDF: https://xxx.xxx.xxxxx.xxx/divisions/facilities/prog/construct/formsindex/01%20-%202018% 20A-E%20GUIDELINES.pdf DocuSign Envelope ID: ADEA6A80-F803-42C4-84B1-43F542123585 INDEFINITE DELIVERY INDEFINITE QUANTITY PROFESSIONAL SERVICES AGREEMENT BETWEEN THE TEXAS FACILITIES COMMISSION AND [Delivered INSERT NAME] TFC CONTRACT NO. [INSERT NUMBER] ASSIGNMENT NO. X This Indefinite Delivery Indefinite Quantity Assignment No. X (hereinafter referred to as “Assignment No. X” or “Assignment”) is entered into by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3and between the Texas Facilities Commission, 2023 Xx. Xxxxxxx Xxxxxxxx TFC located at 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxxxxx, Xxxxxx, Xxxxx 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Dear Xx(hereinafter referred to as “TFC”) and [Insert PSP Name] located at [Insert Address] (hereinafter referred to as “PSP”) (TFC and PSP are hereinafter referred to individually as a “Party” or collectively as “Parties”), to be subject to the terms and conditions of TFC Contract No. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Inc. [Insert] (RKCI) is pleased hereinafter referred to submit our proposal to provide as the construction materials observation and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services for the referenced project. This budget is based on our understanding of the project, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays“Agreement”), and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacfollowing.

Appears in 1 contract

Samples: Professional Engineering Services Agreement

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXX, INCDELTA-T COMMISSIONING DBA DELTA-T LTD. By: By: Xxxx Xxxxx Xxxxxxx XxxxxxxXxxx X. Xxxxx, Xx.P.E., P.E. CxA, CEP Executive Director SrGeneral Partner Date of execution: 04/04/2020 | 7:53 AM CDT Date of execution: 04/03/2020 | 8:50 PM PDT GC Dir DED TFC Contract No. Vice President 00-000-000 Delta-T Commissioning dba Delta-T Ltd. Assignment No. 2 Project No. 00-000-0000 EXHIBIT A-2 PSP’S IDIQ ASSIGNMENT NO. 2 PROPOSAL DATED FEBRUARY 26, 2020 PROPOSAL February 26, 2020 To: Texas Facilities Commission Attention: Xxxxxx Xxx Xxxxxx.Xxx@xxx.xxxxx.xx.xx RE: Testing & Balancing JOB NAME: TSD Toddler Learning Center LOCATION: Austin, TX We propose to furnish the necessary tools, instruments and COO Date signed: Date signed: Approved: Xxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx Xxxxxxxx Dir/Xxxxx Xxxxx DED/Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3technicians to perform the testing, 2023 Xx. Xxxxxxx Xxxxxxxx TFC 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Dear Xx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Inc. (RKCI) is pleased to submit our proposal to provide the construction materials observation adjusting and testing balancing and commissioning services on the above referenced project referenced aboveas shown on the contract drawings and as outlined in the specifications. We propose an estimated budget of All tests shall be performed in accordance with the Associated Air Balance Council National Standards and ACG. THE ABOVE SERVICES SHALL BE PERFORMED FOR THE SUM OF: Test and Balance WRITTEN AMOUNT: Twenty-Three Thousand Five Hundred Dollars - $1,428.90 for testing 23,500.00 Commissioning WRITTEN AMOUNT: Twenty Thousand Five Hundred Dollars - $20, 500.00 Total Sum WRITTEN AMOUNT: Forty-Four Thousand Dollars - $44, 000.00 Test and observation services for the referenced project. This budget is based on our understanding Balance Services will include a complete TAB of the project, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacFollowing Systems:

Appears in 1 contract

Samples: www.tfc.state.tx.us

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXERC ENVIRONMENTAL & CONSTRUCTION SERVICES, INC. ., DBA ERC By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx., P.E. Xxxxx X. Xxxxxxxx Executive Director Sr. Vice President and COO Date signed: 03/10/2022 | 12:22 PM CST Date signed: 03/10/2022 | 8:48 AM PST Approved: Xxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx Xxxxxxxx Xxxxxx Xxxxxx Dir/Xxxxx Xxxxx DED/Xxxx X. Xxxx TFC IDIQ C Contract 00-000-000 Assignm DocuSign Envelope ID: BBD26975-ECC0-4C91-AAB0-EF1D2AE3B92C ent No. 1 - EXHIBIT A Revised: December 16, 2021 [Delivered by E mail toOriginal: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx December 14, 2021] PAD23 051 00 March 3, 2023 Xx. Xxxxxxx Xxxxxxxx TFC Xxxxxx X. Taylor, AIA, RID, LEED AP, CTCM Sr. Project Manager Texas Facilities Commissions Facilities Design and Construction 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx 00000 ReVia Email Xxxxxx.xxxxxx@xxx.xxxxx.xxx RE: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Proposal No. 21111.02.12 R1 Asbestos Abatement Design & Oversight TSLAC 00-000-0000 Xxx Houston Campus on N MoPac Main Building 000 XX 0000 Xx Xxxxxxx, XX 00000 Dear Xx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX ConsultantsPursuant to your request, ERC Environmental & Construction Services, Inc. (RKCIERC) is pleased to submit our proposal to provide the construction materials observation and testing services on the project referenced above. We propose an estimated budget of $1,428.90 following proposal for testing and observation services Asbestos Engineering Services (AES) for the above-referenced project. This budget is based on our understanding All communication will be through the client-designated representatives unless otherwise requested by the client. Asbestos Abatement Design Prepare and submit detailed project documents to include: • Project abatement documents (contract documents, plans and, specifications), includes site visits to confirm conditions, for abatement of the projectAsbestos-Containing Materials (ACM) in accordance with EPA, an estimate of quantitiesOSHA, state, city, and past experience other applicable regulations and recommendations. • Conduct a pre-bid meeting with similar projectsprospective contractors. A cost estimate breakdown is presented in the attached spreadsheet• Receive and evaluate bids; and negotiate contracts with contractors if/when directed by Owner. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (DocuSign EnvelopeTFC ID:IDIQFE31F680-1EF2-49BF-B0F2-77507C715C44Contract 00-000) -000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacAssignm

Appears in 1 contract

Samples: www.tfc.texas.gov

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXXXXXXXX CONSULTANTS, INC. By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx., P.E. Xxxxx X. Xxxxxx Executive Director Sr. Vice President and COO Date signed: 02/13/2023 | 10:52 AM CST Date signed: 02/13/2023 | 8:09 AM PST Approved: Xxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx Xxxxx Xxxxxxxx Dir/Xxxxx Xxxxx DED/Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail toContract 00-000-000 - Assignment No. 1 DocuSign Envelope ID: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3C7A8CE6B-6A81-49AB-9A7E-33A23AADA317 May 20, 2023 2022 Exhibit A Xx. Xxxxxxx Xxxxx Xxxxxxxx TFC Project Manager Texas Facilities Commission (TFC) Design and Construction 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx XX 00000 Re: Professional Engineering Services of DM Projects at State Building in Austin – DSHS Building A-100 – Cleanup and Abatement Construction Materials Testing Administration Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac - 044667 Dear Xx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Inc. (RKCI) is pleased Consultants appreciates the opportunity to submit our this proposal to provide the construction materials observation and testing for additional professional engineering/architectural services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services for the above referenced project. This budget is based on our understanding proposal has been developed as Professional Engineering Services to provide input and oversight for Construction Administration of the project, an estimate Cleanup / Abatement of quantities, and past experience with similar projectsthe DSHS Campus Building A-100. A cost estimate breakdown It is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times Xxxxxxx Consultants understanding that the client or their representative requests our services will affect the suggested budget. Services terms and conditions of this project assignment agreement will be provided on a call out basis for defined by the cost estimate spreadsheet attached to this proposalstandard form of TFC’s Professional Architectural/Engineering Services Agreement under our IDIQ Contract No. The 00-000-000. SCOPE OF WORK This life safety project scope of work includes the observation (SOW) consists of an abatement contractor cleaning up and testing abating asbestos containing materials (ACMs) on all four floors of the following construction materials: Concrete compressive strength specimen sampling1956 A-100 building (i.e., testingduct and piping insulation, and reportingfloor tiles). This proposal may serve building was essentially abandoned around 2000 when the Xx. Xxx Xxxxx Laboratory (DBGL) building was completed by the State of Texas. Many of the floors have experienced various issues such as RKCI’s work agreement for water damage. Ceiling tiles have been removed and/or have fallen out of the referenced projectceiling due to water damage and now lay on the floors. Please sign As a result of torn insulation, there are numerous exposed piping systems; there are trash and other abandoned items in various locations; and there are obvious animal wastes in locations where animals have managed to enter over the years. Xxxxxxx Consultants has coordinated a release of construction documents to assist the TFC in getting this proposalbuilding cleaned up with associated abatement while funding exists. However, initial every page of each attachment, fill out the Report Distribution List, and return one signed original there was not enough funding to our office as authorization for RKCI to provide these coordinate construction administration services. If you choose The following tasks are anticipated to issue your own purchase order or work agreementbe completed over an approximate twelve (12) month period. It is anticipated that the project will be contracted and completed by June 31st, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPac2023.

Appears in 1 contract

Samples: www.tfc.texas.gov

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXX, INC. [INSERT PSP NAME] By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx., P.E. Print Name: Executive Director Sr. Vice President and COO Print Title: Date signed: Date signed: Approved: Xxx Xxxxxxx Assistant General TFC Legal Counsel PM/Xxxxxxx Xxxxxxxx PM/ Dir/Xxxxx X. Xxxxx DED/X.X. Xxxx X. DocuSign Envelope ID: 51478B4F-29E9-4CD1-BDE1-29907D012B7E DocuSign Envelope ID: 51478B4F-29E9-4CD1-BDE1-29907D012B7E TEXAS FACILITIES COMMISSION | IDIQ for Professional Civil Engineering and Land/Utility Surveying Services | RFQ #000-0-00000 RESUMES AND ORGANIZATIONAL CHART FNI has assembled a team of highly-qualified professionals from each discipline described in the RFQ with experience in renovations of occupied and secured low-rise, mid-rise and high-rise buildings. All members of our project team have established experience with TFC projects. Texas Facilities Commission UTILITY IMPROVEMENTS Water and Wastewater - Xxxx TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3Xxxxxxx, 2023 Xx. Xxxxxxx Xxxxxxxx TFC 0000 PE Electrical - Xxxxxx Xxxxxxxxx, PE Gas - Xxxxx Xxxxxx, PE VALUE-ADDED SERVICES Architectural - Xxxxxx Xxxxx, AIA Environmental - Xxxxxx Xxxxxxxx, PG Geotechnical - Xxxx Xxxxxxxx, PE PROJECT MANAGER Xxxx Xxxxxx, PE PRINCIPAL-IN-CHARGE Xxxxx Xxxx, PE, LEED® AP BD+C SPECIALTY SUBCONSULTANTS DRAINAGE Xxx Xxxxxxx Xxxxxxx, PE, CFM, ENV SP CONSTRUCTION SERVICES Xxxx Xxxxxxx, LEED® AP STRUCTURAL ENGINEERING Prabin KC, PE CIVIL ENGINEERS Xxxxx Xxxx, PE Xxxxx Xxxxxxx, PE, LEED® AP PAVEMENT REPAIRS Xxxxxxxxx Xxxxxx, PE, CFM CIVIL TASK LEADER Xxxxxxx Xxxxxxxx, PE SERVICES TECHNICAL QA/QC Xxxxx 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus Xxxxxxx, PE, CCM SURVEYING SERVICES Gorrondona and Associates ACCESSIBLE ROUTE ANALYSIS AND CORRECTION Altura Solutions, LLC SUBSURFACE UTILITY ENGINEERING The Xxxx Group Choosing a Project Team P Right people Right place PRight availability We’ve put forth the advance-planning effort to verify we have the right team members, in the right place, with the right availability to meet client goals. Several factors influenced this choice, including individual experience and history of working together on N MoPac Dear Xxcommon projects. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Inc. (RKCI) is pleased to submit our proposal to provide the construction materials observation and testing services on the project referenced above. We propose an estimated budget Our chosen team combines decades of $1,428.90 for testing and observation services for the referenced projectexperience in a wide range of disciplines. This budget is based complementary blend of team member expertise in their various areas of specialization results in a solid, well-rounded team, which ultimately benefits the client. Beyond the proposed team, FNI has access to 950+ employees firmwide to assist, as necessary. As a firm focused on our understanding of client service, we will commit the projectresources required to get the job done. May 24, an estimate of quantities, 2021 1 DocuSign Envelope ID: 51478B4F-29E9-4CD1-BDE1-29907D012B7E DocuSign Envelope ID: 51478B4F-29E9-4CD1-BDE1-29907D012B7E DocuSign Envelope ID: 51478B4F-29E9-4CD1-BDE1-29907D012B7E Exhibit F Criminal Background Checks and past experience with similar projects. A cost estimate breakdown is presented Application Guidelines The Criminal Background Checks and Application Guidelines are located at this TFC Construction Contracts website link at 5E in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materialsPDF: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved Byxxxxx://xxx.xxx.xxxxx.xxx/divisions/facilities/prog/construct/formsindex/TEXAS%20FACIL ITIES%20COMMISSION%20CRIMINAL%20BACKGROUND%202016.pdf DocuSign Envelope ID: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH51478B4F-29E9-4CD1-BDE1-29907D012B7E DocuSign Envelope ID: am Attachments51478B4F-29E9-4CD1-BDE1-29907D012B7E DocuSign Envelope ID: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD2351478B4F-29E9-0514CD1-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project NameBDE1-29907D012B7E DocuSign Envelope ID: Camp Xxxxxxd CH6 concrete testing Project Location51478B4F-29E9-4CD1-BDE1-29907D012B7E DocuSign Envelope ID: Camp Xxxxxxd Campus on N MoPac Contact Name51478B4F-29E9-4CD1-BDE1-29907D012B7E DocuSign Envelope ID: Xxxxxxx Xxxxxxxx Client51478B4F-29E9-4CD1-BDE1-29907D012B7E DocuSign Envelope ID: TFC Address51478B4F-29E9-4CD1-BDE1-29907D012B7E DocuSign Envelope ID: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number51478B4F-29E9-4CD1-BDE1-29907D012B7E DocuSign Envelope ID: 000.000.0000 (O) 000.000.0000 (M) E Mail51478B4F-29E9-4CD1-BDE1-29907D012B7E DocuSign Envelope ID: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General51478B4F-29E9-4CD1-BDE1-29907D012B7E DocuSign Envelope ID: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPac51478B4F-29E9-4CD1-BDE1-29907D012B7E

Appears in 1 contract

Samples: Professional Engineering Services Agreement

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXXXXXXX DESIGN ASSOCIATES, INC. ., DBA XXXXXX DESIGN ASSOCIATES By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx., P.E. Xxxxx X. Xxxxxx Executive Director Sr. Vice President and COO Date signed: 05/30/2023 | 12:46 PM CDT Date signed: 05/30/2023 | 10:20 AM PDT Approved: Xxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx PM/ Xxxxx Xxxxxxxx Dir/Xxxxx Xxxxx DED/Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3Exhibit A PSP’s Proposal dated April 14, 2023 PAGES 4 14 April 2023 Xx. Xxxxxxx Xxxxx Xxxxxxxx TFC Sr. Project Manager Texas Facilities Commission Facilities Design & Construction 0000 Xxx Xxxxxxx Xxxxxxxxx XxxxxxXxxx. Austin, Xxxxx 00000 ReTX 78701 RE: Professional Architectural and Engineering Services related to DM Projects for Texas Facilities Commission DSHS Building DHF – Re‐Design for Shell Office Space Design and Construction Materials Testing Phase Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx State Health Services Campus on N MoPac Dear Xx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Inc. XXXXXX DESIGN ASSOCIATES (RKCICDA) is pleased to submit our proposal to provide the construction materials observation and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services for the referenced project. This budget is based on our understanding of the project, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI appreciates the opportunity to submit our this proposal to provide professional architectural and engineering services for the construction materials observation design of DSHS DHF for the Vital Statistics Services (VSS) offices. Our proposal has been developed to prepare the Architectural, Engineering and testing servicesFire Protection Design Documents and provide Construction Contract Administration Services for the re‐ design of DHSH Building F (DHF) to shell office space and complete previously identified deferred maintenance items. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during Our understanding of the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET project is as described in the Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacbelow.

Appears in 1 contract

Samples: Professional Services Agreement

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. [This Space Intentionally Left Blank] This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXXXXXXXX CONSULTANTS, INC. ______________________________ By: _ By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx., P.E. Executive Director Sr. Senior Vice President and COO Date signed: 07/19/2021 | 4:19 PM CDT Date signed: 07/19/2021 | 12:56 PM PDT Approved: Xxx Xxxxxxx Assistant General TFC Legal Counsel PM/Xxxxxxx Xxxxxxxx Dir/Xxxxx Xxxxx DED/Xxxx X. Xxxx PM Dir DED TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3Contract No. 00-000-000 - Assignment 11 - Exhibit A Proposal No. PAD18−108−00a June 18, 2023 Xx. Xxxxxxx Xxxxxxxx TFC 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx2021, Xxxxx 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Dear Xx. Xxxxxxxx: Revised AUTHORIZATION FORM 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX AS AN ADDITION TO THE FOLLOWING AGREEMENT: Project Name: DPS Bryan Foundation Remediation RKCI Proposal No. PAD18−108−00, dated August 1, 2018 Texas Facilities Commission Contract No. 18−101−000 dated September 25, 2017 WE HEREBY AUTHORIZE RKCI TO PERFORM THE FOLLOWING SERVICES: Perform collection of three cores, documentation of the thickness of cores and any voids that might exist beneath the concrete pavement on the west side of the facility. PROPOSED SCOPE FEE: $ 1,669.80 On the basis of verbal authorization from Texas Facilities Commission to Xxxx Xxxxxxx Consultants, Inc. (RKCI) is pleased to submit our proposal to provide on June 10, 2021, we are proceeding with the construction materials observation additional services outlined above. Our invoices are due and testing payable upon receipt at X.X. Xxx 000000, Xxxxxx, Xxxxx 00000−1037. All parties hereby agree that this contract upon acceptance will be performable in Bexar County, Texas. Our services on will be performed in accordance with this letter agreement and the project previously executed agreement referenced above. We propose an estimated budget of $1,428.90 for testing and observation services for the referenced project. This budget is based on our understanding of the projectPlease sign, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution Listdate, and return one signed original copy of this form to our office as provide written confirmation of your authorization for RKCI our firm to provide these servicescommence work on the specific services outlined herein. If you choose to issue your own purchase order or work agreementSIGNATURE: X DATE: PRINTED NAME: Xxx Xxxxxxxx COMPANY NAME: Texas Facilities Commission – Facilities Design & Construction COMPANY ADDRESS: 0000 Xxx Xxxxxxx Xxxx XXXX, please reference our proposal numberXXXXX, XXX: Xxxxxx, XX 00000 PHONE NUMBER: 512−463−3446 FAX NUMBER: N/A E-MAIL: Xxx.Xxxxxxxx@xxx.xxxxx.xxx XXXX XXXXXXX CONSULTANTS, INC. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional informationXxxxxxx Xxxxxxx, please call us at Xx., PE, PMP Senior Vice President & COO GO/JG Copies Submitted: Above (0001) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3Contract No. 00-000-000 - Assignment 11 - Exhibit A PAD18−108−00a 2 June 18, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 2021 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing DPS Bryan Foundation Remediation Project Location: Camp Xxxxxxd Campus on N MoPac 0000 X. Xxxx Xxxxxx Fwy, Bryan, Texas 77803 Contact Name: Xxxxxxx Xxx Xxxxxxxx Client: TFC Texas Facilities Commission - Facilities Design & Construction Address: 0000 Xxx Xxxxxxx Xxxxxxxxx CityXxxx Xxxx/State /Zip AustinXxxxx /Xxx Xxxxxx, TX 78701 XX 00000 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E 000-000-0000 E-Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx Xxx.Xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE ASPHALT Laboratory Testing Concrete Compressive Strength Cylinders Coring Rig $25.00 each 5 105.00 day 1 $125.00 105.00 Generator $110.00 day 1 $110.00 Core Bit Wear $2.50 in 18 $45.00 Field Testing/Observation Materials Technician − Two Man Crew $68.00 120.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 960.00 Vehicle Travel Charge (205 miles x .56) $35.00 114.80 trip 2 1 $70.00 114.80 Subtotal $739.00 1,334.80 PROJECT ADMINISTRATION Project Coordinator - Geotechnical Technician $95.00 75.00 hour 2 $190.00 150.00 Project Engineer $185.00 hour 2 1 $370.00 185.00 Clerical $75.00 hour 1 $75.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 335.00 GRAND TOTAL $1,428.90 1,669.80 DocuSign Envelope ID: D74BE076-2F47-4A18-80D9-D6DD9675C6AF TFC IDIQ C PAD23 050 00 March 3Contract No. 00-000-000 - Assignment 11 EXHIBIT B LIST OF PSP PROJECT MANAGER AND SUBCONSULTANTS (Name, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacAddress & Contact Person (Project Manager))

Appears in 1 contract

Samples: Professional Services Agreement

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXX, INC. [INSERT PSP NAME] By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx., P.E. Print Name: Executive Director Sr. Vice President and COO Print Title: Date signed: Date signed: Approved: Xxx Xxxxxxx Assistant General TFC Legal Counsel PM/Xxxxxxx Xxxxxxxx PM/ Dir/Xxxxx X. Xxxxx DED/X.X. Xxxx X. DocuSign Envelope ID: D43017EF-ADF0-4C01-A247-01B3480B7EC2 DocuSign Envelope ID: D43017EF-ADF0-4C01-A247-01B3480B7EC2 PACKAGE 3 Resumes & Organizational Chart Principal-In-Charge & QA/QC (BMB) Xxxx TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3, 2023 Xx. Xxxxxxx Xxxxxxxx TFC 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Dear Xx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 PE Engineering Project Manager (BMB) Xxxxxx Xxxxxxxxx, PE, SIT, CFM Surveying Project Manager (BMB) Xxxxxxxx Xxxxx, RPLS Structural Engineer (BMB) Xxxx-Xxxxxxx-Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX Engineering Support (BMB) Xxxxxxx Xxxxxx, PE Xxxxxx Xxxxxx, PE Survey Support 1 - Chief of Parties 3 - Survey Crews 3 - Survey Technicians XXX Engineering Lead (LAMB-STAR) Dakota Xxxxx, XX TEXAS FACILITIES COMMISSION RFQ FOR IDIQ FOR PROFESSIONAL CIVIL ENGINEERING AND LAND/UTILITY SURVEYING SERVICES XXXX XXXXXXX Consultants, Inc. (RKCI) is pleased to submit our proposal to provide the construction materials observation and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services for the referenced project. This budget is based on our understanding of the project, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTSXXXXXX XXXX, INC. Approved ByPage 34 DocuSign Envelope ID: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AHD43017EF-ADF0-4C01-A247-01B3480B7EC2 DocuSign Envelope ID: am AttachmentsD43017EF-ADF0-4C01-A247-01B3480B7EC2 DocuSign Envelope ID: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23D43017EF-051ADF0-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name4C01-A247-01B3480B7EC2 DocuSign Envelope ID: Camp Xxxxxxd CH6 concrete testing Project LocationD43017EF-ADF0-4C01-A247-01B3480B7EC2 DocuSign Envelope ID: Camp Xxxxxxd Campus on N MoPac Contact NameD43017EF-ADF0-4C01-A247-01B3480B7EC2 DocuSign Envelope ID: Xxxxxxx Xxxxxxxx ClientD43017EF-ADF0-4C01-A247-01B3480B7EC2 DocuSign Envelope ID: TFC AddressD43017EF-ADF0-4C01-A247-01B3480B7EC2 DocuSign Envelope ID: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone NumberD43017EF-ADF0-4C01-A247-01B3480B7EC2 DocuSign Envelope ID: 000.000.0000 (O) 000.000.0000 (M) E MailD43017EF-ADF0-4C01-A247-01B3480B7EC2 DocuSign Envelope ID: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 GeneralD43017EF-ADF0-4C01-A247-01B3480B7EC2 DocuSign Envelope ID: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacD43017EF-ADF0-4C01-A247-01B3480B7EC2 DocuSign Envelope ID: D43017EF-ADF0-4C01-A247-01B3480B7EC2 DocuSign Envelope ID: D43017EF-ADF0-4C01-A247-01B3480B7EC2 DocuSign Envelope ID: D43017EF-ADF0-4C01-A247-01B3480B7EC2

Appears in 1 contract

Samples: Professional Engineering Services Agreement

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXXXXXXX PARKING CONSULTANTS/ENGINEERS, INC. By: By: Xxxx Xxxxx Xxxxxxx XxxxxxxX. Xxxxxxxxxx Executive Director Principal & Director of Restoration Date of execution: 04/14/2020 | 12:05 PM CDDTate of execution: 04/14/2020 | 9:47 AM PDT GC Dir DED EXHIBIT A-5 PSP’S IDIQ ASSIGNMENT NO. 5 PROPOSAL, XxREVISED DATE APRIL 13, 2020 4 TFC Contract No. 00-000-000 Exh 00000 Xxxxxxxx Xxxx., P.E. Executive Director Sr. Vice President and COO Date signed: Date signed: Approved: Xxxxx 000 Xxxxxx, Xxxxx 00000 281.280.0068 xxxxxxxxxxxxxxxxx.xxx March 20, 2020 Xxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx Xxxxxxxx Dir/Xxxxx Xxxxx DED/Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3, 2023 Xx. Xxxxxxx Xxxxxxxx TFC Project Manager Facilities Design & Construction Texas Facilities Commission 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Proposal for Xxxxxx X. Xxxxxxxx Building Broker Price Opinion of Value 000 Xxxxxxxx Xx. Xxxxxx, Xxxxx 00000 Dear Xx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx Consultants (Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Inc. (RKCI) is pleased to submit our for your review this proposal to provide the construction materials observation and testing services on the project referenced above. We propose an estimated budget for providing a Broker Price Opinion of $1,428.90 for testing and observation services Value (BPO) for the referenced projectXxxxxx X. Xxxxxxxx Building located in Austin, Texas. This budget is based on our proposal provides an understanding of the project, an estimate of quantitiesobjectives, and past experience description of the proposed scope of services, schedule, and fee PROJECT UNDERSTANDING The Xxxxxx X. Xxxxxxxx Building is an office building located at 000 Xxxxxxxx Xxxxxx in Austin, Texas. The building was constructed circa 1940 and has had additions made to the building since that time. The building is approximately 136 feet tall with similar projectseleven above-grade levels and one below-grade (basement) level. A cost estimate breakdown The building is presented in clad with granite and limestone panels at Levels 1 and 2, and brick masonry cladding at Levels 2 through 11. The original punched window openings were reportedly operable at the attached spreadsheettime of construction and consist of single- pane glass. Construction sequencingHowever, delaysthe windows were sealed, and the number property management prefers the future repair to maintain the windows in a non-operable state. There are four roofs over occupied space and a south loading dock canopy with a ballast built up roof system on this building. One small roof is located above Level 2 along the south elevation, the other three roofs are located at the main roof above Xxxxx 00, Xxxxx 00 and at the top of times that the client or their representative requests our services will affect penthouse. According to the suggested budget. Services will be provided on a call out basis for on-site property managers, the cost estimate spreadsheet attached to this proposalbelow-grade basement level water intrusion condition was improved after previous storm drain cleaning and repair. The scope structural system consists of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen samplingcast-in- place (CIP) concrete columns, testingpan-joist floors, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacfoundations.

Appears in 1 contract

Samples: www.tfc.texas.gov

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXX, INC. [INSERT PSP NAME] By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx., P.E. Print Name: Executive Director Sr. Vice President and COO Print Title: Date signed: Date signed: Approved: Xxx Xxxxxxx Assistant General TFC Legal Counsel PM/Xxxxxxx Xxxxxxxx PM/ Dir/Xxxxx X. Xxxxx DED/X.X. Xxxx X. DocuSign Envelope ID: 0B7883E4-EA1A-4100-A06A-DA70E3C6C5FA Package 3 - Scored Material DocuSign Envelope ID: 0B7883E4-EA1A-4100-A06A-DA70E3C6C5FA XXXXX SUMMARY OF PRACTICE HISTORY Contract Principal Xxxx TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3Xxxxxxxxxxxx, 2023 Xx. Xxxxxxx Xxxxxxxx TFC 0000 Xxx Xxxxxxx Xxxxxxxxx XxxxxxX.X. xxxxxxxxxxxxx@xxxxxxxx.xxx Austin, Xxxxx 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Dear Xx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Inc. (RKCI) is pleased to submit our proposal to provide the construction materials observation and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services for the referenced project. This budget is based on our understanding of the project, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Texas Geotechnical Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3Xxx Xxxxx, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Ph.D, X.X. xxxxxx@xxxxxxxx.xxx Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Texas CMT Project Coordinator $95.00 hour 2 $190.00 Manager Xxxx Xxxxxxxxxxxx, X.X. xxxxxxxxxxxxx@xxxxxxxx.xxx Austin, Texas Sr. Geotechnical Support Xxxxxxx Xxxxx, X.X. xxxxxx@xxxxxxxx.xxx San Antonio, Texas CMT Asst. Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacManager

Appears in 1 contract

Samples: Professional Engineering Services Agreement

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXWOOD ENVIRONMENT & INFRASTRUCTURE SOLUCTIONS, INC. ___________________________ By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx., P.E. Xxxxx Xxxxxx Executive Director SrIndustrial Hygienist Date of execution: 03/03/2021 | 9:57 AM CST Date of execution: 03/03/2021 | 9:23 AM CST PM DGC Dir DED EXHIBIT A DocuSign Envelope ID: 4FD7D546-6844-4F0D-A195-2A8B0F030817 February 9, 2017 Xx. Vice President and COO Date signedXxx Xxxxxxxx, PMP, CTCM Project Manager Facilities Design & Construction Texas Facilities Commission Subject: Date signed: Approved: Xxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx Xxxxxxxx Dir/Xxxxx Xxxxx DED/Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March Proposal for Abatement Consulting Services LBJ Building Floors 2, 3, 2023 Xx. Xxxxxxx Xxxxxxxx TFC 0000 Xxx Xxxxxxx Xxxxxxxxx 6 and 11 000 Xxxx 00xx Xxxxxx, Xxxxxx, Xxxxx 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Wood Proposal No. 670620AU15.03 Dear Xx. Xxxxxxxx: Xxxx Environment & Infrastructure Solutions, Inc. 0000 X. Xxxxxxx Xxxxxx Xxxxx Xxx, Xxx 000 Xxxxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX ConsultantsT: 512-795-0360 xxx.xxxxxxx.xxx Wood Environment & Infrastructure Solutions, Inc. (RKCIWood) is pleased appreciates the opportunity to submit present our proposal to the Texas Facilities Commission (TFC) to provide asbestos abatement consulting services prior to upcoming renovations at the Xxxxxx X. Xxxxxxx (LBJ) Building, Floors 2, 3, 6 and 11. This proposal presents our approach to providing asbestos design and monitoring services, using our multi-disciplinary capabilities and knowledge of asbestos abatements. The following sections present our Scope of Work, Schedule, and Fee Estimate. Scope of Work Wood performed an asbestos survey of Floors 2, 3, 6, 11 and Suite 124, and results are included in our report titled Report of Pre-Renovation Asbestos Survey, and dated January 21, 2021. No asbestos was detected in any of the suspect materials sampled in Suite 124. It was determined that the following building materials expected to be disturbed during the upcoming renovation project are asbestos- containing materials: • Floor 2 – Approximately 15,000 SF of drywall construction; • Floor 2 – Approximately 200 LF of pipe insulation mastic; • Floor 3 – Approximately 15,000 SF of drywall construction; • Floor 3 – Approximately 200 LF of pipe insulation mastic; • Floor 6 – Approximately 15,000 SF of drywall construction; • Floor 11 – Approximately 15,000 SF of drywall construction; and • Floor 11 – Approximately 18,000 SF of floor tile and associated mastic. Based on results of our asbestos survey, we will prepare abatement specifications as required by the Texas Department of State Health Services (TDSHS). The abatement activities will be limited to the areas determined to contain asbestos-containing building materials as determined by our survey. We will attend one abatement preconstruction meeting, and coordinate the removal operations and scheduling with the TFC and abatement personnel. During abatement, we will have a Texas licensed asbestos project manager/air monitoring technician on-site at all times the abatement contractor is performing removal operations in order to observe and document on-site conditions as required by state 'Wood' is a trading name for Xxxx Xxxx Group PLC and its subsidiaries DocuSign Envelope ID: 4FD7D546-6844-4F0D-A195-2A8B0F030817 Proposal for Asbestos Consulting Services Wood Proposal No.: 670620AU15.03 LBJ Building, Floors 2, 3, 6 and 11 February 9, 2021 law. Our on-site licensed project manager/air monitoring technician will collect ambient air samples during abatement for in-house analysis utilizing phase contrast microscopy (PCM) techniques and provide visual clearance after completion of the removal. Close-out documentation submitted to TFC will include a written report detailing the scope of work, materials abated, conditions observed, procedures used, air sample results, identification of certified abatement and monitoring personnel, and documentation of waste disposal. Schedule and Fee Information Upon notice to proceed from the TFC, Wood will proceed with the asbestos abatement design. Wood will provide the construction materials observation and testing services design specifications to TFC within two weeks of NTP. Notification to DSHS requires a ten (10) working day period before any disturbance of ACMs may occur. TFC will be responsible for payment of required notification fees to the DSHS. Based on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services for the referenced project. This budget is based on our understanding of the projecttype, an estimate of quantitiesquantity, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delayslocations of material anticipated for removal, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation availability and testing efficiency of the following construction materialsabatement contractor, asbestos abatement is expected to take: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement • Fifteen (15) 10-hour workdays for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization Floor 2; • Fifteen (15) 10-hour workdays for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you Floor 3; • Fifteen (15) 10-hour workdays for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacFloor 6; and

Appears in 1 contract

Samples: www.tfc.texas.gov

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXSURVEYING & MAPPING, INC. LLC By: By: Xxxx Xxxxx Xxxxxxx XxxxxxxX. Xxxxx, Xx., P.E. RPLS Executive Director Sr. Principal/Executive Vice President and COO Date signed: 08/09/2023 | 1:46 PM CDT Date signed: 08/09/2023 | 1:37 PM CDT Approved: Xxx Xxxxxxx Xxxxxxx/kgf Assistant General Counsel PM/Xxxxxxx Xxxxxxxx Xxxx Xxxxx Dir/Xxxxx Xxxxx Dir for DED/Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3EXHIBIT A PSP Proposal (Revised) Dated July 27, 2023 Xx. Xxxxxxx Xxxxxxxx TFC (7 Pages) DocuSign Envelope ID: 2361A67F-23DD-47F9-BOBC-912652OA2O8C Via Email: Xxxx.Xxxxx@xxx.xxxxx.xxx Revised July 27, 2023 May 2, 2023 Texas Facilities Commission 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Dear Xx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxx Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX ConsultantsAttn: Xxxx Xxxxx, Inc. (RKCI) is pleased to submit our proposal to provide the construction materials observation and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services for the referenced project. This budget is based on our understanding of the project, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AHRe: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacGarland Parking Lot Replacement

Appears in 1 contract

Samples: Professional Services Agreement

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXXXXXXX X. XXXXX, INC. By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx., P.E. Xxxx Xxxxxx Executive Director Sr. Vice President and COO Principal Date signed: 07/24/2023 | 11:02 AM CDT Date signed: 07/24/2023 | 10:04 AM CDT Approved: Xxx Xxxxxxx Xxxxxxx/mvb Assistant General Counsel PM/Xxxxxxx Xxxxxxxx Xxxxx Xxxxx Dir/Xxxxx Xxxxx Xxxxxxxxx DED/Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 Contract No. 00-000-000 Xxxxxx X. Xxxxx, Inc. Assignment No. 1 Project No. (Req.) 000-0-00000 EXHIBIT A Proposal March 39, 2023 Xx. Xxxxxxx Xxxxxxxx TFC Mr. Xxxxx Xxxxx, AIA, CTCM, LEED AP Manager of A/E Design Services Facilities Design & Construction Texas Facilities Commission 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Dear Xx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxx Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX ConsultantsRe: Proposal for Professional Services State Records Center Structural Foundation Movement Assessment 0000 Xxxxx Xxxxx Xxxxxxxxx, Inc. (RKCI) Xxxxxx, XX Xxxxxx X Xxxxx Proposal No. 23-0755 Dear Xxxxx: Xxxxxx X Xxxxx is pleased to submit our this proposal to provide the construction materials observation and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation professional services for the referenced project. This budget proposal is presented in order to establish a basis for the commencement of our scope of services for the Project. We anticipate that this Proposal and Agreement for Professional Services and attachments, when signed, will serve as our entire Agreement unless superseded by another document signed by both parties. Basis of Proposal This proposal is based on our understanding of the projecton-site pre-proposal walkthrough on February 10, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPac2023.

Appears in 1 contract

Samples: www.tfc.texas.gov

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to signMay 17, 2021. TEXAS FACILITIES COMMISSION XXXX XXXXXXXMEP ENGINEERING, INC. ________________________ B By: Byy: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx.Xxxxxx X. Xxxxx, P.E. Executive Director Sr. Vice President and COO Principal Date signed: 07/14/2021 | 9:54 AM CDT Date signed: 07/14/2021 | 5:07 AM CDT Approved: Xxx Xxxxxxx Assistant Xxxxxx X. Xxxxxx Deputy General Counsel PM/DS Dir/MW DED/JSR DocuSign Envelope ID: 171BBBAF-7B4F-48BB-A38A-17554A568810 April 29, 2021 (Revised May 14, 2021) Xxxxxxx Xxxxxxxx Dir/Xxxxx Xxxxx DED/Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3Senior Project Manager Texas Facilities Commission Facilities, 2023 Xx. Xxxxxxx Xxxxxxxx TFC Design & Construction 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx 00000 Re: Construction Materials Testing Proposal for HVAC & Plumbing Commissioning Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac at TFC 20-21DM TSBVI Dear Xx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX ConsultantsMEP Engineering, Inc. (RKCI) is pleased to submit our proposal to provide the construction materials observation and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services for the referenced project. This budget is based on our understanding of the project, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI appreciates the opportunity to submit our this proposal for Commissioning of HVAC and Plumbing Systems on the construction materials observation above referenced project. It is MEP’s understanding that the terms and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction conditions of this project. If you have any questions concerning our proposal or need any additional informationproject assignment agreement will be defined by the current Indefinite Delivery/Indefinite Quantity Professional Services Agreement between MEP Engineering, please call us at Inc. and TFC (Contract #18-093-000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPac).

Appears in 1 contract

Samples: www.tfc.texas.gov

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXWOOD ENVIRONMENT & INFRASTRUCTURE SOLUTIONS, INC. By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx., P.E. Xxxxxxxx High Executive Director Sr. Vice President and COO Texas Office Manager 03/10/2022 | 12:21 PM CST Date signed: Date signed: 03/10/2022 | 10:13 AM CST Approved: Xxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx Xxxxxxxx Xxxxx Dir/Xxxxx Xxxxx DED/Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3February 8, 2023 2022 Xx. Xxxxxxx Xxxxxxxx TFC Xxxxx Project Manager Texas Facilities Commission Facilities Design & Construction Subject: Proposal for Environmental Consulting Services Wood Environment & Infrastructure Solutions, Inc. 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx Xxxxx, Xxxxx 000 Xxxxxx, Xxxxx 00000 ReT: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac 000-000-0000 xxx.xxxxxxx.xxx Texas Department of Public Safety Capitol Region District Office 0000 X Xxxxxxxx Xxx, Xxxxxx, Xxxxx 00000 Capitol Complex Childcare Facilities 1505 and 0000 Xxxxxx Xxxxxx, Xxxxxx, Xxxxx 00000 Wood Proposal No. 670622AU02.01 Dear Xx. XxxxxxxxXxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX ConsultantsXxxx Environment & Infrastructure Solutions, Inc. (RKCIWood) is pleased appreciates the opportunity to submit present our proposal to the Texas Facilities Commission (TFC) to provide the construction materials observation environmental consulting services prior to upcoming demolition of three (3) Capitol Complex Buildings: • Texas Department of Public Safety Capitol Region District Office located at 0000 X Xxxxxxxx Xxx; • Capitol Complex Child Care Center located at 0000 Xxxxxx Xxxxxx; and testing services on the project referenced above. We propose an estimated budget • University of $1,428.90 for testing and observation services for the referenced projectTexas Child Development Center located at 0000 Xxxxxx Xxxxxx. This budget is based on proposal presents our understanding approach to providing regulated materials survey, asbestos design and monitoring services using our multi-disciplinary capabilities and knowledge of these services. In addition, we are including environmental consulting services related to underground storage tanks (USTs) at the projectUT Child Development Center located at 0000 Xxxxxx Xxxxxx, an estimate Xxxxxx, Xxxxx 00000. The following sections present our Scope of quantitiesWork, Schedule, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposalFee Estimate. The scope of work includes services will be performed in accordance with the observation terms and testing of conditions outlined in the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work professional services agreement, please reference our proposal number. Thank you for allowing RKCI TFC Contract 00-000-000, between the opportunity to submit our proposal for the construction materials observation Texas Facilities Commission and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional informationWood Environment & Infrastructure Solutions, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacInc.

Appears in 1 contract

Samples: www.tfc.texas.gov

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXMCKINNEY ARCHITECTS, INC. ., DBA XXXXXXXX YORK ARCHITECTS By: By: Xxxx Xxxxx Xxxxxxx XxxxxxxXxxxxxxx Xxxxxxxxxx, Xx.AIO, P.E. RID Executive Director Sr. Vice President and COO Date signed: 05/27/2022 | 1:53 PM CDT 05/27/2022 | 1:14 PM CDT Date signed: Approved: Xxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx Xxxxxxxx Xxxx Xxxx Dir/Xxxxx Xxxxx DED/Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3April 22, 2023 Xx. Xxxxxxx Xxxxxxxx TFC 2022 April 29, 2022 revised Xxxx Xxxx, RA, NCARB, CTCM Project Manager Facilities Design & Construction Texas Facilities Commission 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Dear XxXxxx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Inc. Mobile: (RKCI000)000-0000 xxxx.xxxx@xxx.xxxxx.xx.xx RE: Proposal for Professional Services INDEFINITE DELIVERY INDEFINITE QUANTITY PROFESSIONAL SERVICES AGREEMENT CONTRACT NO. 00-000-000 ASSIGNMENT NO. 02 Dear Xx. Xxxx: XxXxxxxx York Architects (MYA) is pleased to submit our provide this proposal to provide for Professional AE Services for the construction materials observation and testing services Texas Facilities Commission (TFC) North Austin Complex Phase II, Third Party Review of Prime Professional AE Contract Document Deliverables (the PROJECT). The North Austin Complex Phase II consists of a six (6) level office building, totaling 302,000 gross square feet located on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services for the referenced project. This budget is based on our understanding west side of the projectXxxx X. Xxxxxxx campus, an estimate a multi-level above grade parking structure accommodating 200 parking spaces located on the east side of quantitiesthe Xxxx X. Xxxxxxx campus, and past experience with similar projects. A cost estimate breakdown is presented connection to the existing central utility plant located in the attached spreadsheetgarage of Phase I and expansion of plant equipment for Phase II. Construction sequencingIt is understood that the purpose of the review is to address completeness, delayscoordination, and constructability of the number AE documents provided. Design of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis buildings and systems for the cost estimate spreadsheet attached to this proposal. The scope of work includes are the observation responsibility of the Prime Professional AE and testing not a consideration of this third party review. Owner will provide BIM/Revit model and drawings as well as printed milestone sets if requested. Project Manual and Specification books shall be provided in Microsoft Word or other editable file format. Sub-Consultants to be Utilized for Project: Xxxx Xxxxxxx – Civil Engineers Xxxxxx X. Xxxxx – Structural Engineers TG&W Engineers Inc – Mechanical, Electrical, Plumbing Engineers (HUB) Xxxx Fire Protection Engineers – Fire Sprinkler/Fire Alarm Engineers (HUB) Scope of Work The Third Party Review (the PROJECT) scope includes: • Review, Coordination and Constructability and Code Compliance review of the following construction materialsdisciplines: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page o General/Project Management – Coordination of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at Consultant Disciplines (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DBConflict Resolution/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacClash Detection excluded)

Appears in 1 contract

Samples: Professional Services Agreement

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXX, INC. XXXXXXXX By: By: Xxxx Xxxxx Xxxxx X. Xxxxxxx Xxxxxxx, Xx., P.E. Executive Director Sr. Vice President and COO Principal in Charge Date signed: 11/03/2021 | 11:14 AM CDT Date signed: 11/03/2021 | 11:02 AM CDT Approved: Xxx Xxxxxxx Assistant General TFC Legal Counsel PM/Xxxxxxx Xxxxxxxx Xxxx Xxxxxx Dir/Xxxxx Xxxxx DED/Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3November 1, 2023 2021 Xx. Xxxxxxx Xxxxxxxx TFC Xxxx Xxxxxx, MBA, CPS, CTCM Project Manager Texas Facilities Commission Facilities Design & Construction 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Dear XxXxxx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX ConsultantsRe: Proposal for Workforce Strategy and Professional Services for Texas Commission on Environmental Quality at the Xxxxx Xxxxxxx State Office Building in Houston, Inc. (RKCI) TX. Dear Xx. Xxxxxx: Xxxxxxxx is pleased to submit our proposal have the opportunity to provide Discovery, Workforce Strategy and Pre-Design services to the construction materials observation Texas Facilities Commission (TFC) for a planned renovation at Xxxxx Xxxxxxx State Office Building. This proposal includes performing discovery, workplace strategy evaluation, and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation predesign services for the referenced project1st and 3rd floor as discussed on April 28, 2021. This budget Scope of Work is based understood to be: ⏐ Consult with staff of TFC and with designated Texas Commission on our understanding of the projectEnvironmental Quality representatives to become familiar with Project analysis and Design program, an estimate of quantitiesconfirm values, goals, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delaysobjectives for Project, and the number of times that the client or their representative requests our services will affect the suggested overall schedule and budget. Services will ⏐ Become generally familiar with existing conditions for interior architecture, accessibility, HVAC, electrical, fire protection, and life safety features of existing buildings. Perform an evaluation of building infrastructure systems to assist in planning and budgeting for potential system expansion or replacement. ⏐ Assist TCEQ with exploring designated use, collaborative use, and flexible workspaces to ensure productive and efficient use of available state-owned building. ⏐ Ensure that design, including updated modular furniture, supports TCEQ’s core mission functions to conduct field investigations, including equipment preparation, calibration, storage, and preparing for daily use of sampling and monitoring equipment, as well as emergency and disaster response activities. ⏐ Work with TCEQ to identify essential operations that must be provided on a call out basis conducted on-site, assess adjacency, communication, and technology requirements, and optimize space available for the cost estimate spreadsheet attached those needs. ⏐ Assist TCEQ with assessing and programming for customer services requirements, such as access to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen samplingpublic records, occupational licensing testing, and reportingsimilar activities. This proposal may serve as RKCI’s work agreement ⏐ Work with TCEQ to incorporate strategies for future growth in the referenced projectagency’s mission functions and employees (FTEs). Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List⏐ Ensure that programming incorporates TFC and TCEQ’s safety and security protocols, and return one signed original to our office as authorization for RKCI to provide these servicesapplicable building code safety standards. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope Xxxxxxxx will categorize above scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacinto deliverable tasks as shown below.

Appears in 1 contract

Samples: www.tfc.texas.gov

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXXXXXXXXX, XXXXX & XXXXXX, INC. ., DBA XXXXXXXX By: By: Xxxx Xxxxx Xxxxx X. Xxxxxxx Xxxxxxx, Xx., P.E. Executive Director Sr. Vice President and COO Principal in Charge Date signed: 07/05/2022 | 9:37 AM CDT Date signed: 07/05/2022 | 8:54 AM CDT Approved: Xxx Xxxxxxx Assistant X. Xxxxxx General Counsel PM/Xxxxxxx Xxxxxxxx Xxxx Xxxxx Dir/Xxxxx Xxxxx DED/Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March February 3, 2023 2022 Xx. Xxxxxxx Xxxxxxxx TFC Xxxx Xxxxx Project Manager Texas Facilities Commission 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxx. Xxxxxx, Xxxxx 00000 Re: Proposal for Bidding/Award Assistance, Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Observation, and Warranty Closeout Support for the DPS HQ Crime Lab Training Facilities (TFC Project 22-013-2513) Dear Xx. XxxxxxxxXxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Inc. Xxxxxxxx (RKCIA/E) is pleased to submit our proposal have the opportunity to provide additional Architectural, Interior Design and Engineering services to the construction materials observation and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services Texas Facilities Commission (TFC) for the referenced projectDepartment of Public Safety (DPS) at 0000 X. Xxxxx Blvd. Austin, Texas for the HQ Crime Lab Training Facilities to be located at Building B (Project). This budget is based on our understanding of the projectProposal includes bidding/award assistance, an estimate of quantitiesconstruction observation, and past experience with similar projectswarranty/closeout support. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our Xxxxxxxx understands these services will affect the suggested budget. Services will be provided on a call out basis for under an IDIQ Contract 00- 000-000. Basic Services We understand the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Basic Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacyou require to be:

Appears in 1 contract

Samples: Services Agreement

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXTAB TECHNOLOGIES, INC. LLC By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx., P.E. Xxxxx See Executive Director Sr. Vice President and COO Date signed: 11/19/2021 | 10:07 AM CST Date signed: 11/19/2021 | 8:04 AM PST Approved: Xxx Xxxxxxx Assistant General Legal Counsel PM/Xxxxxxx X. Xxxxxxxx Dir/Xxxxx X. Xxxxx DED/Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail toExhibit A PSP’s Proposal DocuSign Envelope ID: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 33C267FF2-E453-4312-BA48-97B2F424CCC9 October 13, 2023 Xx. Xxxxxxx Xxxxxxxx TFC 2021 Texas Facilities Commission 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Dear XxXxxx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX ConsultantsATTN: Xxxxxxx Xxxxxxxx RE: TFC Project #00-000-000 DM 20-21 TSBVI Xxxxxxx, Inc. (RKCI) is We are pleased to submit our proposal to provide quote the construction materials observation testing, adjusting and testing services balancing (TAB) of the HVAC systems on the referenced project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services for the referenced project. This budget is based on our understanding total net sum of: $99,029.00 (Ninety Nine Thousand Twenty Nine Dollars 0/00 US less tax) CLARIFICATIONS:  All TAB activities will be performed in accordance with the current edition of the projectNational Environmental Balancing Bureau (NEBB) Procedural Standards.  We’ve included all work to be performed on a straight time basis (M-F, an estimate of quantities7am -4pm).  The TAB scope is per contract drawings dated 7/12/21, specification 23 09 23 dated July 2021 and past experience with similar projects. A cost estimate breakdown is presented includes the pre-audit/final TAB scope per Xxxxxxxx’x recommendations in the attached spreadsheet. Construction sequencing, delays, and email from 9/8/21 aside from the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposalexclusions listed. The scope will include: o Pre-audit of work includes (32) Aaon RTUs o Final TAB of (33) RTUs including alternate #1 rebalance of diffusers serving Gymnasium 143 per M2-109, (28) Ducted Heat Pump Split Systems, (14) Cassette Split Systems including adjustment of outside air as shown in the observation equipment schedule, (6) Exhaust Fans o Downstream TAB of diffusers has only been included where design CFM values are shown in alternate #1 M2-109. Total airflows for systems will be balanced per the scheduled CFM values. EXCLUSIONS:  Overtime & afterhours  Commissioning  Exclude dorms 650 – 657, 661, 663, bldg. 660 and testing of bldg. 611 split system units from the following construction materials: Concrete compressive strength specimen samplingpre-audit scope (30 horizontal/vertical units, testing, and reporting2 wall mounted splits). Our assumption with this exclusion is that the replacement units are a like-for-like replacement.  Exclude wall mounted split systems from the final TAB (21 total). This proposal may serve is typically a verification of operation since there’s no adjustment. Between the installer and commissioning agent, these should be verified as RKCI’s work agreement for the referenced projectoperating as intended. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. DocuSign Envelope ID: 3C267FF2-E453-4312-BA48-97B2F424CCC9 If you have any questions concerning our proposal or need any additional informationquestions, please call us at don’t hesitate to call. Respectfully submitted, TAB TECHNOLOGIES Xxxxx Xxxxx cc: XX 00-000 XxxxXxxx Xxxxxxxx ID: 2A004586-20AC-41A5-A7D3-F98D9284FF5A Exhibit B List of PSP Project Manager and Subcontractors DocuSign Envelope ID: 3C267FF2-E453-4312-BA48-97B2F424CCC9 DocuSign Envelope ID: 2A004586-20AC-41A5-A7D3-F98D9284FF5A LIST OF PSP PROJECT MANAGER AND SUBCONTRACTORS (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3Name, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Address & Contact Person (Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacManager))

Appears in 1 contract

Samples: Quantity Professional Services Agreement

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXTERRACON CONSULTANTS, INC. By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx.Xxxxx Xxxxxxxxxxx, P.E. Executive Director Sr. Vice President Date of execution: 05/26/2020 | 12:01 PM CDT Date of execution: 05/26/2020 | 11:59 AM CDT GC Dir DED EXHIBIT A-6 TFC Contract No. 00-000-000 Terracon Consultants, Inc. Assignment No. 6 Project No. 00-000-0000 PSP’S IDIQ ASSIGNMENT NO. 6 TERRACON PROPOSAL NO. P88205068A DATED APRIL 27, 2020 April 27, 2020 Texas Facilities Commission - Facilities Design and COO Date signed: Date signed: Approved: Xxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx Xxxxxxxx Dir/Xxxxx Xxxxx DED/Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3, 2023 Xx. Xxxxxxx Xxxxxxxx TFC Construction 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx 00000 Attn: Xx. Xxxxx Xxxxxxxxxx, AIA, CTCM P: (000) 000 0000 E: Xxxxx.xxxxxxxxxx@xxx.xxxxx.xx.xx Re: Construction Materials Testing Proposal for Geotechnical Engineering Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac DPS Joint Tactical Training Center (JTTC) 0000-0000 Xxxxxxxxx Xxxxxxxxx Xxxxxxxxxxx, Xxxxx Terracon Proposal No. P88205068A Dear Xx. XxxxxxxxXxxxxxxxxx: 0000 We appreciate the opportunity to submit this proposal to Texas Facilities Commission - Facilities Design and Construction (TFC) to provide Geotechnical Engineering services for the above referenced publicly-funded project. The following are exhibits to the attached Agreement for Services. Exhibit A Project Understanding Exhibit B Scope of Services Exhibit C Compensation and Project Schedule Exhibit D Anticipated Exploration Plan Exhibit E Detailed Breakdown of the Work Phases Exhibit F List of Contractor Project Manager and Subcontractors This proposal may be accepted by executing a signed Purchase Order / Work Order and returning the executive copy to Terracon. The Scope of Work proposed in this proposal and the Proposal for Services and accompanying limitations agreed to in the Indefinite Quantity Professional Services Agreement (TFC Contract No. 00-000-000 / RFQ No. 303-7-01593) shall constitute the exclusive services to be performed for this project. Sincerely, Terracon Consultants, Inc. (Texas Firm Registration No.: F-3272) Xxxxxx Xxxxx Senior Project Manager Xxxxxxx X. Xxxx, P.E., X.XX., F. ASCE Principal Terracon Consultants, Inc. 0000 Xxx Xxxxxx Xxxxx X-000 XxxxxxXxxxx, XX 00000 P 512.339.1745 [956] 283 8254 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Inc. (RKCI) is pleased to submit our proposal to provide the construction materials observation and testing services on the project referenced above[956] 283 8279 terracon. We propose an estimated budget com EXHIBIT A - PROJECT UNDERSTANDING Our Scope of $1,428.90 for testing and observation services for the referenced project. This budget Services is based on our understanding of the project, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, project as described by TFC and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve expected subsurface conditions as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing servicesdescribed below. We have not visited the project site to confirm the information provided. Aspects of the project, undefined or assumed, are highlighted as shown below. We request the design team verify all information prior to our initiation of field exploration activities. Site Location and Anticipated Conditions Item Description Parcel Information The project is located at 8115-8401 Southmost Boulevard in Brownsville, Texas. Approx. GPS coordinates: Latitude: 25.868356° N Longitude: 97.411377° W. (See Exhibit D) Existing Improvements The site is mostly undeveloped land. There is however, a fully equipped AASHTO Accredited laboratory shooting range at the southwest portion of the property currently used by the City of Brownsville Police department (BPD). Current Ground Cover The site is grassy but there are quite a few trees there as well. Existing Topography Relatively flat and we look forward to providing these services to you during level. Site Access We expect the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Reviewsite, and Report Distribution 10% all exploration locations, are accessible with our truck- mounted drilling equipment. Expected Subsurface Conditions Based on the Geologic Atlas of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3Texas, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus McAllen - Brownsville prepared by The University of Texas, the site is located on N MoPacthe Alluvium Formation of the Holocene (Recent) Period of the Quaternary Age. Floodplain deposits, lower course of Rio Grande, are divided into areas dominantly mud and areas dominantly silt and sand. All other areas are alluvium undivided, except for some areas where tidal flat areas are mapped. The soils are mostly composed of clay, silt, sand, gravel and organic matter. The silt and sand are described as calcareous and dark xxxx to dark xxxxx in color. The sand is mostly quartz and the gravel along Rio Grande include sedimentary rocks from the Cretaceous and Tertiary and a wide variety of igneous and sedimentary rocks from Trans-Pecos Texas, Mexico, and New Mexico including agate. The gravel in side streams of the Rio Grande is mostly Tertiary rocks and chert derived from Uvalde Gravel. Planned Construction

Appears in 1 contract

Samples: www.tfc.state.tx.us

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXTERRACON CONSULTANTS, INC. By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx.Xxxxx Xxxxxxxxxxx, P.E. Executive Director Sr. Vice President and COO Date signed: 10/03/2022 | 11:00 AM CDT Date signed: 10/03/2022 | 10:53 AM CDT Approved: Xxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx Xxxxx Xxxxxxxx Dir/Xxxxx Xxxxx DED/Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 30000 Xxxxxxxxxx Xxxx Xxxx., 2023 Xxx. 000 Austin, Texas 78735 P (000) 000-0000 Xxxxxxxx.xxx September 26, 2022 Xx. Xxxxxxx Xxxxx Xxxxxxxx TFC Texas Facilities Commission 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxx. Austin, Texas 78701 Telephone: 000.000.0000 Email: xxxxx.xxxxxxxx@xxx.xxxxx.xx.xx Re: Construction Materials Inspection and Testing Services TFC – DM 20-21 DSHS 0000 X. 00xx Xxxxxx Xxxxxx, Xxxxx 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Terracon Consultants Inc. Proposal No. P96221162, Revision 1 Dear Xx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Thank you for selecting Terracon Consultants Inc. (RKCI) is pleased to submit our proposal to provide the construction materials observation and testing services on for the project referenced aboveTFC – DM 20-21 DSHS project. We propose an estimated budget of $1,428.90 for testing and observation As you know, Xxxxxxxx provided the geotechnical engineering services for the referenced projectproject (Terracon Report No. 96225089 dated 07/01/2022). This budget is based on proposal outlines our understanding of the project, an estimate scope of quantities, services to be provided by Terracon and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our includes unit fees for services will affect the suggested budget. Services we anticipate will be provided on a call out basis required for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPac.

Appears in 1 contract

Samples: www.tfc.texas.gov

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXSURVEYING & MAPPING, INC. LLC By: By: Xxxx Xxxxx Xxxxxxx XxxxxxxX. Xxxxx, Xx., P.E. RPLS Executive Director Sr. Principal/Executive Vice President and COO Date signed: 03/07/2022 | 4:12 PM CST 03/07/2022 | 2:45 PM CST Date signed: Approved: Xxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx Xxxxxxxx Xxxx Xxxxx Dir/Xxxxx Xxxxx DED/Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail toDocuSign Envelope ID: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3DD73923C-4E9F-4A59-872C-1BB97F30AFB4 Via Email: Xxxx.Xxxxx@xxx.xxxxx.xxx June 17, 2023 Xx. Xxxxxxx Xxxxxxxx TFC 2021 Texas Facilities Commission 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Dear Xx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxx Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX ConsultantsAttn: Xxxx Xxxxx, Inc. Project Manager Re: DPS Statewide XX - Xxxxxx NW Area Office Topographic & Utility Survey XXX Proposal No. 1021059877A Dear Xx. Xxxxx: Surveying And Mapping, LLC (RKCIXXX) is pleased to submit our provide this revised proposal to provide Texas Facilities Commission for professional services in connection with the construction materials observation and testing services above referenced project shown on Exhibit “A”. Based upon our correspondence, we have prepared the project referenced aboveattached Scope of Services. We propose an estimated budget of $1,428.90 for testing and observation services for the referenced project. This budget is based on our understanding of the project, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI appreciate the opportunity to submit our this proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to working with you during the construction of on this very important project. If you should have any questions concerning our proposal or need require any additional information, please call us at feel free to contact me. Sincerely, SURVEYING AND MAPPING, LLC Xxxxxx X. Xxxxxxxxxx, RPLS Senior Project Manager Direct (000) 000-0000 Xxxxxx.Xxxxxxxxxx@xxx.xxx XXX COMPANIES 0000 Xxxxxxxxx Xxxxxxx / Xxxx. 0 Xxxxx 000 0000/ Xxxxxx, Xxxxx 00000 512.447.0575 Office / 000.000.0000 Fax / TBPELS #00000000 xxx.xxx DocuSign Envelope ID: DD73923C-4E9F-4A59-872C-1BB97F30AFB4 SCOPE OF SERVICES AND ESTIMATED FEE DPS STATEWIDE DM – AUSTIN NW AREA OFFICE TOPOGRAPHIC & UTILITY SURVEY PROJECT OVERVIEW Surveying And Mapping, LLC (XXX) proposes to provide a Topographic Survey to Texas Facilities Commission (Client). CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3The survey will be of a portion of the property at 13730 N US 000 Xxx, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INCXxxxxxx Xxxx Southbound. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown As shown on Exhibit A below. SURVEY ASSUMPTIONS The following assumptions were made for the preparation of this Scope of Work Report Distribution Terms Services. If these assumptions do not prove correct, a modification to the scope and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Reviewbudget for this project may be required. • Client will provide Right of Entry and access to any private properties as required to perform the services described herein, and Report Distribution if necessary gain permission of adjoining properties. • Survey Feature Codes will be shown as per XXX current Feature Library and Line Styles. • XXX will not be working in any hazardous or contaminated areas. • All work will be performed during daytime hours. • The Client will be the liaison for the XXX xxxxx crews to access the Project Work Area. • XXX will be notified, prior to mobilizing to the Project, of any special requirements for access and the performance of the work. • XXX personnel will have unrestricted access to the work areas on a ten (10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPac) hour per day basis for each day approved to perform work.

Appears in 1 contract

Samples: Professional Services Agreement

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXXXXXXX ENGINEERING, INC. By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx., P.E. Xxxx Xxxxxxxxxx Executive Director Sr. Vice President and COO 04/14/2021 | 12:17 PM CDT 04/14/2021 | 9:44 AM PDT Date signedof execution: Date signedof execution: ApprovedPM DGC Dir DED TFC Cont March 29, 2021 Attn: Xxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx Xxxxxxxx Dir/Xxxxx Xxxxx DED/Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3, 2023 Xx. Xxxxxxx Xxxxxxxx TFC 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Dear HVAC Testing, Adjusting, and Balancing Proposal (TAB) TFC 20-21DM LBJ Floor Renovation Xxxxxx Proposal #IED – S21-1074.01 Rev 3 Xx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Inc. (RKCI) is pleased to submit our Xxxxxx respectfully submits this proposal to provide Testing, Adjusting and Balancing (TAB) Services for TFC 20-21DM LBJ Floor Renovation project located in Austin, Texas. THE SCOPE OF WORK shall be defined as follows: Test, adjust, and balance the new HVAC related equipment associated with the construction materials observation documents dated 12/18/2020, the 95% construction documents dated 1/22/2021 and testing the TFC Contract No. 00-000-000 and as described in the basic services, clarifications, and exclusions below. BASIC SERVICES: Xxxxxx shall provide the basic services on listed below to generally meet the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services for the referenced project. This budget is based on our understanding intent of the project, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPac’s TAB specification.

Appears in 1 contract

Samples: www.tfc.state.tx.us

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXX, INC. XXXXXX DESIGN ASSOCIATES By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx., P.E. Xxxxx X. Xxxxxx Executive Director Sr. Vice President and COO Date signed: 03/14/2022 | 4:14 PM CDT Date signed: 03/14/2022 | 12:32 PM PDT Approved: Xxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx Xxxxxxxx Xxxxxx Xxxxxx Dir/Xxxxx Xxxxx DED/Xxxx X. Xxxx DocuSign Envelope ID: 2159E9B4-FB69-423B-8BC8-3CEE472FC97F TFC IDIQ C [Delivered by E mail toContract 00-000-000 - Assignment 2 Exhibit A DocuSign Envelope ID: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3, 2023 Xx. Xxxxxxx Xxxxxxxx TFC 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Dear Xx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Inc. (RKCI) is pleased to submit our proposal to provide the construction materials observation and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services for the referenced project. This budget is based on our understanding of the project, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE 2159E9B4-FB69-423B-8BC8-3CEE472FC97F TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INCContract 00-000-000 - Assignment 2 Exhibit A TFC IDIQ Contract 00-000-000 - Assignment 2 Exhibit A ATTACHMENT Company: XXXXXX DESIGN ASSOCIATES BUDGET ESTIMATE WORKSHEET Revision: 2 Project: 22‐010‐2532 – Xxx Houston Campus Main Building. Approved repairs Date: 20‐Jan‐21 Prepared By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx XxxxxxxxxXxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacFAIA Task Levels

Appears in 1 contract

Samples: Professional Services Agreement

Entire Agreement and Modification. The This Agreement and this Assignment and their its integrated attachment(s) constitute the entire agreement of the Parties parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment Agreement specifically displays a mutual intent to amend a particular part of this AssignmentAgreement, general conflicts in language between any such attachment and this Assignment Agreement shall be construed consistently with the terms of this AssignmentAgreement. Unless otherwise expressly authorized by the terms of this AssignmentAgreement, no modification, renewal, extension, or amendment to this Assignment Agreement shall be binding upon the Parties parties unless the same is in writing and signed by the respective Parties parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXKCI TECHNOLOGIES, INC. By: By: Xxxx Xxxxx Xxxxxxx XxxxxxxXxxxx, Xx., P.E. PE Executive Director Sr. Vice President and COO Date signed: 01/18/2022 | 1:00 PM CST Date signed: 01/18/2022 | 12:06 PM CST Approved: Xxx Xxxxxxx Assistant General TFC Legal Counsel PM/Xxxxxxx Xxxxxxxx Dir/Xxxxx Xxxxx DED/Xxxx X. Xxxx Exhibit A 2015 Uniform General Conditions The 2015 Uniform General Conditions (hereinafter referred to as "UGC") are located at this TFC IDIQ C Construction Contracts website link, at 5C in PDF: xxxxx://xxx.xxx.xxxxx.xxx/divisions/facilities/prog/construct/formsindex/2015%20UGC%20 03.07.2017.Final.pdf Exhibit B TFC 2018 Architectural/Engineering Guidelines, Edit Date March 19, 2018. The A/E Guidelines are located at this TFC A/E Forms link in PDF: https://xxx.xxx.xxxxx.xxx/divisions/facilities/prog/construct/formsindex/01%20-%202018% 20A-E%20GUIDELINES.pdf DocuSign Envelope ID: 508506FB-3BDB-4F4B-A68D-803898BE98F7 INDEFINITE DELIVERY INDEFINITE QUANTITY PROFESSIONAL SERVICES AGREEMENT BETWEEN THE TEXAS FACILITIES COMMISSION AND [Delivered INSERT NAME] TFC CONTRACT NO. [INSERT NUMBER] ASSIGNMENT NO. X This Indefinite Delivery Indefinite Quantity Assignment No. X (hereinafter referred to as “Assignment No. X” or “Assignment”) is entered into by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3and between the Texas Facilities Commission, 2023 Xx. Xxxxxxx Xxxxxxxx TFC located at 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxxxxx, Xxxxxx, Xxxxx 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Dear Xx(hereinafter referred to as “TFC”) and [Insert PSP Name] located at [Insert Address] (hereinafter referred to as “PSP”) (TFC and PSP are hereinafter referred to individually as a “Party” or collectively as “Parties”), to be subject to the terms and conditions of TFC Contract No. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Inc. [Insert] (RKCI) is pleased hereinafter referred to submit our proposal to provide as the construction materials observation and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services for the referenced project. This budget is based on our understanding of the project, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays“Agreement”), and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacfollowing.

Appears in 1 contract

Samples: Professional Engineering Services Agreement

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXTERRACON CONSULTANTS, INC. By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx.Xxxxx Xxxxxxxxxxx, P.E. Executive Director Sr. Vice President and COO Date signedof execution: Date signed07/20/2021 | 9:56 AM CDDT ate of execution: 07/20/2021 | 9:14 AM CDT Approved: Xxx Xxxxxxx Assistant General TFC Legal Counsel PM/Xxxxxxx Xxxxxxxx X. Xxxxxx Dir/Xxxxx X. Xxxxx DED/Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail toContract No. 00-000-000 - Assignment No. 10 - Exhibit A DocuSign Envelope ID: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3A7EB685F-C4E5-476D-91EA-8BA543A844C6 June 28, 2023 Xx. Xxxxxxx Xxxxxxxx TFC 2021 Texas Facilities Commission Facilities Design & Construction 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx 00000 Attn: Xx. Xxxx Xxxxxx – Project Manager Re: Construction Materials Testing Cost Estimate for Geotechnical Engineering Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac XXX Houston Repair and Replacements 0000 Xxxx Xxxxxx Xxxxxxx, Xxxxx Terracon Document No. X00000000.Revision1 Dear Xx. XxxxxxxxXxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Terracon Consultants, Inc. (RKCITerracon) is pleased to submit our proposal understands that we have been selected based on qualifications to provide the construction materials observation and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation geotechnical services for the above referenced project. This budget document outlines our understanding of the scope of services to be performed by Terracon for this project and provides an estimate of the cost of our services. The following are exhibits to the attached Agreement for Services. Exhibit A Project Understanding Exhibit B Scope of Services Exhibit C Compensation and Project Schedule Exhibit D Site Location Exhibit E Anticipated Exploration Plan Our base fee to perform the Scope of Services described in this document is $5,900. See Exhibit C for more details of our fees and consideration of additional services. This cost estimate may be accepted by executing a signed Purchase Order/Work Order and returning the executed copy to Terracon. The Scope of Work proposed in this cost estimate and the Proposal for Services and accompanying limitations agreed to in the Indefinite Quantity Professional Services Agreement (TFC Contract No. 18-099-000) shall constitute the exclusive services to be performed for this project. Terracon Consultants, Inc. 00000 Xxxx Xxxx, Xxxxx 000 Xxxxxxx, Xxxxx 00000 P (000) 000 0000 F (000) 000 0000 xxxxxxxx.xxx TFC Contract No. 00-000-000 - Assignment No. 10 - Exhibit A DocuSign Envelope ID: A7EB685F-C4E5-476D-91EA-8BA543A844C6 TFC Contract No. 00-000-000 - Assignment No. 10 - Exhibit A EXHIBIT A - PROJECT UNDERSTANDING Our Scope of Services is based on our understanding of the project, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve project as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing servicesdescribed by Texas Facilities Commission (TFC). We have a fully equipped AASHTO Accredited laboratory and we look forward not visited the project site to providing these services confirm the information provided. Aspects of the project, undefined or assumed, are highlighted as shown below. We request the design team verify all information prior to you during the construction our initiation of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacfield exploration activities.

Appears in 1 contract

Samples: www.tfc.texas.gov

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXWOOD ENVIRONMENT AND INFRASTRUCTURE SOLUTIONS, INC. By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx., P.E. Xxxxxxxx High Executive Director Sr. Vice President and COO Texas Office Manager Date signed: 06/09/2022 | 10:20 AM CDT Date signed: 06/09/2022 | 10:12 AM CDT Approved: Xxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx Xxxxxxxx Xxxxxx Xxx Dir/Xxxxx Xxxxx DED/Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3May 5, 2023 Xx. Xxxxxxx Xxxxxxxx TFC 2022 Xxxxxx Xxx, MBA, PMP, CTCM, RID, LEED AP Project Manager Facilities Design & Construction Texas Facilities Commission Wood Environment & Infrastructure Solutions, Inc. 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx Xxxxx, Xxxxx 000 Xxxxxx, Xxxxx 00000 ReT: Construction 000-000-0000 xxx.xxxxxxx.xxx Subject: Proposal for Limited Asbestos-Containing Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Dear Xx. Xxxxxxxx: Survey Texas School for the Deaf 0000 Xxxxxxx XxxxX Xxxxxxxx Xxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX ConsultantsWood Proposal No. 670622AU02.05 Dear Xx. Xxx: Xxxx Environment & Infrastructure Solutions, Inc. (RKCIWood) is pleased appreciates the opportunity to submit present our proposal to the Texas Facilities Commission (TFC) to provide limited asbestos survey services prior to upcoming renovations at the construction materials observation and testing services following buildings located on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services Texas School for the referenced projectDeaf (TSD) campus in Austin, Texas: • Koen Dormitory • Xxxxx Dormitory • Middle School/High School • CTE Ford Building • Xxxxx Building • Business and Support Building • Kleberg Building This proposal presents our approach to providing asbestos survey services, using our multi-disciplinary capabilities and knowledge of asbestos surveys. This budget is based on The following sections present our understanding Scope of the projectWork, an estimate of quantitiesSchedule, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposalFee Estimate. The scope of work includes services will be performed in accordance with the observation terms and testing of conditions outlined in the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work professional services agreement, please reference our proposal number. Thank you for allowing RKCI TFC Contract 00-000-000, between the opportunity to submit our proposal for the construction materials observation Texas Facilities Commission and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional informationWood Environment & Infrastructure Solutions, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacInc.

Appears in 1 contract

Samples: www.tfc.texas.gov

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXSURVEYING AND MAPPING, INC. LLC (XXX) By: By: Xxxx Xxxxx Xxxxxxx X. Xxxxx Executive Director Vice President Date of execution: 12/03/2020 | 11:01 AM CDSTate of execution: 12/03/2020 | 10:36 AM CST PM DGC Dir DED EXHIBIT A PSP’S IDIQ ASSIGNMENT NO. 5 PROPOSAL NO. 1020058830 DATED NOVEMBER 9, 2020 TDoFcCuSCignoEnntvrealcopt eNIDo:.E1C84-F1503F3E--08A020F-4018-A128-EB5AC47CD770 Assignment 5 EXHIBIT A Surveying and Mapping, LLC (XXX) Surveying And Mapping, LLC 0000 Xxxxxxxxx Xxxxxxx, Xx.Xxxxxxxx Xxx, P.E. Executive Director Sr. Vice President and COO Date signedXxxxx 000, Xxxxxx, XX 00000 Ofc 000.000.0000 Fax 000.000.0000 xxxx@xxx.xxx xxx.xxx.biz TX Firm# 10064300 Via Email: Date signed: Approved: Xxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx Xxxxxxxx Dir/Xxxxx Xxxxx DED/Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3xxxxxxx.xxxxxxxx@xxx.xxxxx.xx.xx November 9, 2023 Xx. Xxxxxxx Xxxxxxxx TFC 2020 Texas Facilities Commission Facilities Design & Construction 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx XX 00000 c/o Xxxxxxx Xxxxxxxx, Senior Project Manager Re: Construction Materials Testing Services Camp 0000 Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Xxxxxx Austin, Texas XXX Proposal No. 1020058830 Dear Xx. Xxxxxxxx: 0000 Xxxxxxx XxxxSurveying And Mapping, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Inc. (RKCILLC {XXX) is pleased to submit our provide this proposal to provide Texas Facilities Commission, for professional services in connection with the construction materials observation above referenced project shown on Exhibit "A". Based upon our correspondence and testing services on discussions, we have prepared the project referenced aboveattached Scope of Services. We propose an estimated budget of $1,428.90 for testing and observation services for the referenced project. This budget is based on our understanding of the project, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI appreciate the opportunity to submit our this proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to working with you during the construction of on this very important project. If you should have any questions concerning our proposal or need require any additional information, please call us at (000) 000 0000feel free to contact me. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3Sincerely, 2023 Very truly yoursSURVEYING AND MAPPING, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET LLC Xxxxxx Day XXX Project Manager DB/AHDocuSign Envelope ID: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms EC4F50FE-8A2F-4018-A128-EB5AC47CD770 TFC Contract No. 00-000-000 Assignment 5 EXHIBIT A Surveying and Conditions Mapping, LLC (DateXXX) TFC IDIQ C PAD23-051-00 3 March 3PROJECT OVERVIEW SCOPE OF SERVICES AND ESTIMATED FEE 0000 XXXXXXX XXXXXX, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: AUSTIN, TEXAS UTILITY INVESTIGATION Surveying And Mapping, LLC (XXX) proposes to perform a utility investigation to support construction to Texas Facilities Commission (Client). The project is located at 0000 Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Xxxxxx, Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacTexas.

Appears in 1 contract

Samples: Professional Services Agreement

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXXXXXXXX CONSULTANTS, INC. By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx.Xxxxx X. Xxxxxx, P.E. Executive Director Sr. Vice President and COO Energy, Power & Environment Market Leader Date signed: 03/14/2022 | 9:14 AM CDT Date signed: 03/14/2022 | 7:05 AM PDT Approved: Xxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx Xxxxx Xxxxxxxx Dir/Xxxxx Xxxxx DED/Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail toDocuSign Envelope ID: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 34F6CA870-679C-4CFB-A121-6F171185DD7D February 23, 2023 2022 Xx. Xxxxxxx Xxxxx Xxxxxxxx TFC Project Manager Texas Facilities Commission Design and Construction 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx XX 00000 ReRE: Construction Materials Testing Professional Engineering Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac for Design of DM Projects in Two State Buildings in Austin – DSHS Buildings F and T – Additional Services Fire Dampers in DHT Dear Xx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Inc. (RKCI) is pleased Consultants appreciates the opportunity to submit our this proposal to provide the construction materials observation and testing for additional professional engineering/architectural services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services for the above referenced project. This budget proposal has been developed as Professional Engineering Services to replace Fire Dampers for DSHS Campus Building T (DHT - Tower). It is based on our Xxxxxxx Consultants’ understanding of the project, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services terms and conditions of this project assignment agreement will be provided on a call out basis for defined by the cost estimate spreadsheet attached to this proposalstandard form of Texas Facilities Commission’s (TFC) Professional Architectural/Engineering Services Agreement under our IDIQ Contract No. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (00-000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPac000.

Appears in 1 contract

Samples: www.tfc.texas.gov

AutoNDA by SimpleDocs

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXX, INC. [INSERT PSP NAME] By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx., P.E. Print Name: Executive Director Sr. Vice President and COO Print Title: Date signed: Date signed: Approved: Xxx Xxxxxxx Assistant General TFC Legal Counsel PM/Xxxxxxx Xxxxxxxx PM/ Dir/Xxxxx X. Xxxxx DED/X.X. Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail toDocuSign Envelope ID: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3B7933028-1A8C-4EE8-8F11-278F9DB6525E DocuSign Envelope ID: B7933028-1A8C-4EE8-8F11-278F9DB6525E Resumes and Organizational Chart TEXAS FACILITIES COMMISSION XXXXXX X XXXXX Xxxxxx Xxxxx, 2023 Xx. Xxxxxxx PE Austin, Texas Xxxxxxxx TFC 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxx Engineers (HUB) Xxxxxx Xxxxxx, PE, LEED AP Dallas, Texas Xxxxxx X Xxxxx 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx, PE, ENV SP Houston, Texas Xxxxxx X Xxxxx Xxxxx Xxxxxxxx, PE Austin, Texas Xxxxxx X Xxxxx Xxxxxxxx Xxxxx, PE El Paso, Texas Xxxxxx X Xxxxx Xxxxx Xxxxxxxx, PE Austin, Texas Xxxxxx X Xxxxx CIVIL ENGINEERING Xxx Xxxxx, PE, LEED AP, ENV SP Xxxxxx X Xxxxx Xxxxxxx Campus on N MoPac Dear Xx. Xxxxxxxx: 0000 Xxxxxxx XxxxXxxxxxx, PE, LEED AP Xxxxxx X Xxxxx X-000 OPERATIONS/QUALITY MANAGER PRINCIPAL IN CHARGE Xxxx Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX ConsultantsPE, Inc. (RKCI) is pleased to submit our proposal to provide the construction materials observation and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services for the referenced project. This budget is based on our understanding of the projectENV SP Xxxxxx X Xxxxx POINT OF CONTACT STRUCTURAL ENGINEERING Xxxx Xxxxxxxx, an estimate of quantitiesPE, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip PEng Austin, TX 78701 Phone NumberTexas Xxxxxx X Xxxxx Xxxxx Xxxxxxxx, PE, SE Austin, Texas Xxxxxxxx Xxxxx Engineers (HUB) Lane Lease, PE, CFM RODS XXX (HUB) SUBSURFACE UTILITY ENGINEERING Xxxxx Xxxxxxx Xxxxxxxx, RPLS RODS Surveying (HUB) SURVEYING Xxxxxx X Xxxxx | Texas Facilities Commission RFQ #000-0-00000 14 DocuSign Envelope ID: 000.000.0000 (O) 000.000.0000 (M) E MailB7933028-1A8C-4EE8-8F11-278F9DB6525E DocuSign Envelope ID: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, B7933028-1A8C-4EE8-8F11-278F9DB6525E DocuSign Envelope ID: B7933028-1A8C-4EE8-8F11-278F9DB6525E Exhibit F Criminal Background Checks and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 Application Guidelines The Criminal Background Checks and Application Guidelines are located at this TFC IDIQ C PAD23 050 00 March 3, 2023 GeneralConstruction Contracts website link at 5E in PDF: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacxxxxx://xxx.xxx.xxxxx.xxx/divisions/facilities/prog/construct/formsindex/TEXAS%20FACIL ITIES%20COMMISSION%20CRIMINAL%20BACKGROUND%202016.pdf DocuSign Envelope ID: B7933028-1A8C-4EE8-8F11-278F9DB6525E DocuSign Envelope ID: B7933028-1A8C-4EE8-8F11-278F9DB6525E DocuSign Envelope ID: B7933028-1A8C-4EE8-8F11-278F9DB6525E DocuSign Envelope ID: B7933028-1A8C-4EE8-8F11-278F9DB6525E DocuSign Envelope ID: B7933028-1A8C-4EE8-8F11-278F9DB6525E DocuSign Envelope ID: B7933028-1A8C-4EE8-8F11-278F9DB6525E DocuSign Envelope ID: B7933028-1A8C-4EE8-8F11-278F9DB6525E DocuSign Envelope ID: B7933028-1A8C-4EE8-8F11-278F9DB6525E DocuSign Envelope ID: B7933028-1A8C-4EE8-8F11-278F9DB6525E DocuSign Envelope ID: B7933028-1A8C-4EE8-8F11-278F9DB6525E DocuSign Envelope ID: B7933028-1A8C-4EE8-8F11-278F9DB6525E

Appears in 1 contract

Samples: Professional Engineering Services Agreement

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties Parties, and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXX AND XXXXXXX, INC. By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx.Xxxxx X. Xxxx, P.E. Executive Director Sr. Vice President and COO Facilities / LEED AP BD+C Date signed: 04/01/2022 | 10:56 AM CDT Date signed: 04/01/2022 | 8:07 AM PDT Approved: Xxx Xxxxxxx Assistant General Counsel PMXxxxx Xxxxx Director, FDC CM/Xxxxxxx Xxxxxxxx Xxx Conrood Mgr/Xxxxxx Xxxxx Dir/Xxxxx Xxxxx DEDXxxxxxxx COO/Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 Xxxxxxx March 314, 2023 2022 Xx. Xxxxxxx Xxxxxxxx TFC Xxxxxx Xxxxx, Facilities and Maintenance Manager Texas Facilities Commission 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Dear Xx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX ConsultantsRe: Proposal for Xxxxxx X. Xxxxxxx Electrical Audit Dear Xx. Xxxxx, Inc. (RKCI) is In response to our telephone conversation with you on November 17 and February 24, we are pleased to submit our this revised proposal for providing professional services to provide the construction materials observation and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services Texas Facilities Commission for the referenced projectelectrical power plan, riser, and one-line diagram update for the Xxxxxx X. Xxxxxxx Building. This budget Ram Manoj shall be our project manager for this project which is based on under our understanding Professional Services Agreement IDIQ No. 00-000-000 MEP. SCOPE OF SERVICES Xxxxxx and Xxxxxxx (FNI) will render the following professional services in connection with the development of the project, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx Xxxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacElectrical Audit.

Appears in 1 contract

Samples: www.tfc.texas.gov

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXWOOD ENVIRONMENT & INFRASTRUCTURE SOLUTIONS, INC. By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx., P.E. Xxxxxxxx High Executive Director Sr. Vice President and COO Texas Office Manager Date signed: 02/07/2022 | 11:14 AM CST Date signed: 02/07/2022 | 9:28 AM CST Approved: Xxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx Xxxxxxxx Xxxxx Xxxxxxxxxx Dir/Xxxxx Xxxxx DED/Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3Contract No. 00-000-000 - Assignment No. 3 - Exhibit A December 22, 2023 2021 Xx. Xxxxx Xxxxxxxxxx, AIA, CTCM Project Manager Texas Facilities Commission Facilities Design & Construction Subject: Proposal for Asbestos Consulting Services Xxxx X. Xxxxxxx Xxxxxxxx TFC 0000 Xxx Xxxxxxx Xxxxxxxxx Building Cafeteria 000 Xxxx 00xx Xxxxxx, Xxxxxx, Xxxxx 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Wood Proposal No. 670621AU22.01 Dear Xx. XxxxxxxxXxxxxxxxxx: Xxxx Environment & Infrastructure Solutions, Inc. 0000 Xxxxxxx XxxxXxxxxxxxx Xxxxxx Xxxxx, Xxxxx X-000 000 Xxxxxx, XX Xxxxx 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX ConsultantsT: 512-795-0360 xxx.xxxxxxx.xxx Wood Environment & Infrastructure Solutions, Inc. (RKCIWood) is pleased appreciates the opportunity to submit present our proposal to the Texas Facilities Commission (TFC) to provide asbestos survey services prior to upcoming renovations at the construction materials observation Xxxx X. Xxxxxxx Building (Xxxxxxx Building) Cafeteria. In addition, we are providing a cost estimate for abatement design and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services for the referenced projectmonitoring, as requested by TFC. This budget is based on proposal presents our understanding approach to providing asbestos survey, design and monitoring services, using our multi-disciplinary capabilities and knowledge of the projectasbestos surveys and asbestos abatements. The following sections present our Scope of Work, an estimate of quantitiesSchedule, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposalFee Estimate. The scope of work includes services will be performed in accordance with the observation terms and testing of conditions outlined in the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work professional services agreement, please reference our proposal number. Thank you for allowing RKCI TFC Contract 00-000-000, between the opportunity to submit our proposal for the construction materials observation Texas Facilities Commission and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional informationWood Environment & Infrastructure Solutions, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacInc.

Appears in 1 contract

Samples: www.tfc.texas.gov

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXX, INC. [INSERT PSP NAME] By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx., P.E. Print Name: Executive Director Sr. Vice President and COO Print Title: Date signed: Date signed: Approved: Xxx Xxxxxxx Assistant General TFC Legal Counsel PM/Xxxxxxx Xxxxxxxx PM/ Dir/Xxxxx X. Xxxxx DED/X.X. Xxxx X. Xxxx TFC DocuSign Envelope ID: 1B8291DF-1E0B-477C-8F67-05151EBCB78A Texas Facilities Commission RFQ 000-0-00000 DocuSign Envelope ID: 1B8291DF-1E0B-477C-8F67-05151EBCB78A IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3for Professional Civil Engineering and Land/Utility Surveying Services ORGANIZATIONAL CHART Bold = Resume Provided Xxx Xxxxx, 2023 Xx. XX Xxxxxx Office QUALITY ASSURANCE / QUALITY CONTROL Xxxxxxx Xxxxxxxx TFC 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, PE, RAS San Antonio Office PROJECT MANAgER PROJECT PRINCIPAL Xxxxxxx X. Xxxxxx, PE, CFM San Antonio Office Xxxxx 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Dear Xx. Xxxxxxxx: 0000 Xxxxxxx XxxxXxxxxxx, PE San Antonio Office Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX ConsultantsXxxxxx Office CIVIL ENgINEERINg Xxxxxx Xxxxxxxx, Inc. (RKCI) is pleased to submit our proposal to provide the construction materials observation and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services for the referenced project. This budget is based on our understanding of the projectRPLS San Antonio Office LAND/UTILITY SURVEYINg DESIgN SUPPORT Xxxxx Xxxxxxxxx, an estimate of quantitiesPE Xxxxx Xxxxxxxxx, PE Xxxxxxx Xxxxxxx, PE Xxxxxxx Xxxxxx, EIT Xxxxx Xxxxxxx, EIT Xxxxxx XxXxxxx SURVEY / gEOSPATIAL SUPPORT 4 RPLS + 1 Lidar Manager 5 Survey Technicians 4 Lidar Technicians 10 Fully Equipped Survey Crews 2 Part 107 UAS Pilots In-House Mobile Lidar, XXX HDS Scanning, and past experience with similar projects. A cost estimate breakdown is presented UAS Mapping XXXXXXX has the staff and resources to complete concurrent work orders in the attached spreadsheet. Austin or at any other TFC facility in Texas Xxxxxxx & Associates, LLC – An ESP Company SUMMARY OF PRACTICE HISTORY, ORgANIZATIONAL CHART & RESUMES 3 DocuSign Envelope ID: 1B8291DF-1E0B-477C-8F67-05151EBCB78A DocuSign Envelope ID: 1B8291DF-1E0B-477C-8F67-05151EBCB78A DocuSign Envelope ID: 1B8291DF-1E0B-477C-8F67-05151EBCB78A Exhibit F Criminal Background Checks and Application Guidelines The Criminal Background Checks and Application Guidelines are located at this TFC Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materialsContracts website link at 5E in PDF: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved Byxxxxx://xxx.xxx.xxxxx.xxx/divisions/facilities/prog/construct/formsindex/TEXAS%20FACIL ITIES%20COMMISSION%20CRIMINAL%20BACKGROUND%202016.pdf DocuSign Envelope ID: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH1B8291DF-1E0B-477C-8F67-05151EBCB78A DocuSign Envelope ID: am Attachments1B8291DF-1E0B-477C-8F67-05151EBCB78A DocuSign Envelope ID: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD231B8291DF-1E0B-477C-8F67-05105151EBCB78A DocuSign Envelope ID: 1B8291DF-1E0B-477C-8F67-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name05151EBCB78A DocuSign Envelope ID: Camp Xxxxxxd CH6 concrete testing Project Location1B8291DF-1E0B-477C-8F67-05151EBCB78A DocuSign Envelope ID: Camp Xxxxxxd Campus on N MoPac Contact Name1B8291DF-1E0B-477C-8F67-05151EBCB78A DocuSign Envelope ID: Xxxxxxx Xxxxxxxx Client1B8291DF-1E0B-477C-8F67-05151EBCB78A DocuSign Envelope ID: TFC Address1B8291DF-1E0B-477C-8F67-05151EBCB78A DocuSign Envelope ID: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number1B8291DF-1E0B-477C-8F67-05151EBCB78A DocuSign Envelope ID: 000.000.0000 (O) 000.000.0000 (M) E Mail1B8291DF-1E0B-477C-8F67-05151EBCB78A DocuSign Envelope ID: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPac1B8291DF-1E0B-477C-8F67-05151EBCB78A

Appears in 1 contract

Samples: Professional Engineering Services Agreement

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXTERRACON CONSULTANTS, INC. By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx.Xxxxx Xxxxxxxxxxx, P.E. Executive Director Sr. Vice President and COO Date signed: 05/26/2022 | 11:46 AM CDT Date signed: 05/26/2022 | 11:45 AM CDT Approved: Xxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx Xxx Xxxxxxxx Dir/Xxxxx Xxxxx DED/Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail toDocuSign Envelope ID: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 30BAD573F-5612-4D11-B022-B1C2498E383D April 24, 2023 Xx. Xxxxxxx Xxxxxxxx TFC 2022 Texas Facilities Commission Minor Construction 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx 00000 Attention: Xx. Xxx Xxxxxxxx – Project Manager Phone: (000) 000-0000 E-mail: Xxx.Xxxxxxxx@xxx.xxxxx.xxx Re: Construction Materials Testing Proposal for Asbestos Consulting Services Camp Xxxxxx X. Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Dear Office Building 000 Xxxx 00xx Xxxxxx Xxxxxx, Xxxxx 00000 Terracon Proposal No. P96217106 Revision 2 Xx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Inc. (RKCI) is pleased to submit our proposal to provide the construction materials observation and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services for the referenced project. This budget is based on our understanding of the project, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPac:

Appears in 1 contract

Samples: www.tfc.texas.gov

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXX, INC. [INSERT PSP NAME] By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx., P.E. Print Name: Executive Director Sr. Vice President and COO Print Title: Date signed: Date signed: Approved: Xxx Xxxxxxx Assistant General TFC Legal Counsel PM/Xxxxxxx Xxxxxxxx PM/ Dir/Xxxxx X. Xxxxx DED/X.X. Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail toDocuSign Envelope ID: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 472A89A2-33BC-4DFB-97F7-07C0CB0D405C DocuSign Envelope ID: 472A89A2-33BC-4DFB-97F7-07C0CB0D405C Methodology | Section 3, 2023 Xx-D Team Organization MWM DesignGroup has been providing integrated services for over 40 years to its clients. Xxxxxxx Xxxxxxxx TFC 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Dear Xx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Inc. (RKCI) The goal of MWM is pleased to submit our proposal to provide Texas Facilities Commission with a team of qualified professionals ready to respond to any IDIQ assignment need. Our promise is simplicity, economy, and efficiency – to serve as an effective resource for the construction materials observation and testing services on the project referenced aboveTFC. We propose an estimated budget of $1,428.90 for testing and observation services for intend to continue providing the referenced project. This budget is based on our understanding of the project, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delayssame transparent structure, and the number same exemplary level of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposalservice, as under current and previous IDIQ/ rotation list programs, serving clients throughout Central Texas. The scope of work includes the observation simple and testing direct organizational structure of the following construction materials: Concrete compressive strength specimen samplingteam is graphically depicted, testingwhich identifies the key personnel from each discipline, and reportingas well as their responsibilities. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposalPROGRAM PRINCIPAL Xxxxx Xxxxxx, initial every page of each attachmentPE, fill out the Report Distribution ListF.NSPE PROJECT MANAGER PROJECT MANAGER ARCHITECTURE Xxxx Xxxxxx PhD, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreementAIA PROGRAM QA + QC Xxxxx Xxxxx, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional informationPE Xxxx Xxxxxxxx, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • AIA LEED AP BD+C Xxxxxxxx Xxxxxx, AIA Xxxxxx Xxxxxxxxxxx, Architect Intern ARCHITECTURE Elti Belaj, Architect Intern INTEGRATED SERVICES INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxx Xxxxxxxxx, Ph.D.P.E., P.E. CoMET Project Manager DB/AHPMP MWM DesignGroup LAND DEVELOPMENT Xxxxx Xxxxx, PE LANDSCAPE ARCHITECTURE Xxxxx Xxxxxxx, RLA SURVEYING Xxxxxxx Xxxxxx, RPLS Texas Facilities Commission RFQ 000-0-00000: am AttachmentsProfessional Architectural Services IDIQ | 18 DocuSign Envelope ID: Cost Estimate Breakdown Scope of Work Report Distribution Terms 472A89A2-33BC-4DFB-97F7-07C0CB0D405C DocuSign Envelope ID: 472A89A2-33BC-4DFB-97F7-07C0CB0D405C DocuSign Envelope ID: 472A89A2-33BC-4DFB-97F7-07C0CB0D405C Exhibit F Criminal Background Checks and Conditions (Date) Application Guidelines The Criminal Background Checks and Application Guidelines are located at this TFC IDIQ C PAD23Construction Contracts website link at 5E in PDF: xxxxx://xxx.xxx.xxxxx.xxx/divisions/facilities/prog/construct/formsindex/TEXAS%20FACIL ITIES%20COMMISSION%20CRIMINAL%20BACKGROUND%202016.pdf DocuSign Envelope ID: 472A89A2-05133BC-4DFB-97F7-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name07C0CB0D405C DocuSign Envelope ID: Camp Xxxxxxd CH6 concrete testing Project Location472A89A2-33BC-4DFB-97F7-07C0CB0D405C DocuSign Envelope ID: Camp Xxxxxxd Campus on N MoPac Contact Name472A89A2-33BC-4DFB-97F7-07C0CB0D405C DocuSign Envelope ID: Xxxxxxx Xxxxxxxx Client472A89A2-33BC-4DFB-97F7-07C0CB0D405C DocuSign Envelope ID: TFC Address472A89A2-33BC-4DFB-97F7-07C0CB0D405C DocuSign Envelope ID: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number472A89A2-33BC-4DFB-97F7-07C0CB0D405C DocuSign Envelope ID: 000.000.0000 (O) 000.000.0000 (M) E Mail472A89A2-33BC-4DFB-97F7-07C0CB0D405C DocuSign Envelope ID: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General472A89A2-33BC-4DFB-97F7-07C0CB0D405C DocuSign Envelope ID: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPac472A89A2-33BC-4DFB-97F7-07C0CB0D405C DocuSign Envelope ID: 472A89A2-33BC-4DFB-97F7-07C0CB0D405C DocuSign Envelope ID: 472A89A2-33BC-4DFB-97F7-07C0CB0D405C

Appears in 1 contract

Samples: Architectural Services Agreement

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXXXXXXXX CONSULTANTS, INC. By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx.Xxxxx X. Xxxxxx, P.E. Executive Director Sr. Vice President and COO Energy, Power & Environment Market Leader 06/16/2022 | 4:16 PM CDT Date signed: Date signed: 06/16/2022 | 1:12 PM PDT Approved: Xxx Xxxxxxx Assistant X. Xxxxxx General Counsel PM/Xxxxxxx Xxxxxxxx Dir/Xxxxx Xxxxx Xxxxxxxxxx DED/Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail toDocuSign Envelope ID: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3983DF1A5-A8B6-4E08-9B31-FAD7178F923C April 8, 2023 Xx. Xxxxxxx Xxxxxxxx TFC 0000 2022 – R0 April 21, 2022 – R1 May 11, 2022 – R2 May 17, 2022 – R3 Mr. Xxxxx Nebamazadi Project Manager Texas Facilities Commission X.X. Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Dear Xx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Inc. 00000-0000 RE: Proposal for Professional Engineering Services for Commissioning TFC 20-21 DM HHSC Multiple Building Project (RKCIProject No. 20-012-5435) is pleased to Dear Mr. Nebamazadi: Texas Facilities Commission (TFC) has requested Xxxxxxx Consultants submit our a proposal to provide the construction materials observation and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation professional engineering services for the referenced subject project. This budget Following is based on our a written understanding of the project, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, this assignment and the number Scope of times that the client or their representative requests our services will affect the suggested budgetServices which Xxxxxxx Consultants proposes to provide TFC as part of this engagement. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. PROJECT UNDERSTANDING The scope of services was developed using construction documents received from Xx. Xxx Xxxxxxxxx with MEP Engineering, Inc (MEP) via emails dated March 8, 2022 & April 19, 2022, and further directions via teleconference on May 6, 2022. As discussed during these emails and teleconference, the project consists of retro-commissioning services of HVAC, Life Safety, and Electrical systems at the following state office buildings: • RDM – Xxxxxx X. Xxxxxxx Building; 0000 Xxxx 00xx Xxxxxx • INW – Insurance Warehouse Building; 0000 Xxxxxxx Xxxx • JHW – Xxxx X. Xxxxxxx Building; 000 Xxxx 00xx Xxxxxx • RBB – Dr. Xxxxxx Xxxxxxxxx Building; 0000 Xxxx 00xx Xxxxxx Our commissioning scope is not intended to be a voluminous report, as the Commissioning process is intended to add functional value to the project in lieu of a “forms population” exercise. As such, a general summary of TFC’s anticipated scope of work for this project includes the observation following: • Provide Commissioning Specification for incorporation into Construction Manager-at-Risk’s scope of work for Contractor’s obligations. • Provide Pre-Functional Checklists for the commissioned equipment and testing issue to the Contractors for their completion to verify equipment installation is completed prior to functional testing. • Provide Functional Performance Testing and Integrated System Testing for the commissioned equipment. • Witness and verify Controls Contractor completes control system calibration and point-to- point checkout for all BAS system modifications in coordination with TFC Controls personnel. • Coordinate with TFC, A/E of the following construction materials: Concrete compressive strength specimen sampling, testingrecord, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original Construction Manager-at-Risk to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you address issues identified during the construction phase. • Attend twenty-eight (28) one-hour bi-weekly construction meetings for the estimated construction duration of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus 650 days with final completion by the CMR anticipated on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPac12/30/2023.

Appears in 1 contract

Samples: www.tfc.texas.gov

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXENERGY ENGINEERING ASSOCIATES, INC. By: By: Xxxx Xxxxx Xxxx Xxxxxxx Xxxxxxx, Xx., P.E. Executive Director Sr. Vice CEO, President and COO Date signed: 02/24/2023 | 2:18 PM CST Date signed: 02/24/2023 | 12:03 PM PST Approved: Xxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx Xxxxxxxx Dir/Xxxxx Xxxxx DED/Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail toContract No. 00-000-000 Energy Engineering Associates, Inc. Assignment No. 2 Project No. 00-000-0000 PO No. 000-0-0000 Exhibit A Proposal (See attached 5 pages) DocuSign Envelope ID: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 37EC5982F-4278-42BD-B264-D7118FA8235C Austin, Texas 0000 Xxxxxx Xxxxx Rd. Suite 200 Austin, Texas 78730 xxxxxx-xx@xxxxx.xxx 512.744.4400 San Antonio, Texas xxxxxxxxxx-xx@xxxxx.xxx 210.955.9930 Albuquerque, New Mexico xxxxxxxxxxx-xx@xxxxx.xxx 505.877.4499 Phoenix, Arizona xxxxxxx-xx@xxxxx.xxx 602.837.4940 xxx.xxxxx.xxx February 6, 2023 Xx. Xxxxxxx Xxxxxxxx TFC 0000 Xxx Xxxxxxx Xxxxxxxxx XxxxxxTexas Facilities Commission Senior Project Manager Austin, Xxxxx 00000 Texas 78945 Re: Construction Materials Testing Proposal for MEP Engineering Services 3rd Party Review and Estimate Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Dear Renewal Xx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Inc. (RKCI) EEA Consulting Engineers is pleased to submit our respond to your request for a fee proposal to provide the construction materials observation and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services for the referenced project. This budget project is based on our understanding of the project, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will to be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE performed under existing TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23Contract Number 22-051007-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPac0.

Appears in 1 contract

Samples: Engineering Services Agreement

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXPROFESSIONAL SERVICE INDUSTRIES, INC. By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx.Xxxxxx X. Xxxxx, P.E. Executive Director Sr. Vice President and COO Branch Manager Date signed: 05/26/2022 | 8:15 AM CDT Date signed: 05/26/2022 | 8:01 AM CDT Approved: Xxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx Xxxxxxxx Xxxxx Xxxxxx Dir/Xxxxx Xxxxx DED/Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail toProfessional Service Industries, Inc. 0000 Xxxxxxxx Xxxxx Xxxxxxx, XX 00000 Phone: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3, 2023 Xx. Xxxxxxx Xxxxxxxx TFC 000-000-0000 fax: 000-000-0000 Texas Facilities Commission 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx 00000 ReO: 000-000-0000 M: 000-000-0000 E: xxxxx.xxxxxx@xxx.xxxxx.xxx Attn: Xx. Xxxxx X. Mathis Project Manager, Facilities Design & Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Subject: PROPOSAL FOR LIMITED ASBESTOS RENOVATION SURVEY Heating, Ventilation, and Air Conditioning (HVAC) System Upgrade Xxx Houston Regional Library & Research Center (SHC) 000 Xxxx xx Xxxxxx Xx 0000 Xxxxxxx, Xxxxx 00000 Dear Xx. XxxxxxxxXxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX ConsultantsThank you for giving us the opportunity to propose our services to you. Professional Service Industries, Inc. (RKCI) PSI), an Intertek company, is pleased to submit submitting this proposal for performance of a Limited Asbestos Renovation Survey at the above-referenced property. Presented below is a review of furnished project information, along with our proposal to provide proposed scope of services, schedule, and fee information. Please review the construction materials observation and testing services on information in the project referenced aboveunderstanding. We propose If any information is provided in error, please contact us for revision. PROJECT UNDERSTANDING PSI understands that the subject property is currently improved with a library and research center. According to Liberty County Appraisal District Records, the building is approximately 17,000 square feet in size and was constructed in 1985. Per the Client, the survey is to be conducted within the path of construction related to the replacement of the Heating, Ventilation and Air Conditioning (HVAC) system. PSI will not sample floor tile/linoleum and/or cove-base. The client is requesting the performance of a Limited Asbestos Renovation survey in order to obtain a renovation permit from the corresponding local permitting office and to comply with state and federal regulations regarding the potential presence of asbestos-containing materials (ACMs) in the areas that will be disturbed during the renovation activities. PSI was informed by the client that asbestos surveys were performed in 2000 and 2012. PSI will need to review these survey’s prior to conducting the field work to confirm that the materials in the client’s path of construction were assessed completely and in sufficient quantity to attest to in our report. If any of the above information is found to be incorrect, kindly notify PSI immediately so a revised proposal can be issued. LIMITED ASBESTOS RENOVATION SURVEY Samples of exposed and accessible building materials will be collected by a United States Environmental Protection Agency (EPA) and Texas Department of State Health Services (Texas DSHS) licensed Asbestos Inspector. Surfacing materials and other finishes may be damaged in order to access suspect building TFC C materials. PSI shall not be held liable for any damages or repairs resulting from our sampling event. The Inspector will list materials found that are suspected of containing asbestos and give a detailed description of their location. Any suspect material found to be significantly damaged as defined by EPA will also be noted. The collected samples will be delivered via chain of custody to a State of Texas asbestos licensed laboratory and accredited with the National Voluntary Laboratory Accreditation Program (NVLAP). Samples will be examined through visual observation to determine estimations of the relative amount of each constituent. This is performed by determining the volume of each constituent in proportion to the total volume of the sample collected with the aid of a stereoscope. Furthermore, the samples will be mounted on slides for microscopic identification and analyzed for asbestos (chrysotile, amosite, crocidolite, anthophyllite, actinolite, and tremolite), fibrous non- asbestos constituents (mineral wool, paper, etc.), and non-fibrous constituents. The analysis consists of the determination of the optical properties such as morphology, color, refractive indices and other properties. The analysis for asbestos fibers is outlined in 40 CFR Part 763.1, Appendix A, Subpart F, Polarized Light Microscopy (PLM). In public buildings, a material is considered by the State of Texas to be asbestos-containing if at least one sample collected from the homogeneous area has asbestos present in a quantity of one percent or greater (1%). The United States Occupation Safety and Health Administration (OSHA) has indicated that there is no safe level of asbestos. Analytical results indicating asbestos in concentrations from trace to 1% will require worker protection during removal. Per EPA regulations, when visual estimations indicate levels between “trace” and 10% asbestos, the client has the option to quantify the asbestos concentration by point counting or to assume the material to be asbestos. PSI recommends the point counting procedure on samples visually estimated to contain between 1% to 3% asbestos. It is to the financial advantage of the client for asbestos to be below the guideline targets of 1% asbestos for abatement and landfill cost purposes. PSI will not point count unless requested and authorized by the client. The additional charge for the point count quantification, if needed, will be the responsibility of the client. PSI will review specifications, drawings, and other documents provided by the client that would assist in identifying the suspect materials located within the building. This may also include interviewing maintenance personnel and building operations personnel for their knowledge of the use of asbestos in the existing building. The following is a listing of the typical materials that may be sampled: Surfacing Thermal System Insulation (TSI) Miscellaneous Fireproofing Pipe/Fitting Insulation Ceiling Tiles Acoustical Plaster Breeching Insulation Cove-Base Hardwall Plaster Ductwork (Interior) Insulation Floor Tile/Linoleum Textured paint/coating Ductwork (Exterior) Insulation Adhesives/Mastics Blown-in Insulation Caulking/Putties Fire Doors The PSI Inspector will develop an estimated budget quantity of $1,428.90 each material identified. The estimated quantity of laboratory identified ACM will be listed with the material. In the case of potential future abatement activities, the abatement contractor is responsible for testing quantifying all ACMs to be removed at the site. Any material that cannot be fully accessed will be noted as not having an accurate quantity due to the inaccessibility of the material. Example: Piping that goes from a mechanical room into an enclosed chase. The Inspector will report only the quantity observed and observation services note that there is the possibility of additional materials in inaccessible areas. Estimated quantities will be given in square footage for surfacing and miscellaneous materials, and linear feet for piping TFC C insulation. The EPA's National Emission Standards for Hazardous Air Pollutants (NESHAP) regulations (40 CFR 61 [M]) require that regulated asbestos-containing materials (RACM) be properly removed prior to any demolition or renovation activity which may disturb them. Materials that are friable or may become friable during renovation/demolition are generally considered as RACM by the EPA. PSI will assess the condition of the suspect materials observed. The material assessment will involve touching the materials to determine whether the material is friable and assessing the material in accordance with EPA guidelines to determine the correct response action to recommend for the referenced projectmaterial. This budget is based on our understanding of the project, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services Drawings will be provided which show the locations of confirmed ACM and sample locations. Drawings will not be to scale. A written description, diagram, or both that clearly and accurately identifies and reflects the location of each homogeneous area will be also be provided. Material locations will be subject to the limitations, if any, identified in the accompanying report. Drawings will not be meant for construction purposes. Sample location drawings will contain an arrow showing the general location within the room or area the sample was taken. PSI does not intend to sample the roofing materials as part of this survey. If the client desires for the roof to be sampled, PSI will meet with your roofing contractor and identify the locations to be sampled. This will protect your roofing warranty. PSI will prepare one (1) report of our findings and provide one (1) electronic (.pdf format) copy. A hardcopy can be provided upon request at no additional fee. The report will contain the detailed results of materials observed, sampling activities, material quantification, and material assessment. SCHEDULE PSI proposes to deliver the report within ten (10) business days of Notice to Proceed and receipt of all sampling results. Rates are based on a call out basis standard three (3) day turn-around time (TAT) for sample results. Please contact PSI for information on expedited lab rates, if requested. Completion of the cost estimate spreadsheet attached project may be affected by access to the property, the availability of information, and other factors. PROFESSIONAL FEES The work will be performed pursuant to the 2022 IDIQ contract and incorporated into this proposal. Delay of access to building interiors may result in additional field workdays and fees. Please see the pricing below for analyzing up to 24 PLM samples: Limited Asbestos Renovation Survey $2,445.00 The scope following unit rates shall apply upon approval from the client and will be billed based on observed field conditions: • Additional inspection time shall be billed additionally, if necessary. • Additional PLM samples (over 24 samples) shall be billed additionally for $20.00 per sample, if agreed to by the client. • Point counting of work includes friable materials shall be billed at $60.00 each layer, if agreed to by the observation and testing client. CLIENT RESPONSIBILITIES It is the responsibility of the client to ensure the following in order to facilitate the efficient provision of the proposed services: • Provide construction materials: Concrete compressive strength specimen samplingdocuments, testingpast survey reports, or other prior asbestos sampling data, prior to PSI’s inspection of the existing structures. TFC C • Provide as-built or downscaled drawings of the existing structures, if available. • Provide access to all areas of the existing structures. Delay of access to building interiors may result in additional field workdays and reportingfees. This proposal may serve • Supply a ladder during the survey, as RKCI’s work agreement needed. • Will be responsible for the referenced projectasbestos laboratory fees above the estimated total. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23Positive-051stop analysis will be requested by Intertek-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacPSI.

Appears in 1 contract

Samples: www.tfc.texas.gov

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties Parties, and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXX AND XXXXXXX, INC. By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx.Xxxxx X. Xxxx, P.E. Executive Director Sr. Vice President and COO Facilities / LEED AP BD+C 12/02/2022 | 3:35 PM CST Date signed: Date signed: 12/02/2022 | 3:31 PM CST Approved: Xxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx Xxxxxxxx Dir/Xxxxx Xxxxx Director, FDC PM/ Xxxxx Xxxxx Dir/ Xxxxx Xxxxxxxxx DED/Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3Contract No. 00-000-000 PSP - Xxxxxx and Xxxxxxx, 2023 Inc. Assignment Xx. 0 Xxxxxxx Xxxxxxxx TFC 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Dear Xx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Inc. EXHIBIT A (RKCI) is pleased to submit our proposal to provide the construction materials observation and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services for the referenced project. This budget is based on our understanding of the project, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date8 pages) TFC IDIQ C PAD23Contract No. 00-051000-00 3 March 3000 PSP - Xxxxxx and Xxxxxxx, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Inc. Assignment Xx. 0 Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 Xx. XX 00000 EXHIBIT B (O1 page) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3Contract 00-000-000 Assignment No. 1 Exhibit B List of PSP Project Manager and Subcontractors (Name, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacCompany Name, Address & Contact Person (Project Manager))

Appears in 1 contract

Samples: www.tfc.texas.gov

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXX, INC. [INSERT PSP NAME] By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx., P.E. Print Name: Executive Director Sr. Vice President and COO Print Title: Date signed: Date signed: Approved: Xxx Xxxxxxx Assistant General TFC Legal Counsel PM/Xxxxxxx Xxxxxxxx PM/ Dir/Xxxxx X. Xxxxx DED/X.X. Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail toDocuSign Envelope ID: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3BD6A15AC-A89C-480F-BA5C-0F7DF1819C88 DocuSign Envelope ID: BD6A15AC-A89C-480F-BA5C-0F7DF1819C88 PACKAGE 3 - SCORED MATERIAL ORGANIZATIONAL CHART PROJECT MANAGER/ POINT-OF-CONTACT Austin Office Xxxxxx Xxxxx, 2023 Xx. Xxxxxxx Xxxxxxxx TFC 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Dear Xx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Inc. (RKCI) is pleased to submit our proposal to provide the construction materials observation and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services for the referenced project. This budget is based on our understanding of the project, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: P.E. DISTRICT MANAGER Dallas/Fort Worth Offices Xxxxx X. Xxxxx Lead CoMET Estimator Xxx XxxxxxxxxXx., P.E., RVP DISTRICT MANAGER Houston Office Xxxxxxxx Xxxxxxx, P.E., RVP QUALITY ASSURANCE/ QUALITY CONTROL Xxxxx X. Xx, P.E. CHIEF MATERIALS ENGINEER, PRINCIPAL CONSULTANTS Xxxxxxx Xxxxxxxxxx, P.E. CORPORATE SAFETY OFFICER Xxxxx Tower OFFICE GEOTECHNICAL PROJECT MANAGERS CMT PROJECT MANAGERS FIELD & LAB PERSONNEL AUSTIN Xxxxx Xxxxxx, Ph.D., P.E. CoMET Project Manager DBXxxx Xxxxxxx 25 Technicians SAN ANTONIO Xxxx Xxxxxxx, P.E. Xxxx Xxxxxxxxx, P.E. 22 Technicians CORPUS XXXXXXX Xxxxxx Xxxxx, X.X. Xxxxxxxx Xxxx−Xxxxx 9 Technicians DALLAS/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC FORT WORTH Xxxxxxx Xxxxxxxxxxx, P.E. Xxxxx Xx, P.E. 75 Technicians EL PASO Xxxxx Xxxxxxxxxx, P.E. Xxxxx Xxxxxxxx, P.E. 21 Technicians HOUSTON Xxxxxxxx Xxxxxxx, P.E. Xxxxxxx Xxxxxxxxxxx, P.E. 45 Technicians HVJ Associates, Inc. | Materials Engineering Xxxxx & Associates | Survey Texas Geo Bore Drilling, LLC | Drilling Services SUBCONTRACTORS PSI | RFQ for IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Geotechnical & Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPac− Xx. 000−0−00000 0 XxxxXxxx Xxxxxxxx ID: BD6A15AC-A89C-480F-BA5C-0F7DF1819C88 DocuSign Envelope ID: BD6A15AC-A89C-480F-BA5C-0F7DF1819C88 DocuSign Envelope ID: BD6A15AC-A89C-480F-BA5C-0F7DF1819C88 DocuSign Envelope ID: BD6A15AC-A89C-480F-BA5C-0F7DF1819C88 DocuSign Envelope ID: BD6A15AC-A89C-480F-BA5C-0F7DF1819C88 DocuSign Envelope ID: BD6A15AC-A89C-480F-BA5C-0F7DF1819C88 DocuSign Envelope ID: BD6A15AC-A89C-480F-BA5C-0F7DF1819C88 DocuSign Envelope ID: BD6A15AC-A89C-480F-BA5C-0F7DF1819C88 DocuSign Envelope ID: BD6A15AC-A89C-480F-BA5C-0F7DF1819C88 DocuSign Envelope ID: BD6A15AC-A89C-480F-BA5C-0F7DF1819C88 DocuSign Envelope ID: BD6A15AC-A89C-480F-BA5C-0F7DF1819C88 DocuSign Envelope ID: BD6A15AC-A89C-480F-BA5C-0F7DF1819C88 DocuSign Envelope ID: BD6A15AC-A89C-480F-BA5C-0F7DF1819C88 DocuSign Envelope ID: BD6A15AC-A89C-480F-BA5C-0F7DF1819C88

Appears in 1 contract

Samples: Professional Engineering Services Agreement

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXX, INC. [INSERT PSP NAME] By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx., P.E. Print Name: Executive Director Sr. Vice President and COO Print Title: Date signed: Date signed: Approved: Xxx Xxxxxxx Assistant General TFC Legal Counsel PM/Xxxxxxx Xxxxxxxx PM/ Dir/Xxxxx X. Xxxxx DED/X.X. Xxxx X. DocuSign Envelope ID: ADEA6A80-F803-42C4-84B1-43F542123585 Organizational Chart DocuSign Envelope ID: ADEA6A80-F803-42C4-84B1-43F542123585 MEET YOUR TEAM The team organization chart shown below identifies the key personnel committed to provide civil engineering and land/utility surveying services to TFC. This team is local and therefore will be responsive, has the depth and expertise to cover anticipated project’s needs, is well known to the TFC, and are fully committed to meeting project scope, schedules and budgets. TEXAS FACILITIES COMMISSION QA/QC MANAGER Xxxxx Xxxxxxxx, XX Xxxxx XX #00000 PRINCIPAL / PROGRAM MANAGER Xxx Xxxxx, PE Texas PE #75764 512.646.4314 XXxxxx@xxxxxxxxxxx.xxx IDIQ CIVIL ENGINEERING & LAND / UTILITY SURVEYING TEAM Xxxx TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3Xxxxxxx, 2023 Xx. Xxxxxxx Xxxxxxxx TFC 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Dear Xx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 RPLS Texas RPLS #4426 Xxxxxx “JR” Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX ConsultantsTexas PE #107322 Xxxxxxx Fees, PE, CFM, LGPP Texas PE #63294 LAND / UTILITY SURVEY PROJECT MANAGER STRUCTURAL ENGINEERING PROJECT MANAGER CIVIL ENGINEERING PROJECT MANAGER DRAINAGE Xxxxxxx Xxxxxxxxxx, PE PAVEMENT Xxxxxxx Casio, PE SITE DEVELOPMENT Xxxxxxx Xxxxxx, PE TRAFFIC ENGINEERING Xxxxxx Xxxxxx, PE UTILITY COORDINATION Xxxxxxx Xxxxxxx, PE UTILITY DESIGN Xxxxx Xxxx, PE (Electric) Xxxx Xxxxxxxxx, PE (Telecom & Gas) Xxxxxxx Xxx Xxxxxxx, PE (Water, Wastewater & Stormwater) SURVEYING & MAPPING Xxxxx Xxxxxx 5 Field Crews SUBSURFACE UTILITY ENGINEERING Xxxxxxx Xxxxxx 5 Field Crews SUBCONSULTANTS CobbFendley is committed to utilizing HUB/DBE certified firms on our team to meet project needs and required goals. We have utilized the following HUB subcontractors on previous teams and have a history of providing successful projects. Altura Solutions, LLC (HUB Certified) - Accessibility Compliance Balcones Geotechnical, LLC (HUB Certified) - Geotechnical Engineering & Materials Testing X X Xxxxxx & Associates, Inc. (RKCIHUB Certified) is pleased to submit our proposal to provide the construction materials observation and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services for the referenced project. This budget is based on our understanding of the project- Traffic Data Acquisition Xxx XxXxxx Environmental Consulting, an estimate of quantitiesInc. (HUB Certified) - Environmental & Cultural Resources Encotech Engineering, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencingInc. (HUB Certified) - Structural Engineering Xxxx Engineering, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at Inc. (000HUB Certified) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction - Geotechnical Engineering & Materials Testing Xxxx X. Xxxxxx, Inc. (HUB Certified) - Structural Engineering MWM Design Group, Inc. (HUB Certified) - Permitting Xxxx, Xxxxxxx & Associates, Inc. | Texas Facilities Commission | RFQ #000-0-00000 | IDIQ for Professional Civil Engineering and Land/Utility Surveying Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacPage 01 DocuSign Envelope ID: ADEA6A80-F803-42C4-84B1-43F542123585 DocuSign Envelope ID: ADEA6A80-F803-42C4-84B1-43F542123585 DocuSign Envelope ID: ADEA6A80-F803-42C4-84B1-43F542123585 Exhibit F Criminal Background Checks and Application Guidelines The Criminal Background Checks and Application Guidelines are located at this TFC Construction Contracts website link at 5E in PDF: xxxxx://xxx.xxx.xxxxx.xxx/divisions/facilities/prog/construct/formsindex/TEXAS%20FACIL ITIES%20COMMISSION%20CRIMINAL%20BACKGROUND%202016.pdf DocuSign Envelope ID: ADEA6A80-F803-42C4-84B1-43F542123585 DocuSign Envelope ID: ADEA6A80-F803-42C4-84B1-43F542123585 DocuSign Envelope ID: ADEA6A80-F803-42C4-84B1-43F542123585 DocuSign Envelope ID: ADEA6A80-F803-42C4-84B1-43F542123585 DocuSign Envelope ID: ADEA6A80-F803-42C4-84B1-43F542123585 DocuSign Envelope ID: ADEA6A80-F803-42C4-84B1-43F542123585 DocuSign Envelope ID: ADEA6A80-F803-42C4-84B1-43F542123585 DocuSign Envelope ID: ADEA6A80-F803-42C4-84B1-43F542123585 DocuSign Envelope ID: ADEA6A80-F803-42C4-84B1-43F542123585 DocuSign Envelope ID: ADEA6A80-F803-42C4-84B1-43F542123585 DocuSign Envelope ID: ADEA6A80-F803-42C4-84B1-43F542123585

Appears in 1 contract

Samples: Professional Engineering Services Agreement

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXWOOD ENVIRONMENT & INFRASTRUCTURE SOLUTIONS, INC. By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx., P.E. Xxxxxxxx High Executive Director Sr. Vice President and COO Texas Office Manager Date signed: 01/31/2022 | 1:29 PM CST Date signed: 01/31/2022 | 1:08 PM CST Approved: Xxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx Xxx Xxxxxxxx Dir/Xxxxx Xxxxx DED/Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail toDocuSign Envelope ID: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3D4BCBDD9-5E68-496B-9DAB-F7D90DB5DA70 December 22, 2023 2021 Xx. Xxxxxxx Xxxxxxxx TFC Xxx Xxxxxxxx, PMP, CTCM Project Manager Facilities Design & Construction Texas Facilities Commission Wood Environment & Infrastructure Solutions, Inc. 0000 Xxxxxxxxx Xxxxxx Xxxxx, Xxx Xxxxxxx Xxxxxxxxx 000 Xxxxxx, Xxxxx 00000 ReT: Construction Materials Testing 512-795-0360 xxx.xxxxxxx.xxx Subject: Proposal for Abatement Consulting Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac LBJ Building Floor 6 000 Xxxx 00xx Xxxxxx, Xxxxxx, Xxxxx 00000 Wood Proposal No. 670621AU22.02 Dear Xx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX ConsultantsXxxx Environment & Infrastructure Solutions, Inc. (RKCIWood) is pleased appreciates the opportunity to submit present our proposal to the Texas Facilities Commission (TFC) to provide asbestos abatement consulting services prior to upcoming renovations at the construction materials observation and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services for the referenced projectXxxxxx X. Xxxxxxx (LBJ) Building, Floor 6. This budget is based on proposal presents our understanding approach to providing asbestos design and monitoring services, using our multi-disciplinary capabilities and knowledge of the projectasbestos abatements. The following sections present our Scope of Work, an estimate of quantitiesSchedule, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposalFee Estimate. The scope of work includes services will be performed in accordance with the observation terms and testing of conditions outlined in the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work professional services agreement, please reference our proposal number. Thank you for allowing RKCI TFC Contract 00-000-000, between the opportunity to submit our proposal for the construction materials observation Texas Facilities Commission and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional informationWood Environment & Infrastructure Solutions, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Inc. Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March Wood performed an asbestos survey of Floors 2, 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin6, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review11 and Suite 124, and results are included in our report titled Report Distribution of Pre-Renovation Asbestos Survey, and dated January 21, 2021. It was determined that the drywall construction on Floor 6 (approximately 15,000 SF) is an asbestos-containing material and is expected to be disturbed during the upcoming renovation project. Based on results of our asbestos survey, we will prepare an asbestos abatement specification as required by the Texas Department of State Health Services (TDSHS). The abatement activities will be limited to the areas determined to contain asbestos-containing building materials as determined by our survey. We will attend one abatement preconstruction meeting, and coordinate the removal operations and scheduling with the TFC and abatement personnel. During abatement, we will have a Texas licensed asbestos project manager/air monitoring technician on-site at all times the abatement contractor is performing removal operations in order to observe and document on-site conditions as required by state law. Our on-site licensed project manager/air monitoring technician will collect ambient air samples during abatement for in-house analysis utilizing phase contrast microscopy (PCM) techniques and provide visual clearance after completion of the removal. Close-out documentation submitted to TFC will include a written report detailing the scope of work, materials abated, conditions observed, procedures used, air sample results, identification of certified abatement and monitoring personnel, and documentation of waste disposal. ‘Wood’ is a trading name for Xxxx Xxxx Group PLC and its subsidiaries DocuSign Envelope ID: D4BCBDD9-5E68-496B-9DAB-F7D90DB5DA70 Proposal for Asbestos Consulting Services Wood Proposal No.: 670621AU22.02 LBJ Building, Floor 6 December 22, 2021 Schedule and Fee Information Upon notice to proceed from the TFC, Wood will proceed with the asbestos abatement design. Wood will provide the design specifications to TFC within two weeks of NTP. Notification to DSHS requires a ten (10% ) working day period before any disturbance of total cost $129.90 GRAND TOTAL $1,428.90 ACMs may occur. TFC IDIQ C PAD23 050 00 March 3will be responsible for payment of required notification fees to the DSHS. Based on the type, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacquantity, and locations of material anticipated for removal, and the availability and efficiency of the abatement contractor, asbestos abatement is expected to take Fifteen (15) 10-hour workdays for Floor 6. After completion of abatement, we estimate it will take two (2) business week to submit the final abatement report.

Appears in 1 contract

Samples: www.tfc.texas.gov

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXWOOD ENVIRONMENT & INFRASTRUCTURE SOLUTIONS, INC. By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx., P.E. Xxxxx Xxxxxx Executive Director Sr. Vice President and COO Associate Industrial Hygienist 02/05/2021 | 3:27 PM CST 02/05/2021 | 2:55 PM CST Date signedof execution: Date signedof execution: ApprovedPM DGC Dir DED EXHIBIT A October 28, 2020 Xx. Xxxx Xxxxx Project Manager Texas Facilities Commission Facilities Design & Construction Subject: Xxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx Xxxxxxxx Dir/Proposal for Asbestos Consulting Services Texas Department of Public Safety, Austin Headquarters 0000 Xxxxx Xxxxx DED/Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3Xxxxxxxxx, 2023 Austin, Texas 78752 Wood Proposal No. 670620AU15.02 Dear Xx. Xxxxx: Xxxx Environment & Infrastructure Solutions, Inc. 0000 X. Xxxxxxx Xxxxxxxx TFC 0000 xx Xxxxx Xxx, Xxx Xxxxxxx Xxxxxxxxx 000 Xxxxxx, Xxxxx 00000 ReT: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Dear Xx. Xxxxxxxx: 000-000-0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultantsxxx.xxxxxxx.xxx Wood Environment & Infrastructure Solutions, Inc. (RKCIWood) is pleased appreciates the opportunity to submit present our proposal to the Texas Facilities Commission (TFC) to provide asbestos survey services prior to upcoming renovations at the construction materials observation Texas Department of Public Safety (DPS) Austin Headquarters, Buildings A, C and testing services on the project referenced above. We propose an estimated budget of $1,428.90 E. In addition, we are providing a cost estimate for testing abatement design and observation services for the referenced projectmonitoring, as requested by TFC. This budget is based on proposal presents our understanding approach to providing asbestos survey, design and monitoring services, using our multi-disciplinary capabilities and knowledge of the projectasbestos surveys and asbestos abatements. The following sections present our Scope of Work, an estimate of quantitiesSchedule, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposalFee Estimate. The scope of services will be performed in accordance with the terms and conditions outlined in the professional services agreement, TFC Contract 00-000-000, between the Texas Facilities Commission and Wood Environment & Infrastructure Solutions, Inc. TFC has requested Wood provide a proposal for Asbestos Survey, Design and Monitoring at Building A, Building C, and Building E located at the DPS Austin Headquarters, to include the following projects: • Building A Warehouse Conversion; • Building A HVAC Replacement; • Building A Roof Replacement Project; • Building C Women’s Dormitory Showers; • Building C HVAC and Chiller Replacement Project; and • Building E Roof Replacement Project. Building A Warehouse Conversion and HVAC Replacement Project: The scope of work for the asbestos survey will include sampling and analysis of building materials within the warehouse and associated office areas located north of Xxxxxxxx X0X0, the vault/pallet room located south of Xxxxxxxx X0X0 and the office/cubicle area located west of Xxxxxxxx X0X0, as requested by TFC. In addition, the base mechanical upgrades include demolition of eleven (11) fan coil units located above ceilings and in mechanical rooms, six (6) air handler units located in mechanical rooms, one DX split system located above ceiling, one package rooftop unit, four (4) multi-zone AHUs located in mechanical rooms and penthouses, and associated controls, thermostats, compressors, ductwork, and piping. Proposal for Asbestos Consulting Services Wood Proposal No.: 670620AU15.02 DPS Buildings A and C Renovations Areas October 28, 2020 Electrical work is to include demolition of overcurrent devices and feeders to the existing equipment. Optional renovation work is to include demolition of walls, doors, and cubicle furniture in the warehouse areas. Our survey will include both base bid and optional renovation areas. Where previous asbestos-containing materials survey data is available (Penthouse Mechanical Rooms), Wood will rely on the survey data presented by others and will not re-sample suspect asbestos-containing materials within those areas. Building C Women’s Dormitory Showers/HVAC and Chiller Replacement Project: The scope of work for the asbestos survey will include sampling and analysis of building materials within second-floor showers and isolation bedrooms. It is our understanding the planned renovation project includes architectural upgrades that will disturb existing walls, ceilings, doors, floors, urinals, toilets, sinks, and showers. In addition, mechanical and electrical work is planned within the observation and testing Women’s dormitory showers to support HVAC system replacement. The mechanical demolition portion of the following construction materials: Concrete compressive strength specimen samplingproject will include demolition of one abandoned water-cooled chiller, testingfive (5) HVAC hydronic pumps, valving and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposalpiping, initial every page of each attachmentone roof-mounted crossflow cooling tower, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPactwo

Appears in 1 contract

Samples: www.tfc.texas.gov

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXX, INC. [INSERT PSP NAME] By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx., P.E. Print Name: Executive Director Sr. Vice President and COO Print Title: Date signed: Date signed: Approved: Xxx Xxxxxxx Assistant General TFC Legal Counsel PM/Xxxxxxx Xxxxxxxx PM/ Dir/Xxxxx X. Xxxxx DED/X.X. Xxxx X. DocuSign Envelope ID: 508506FB-3BDB-4F4B-A68D-803898BE98F7 DocuSign Envelope ID: 508506FB-3BDB-4F4B-A68D-803898BE98F7 ORGANIZATIONAL CHART & RESUMES Principal-in-Charge Xxxxxxx Xxxxx, PE Project Manager Xxxx TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3Xxxxxxx, 2023 Xx. Xxxxxxx Xxxxxxxx TFC 0000 Xxx Xxxxxxx Xxxxxxxxx RPLS, PLS, CP, CMS* Quality Assurance Manager Xxxxx Xxxxxxxx, PE, LEED AP* TRANSPORTATION ENGINEERING Pavement Repairs Xxxxx Xxxxx, PE* Support Team Xxxxxx Xxxxxx, PE, ENV SP, PMP Xxxxxx Xxxxxxx, EIT Accessible Route Analysis and Correction Xxxxx 00000 Re: Construction Materials Testing Services Camp Xxxxxx, PE* Support Team Xxxx Xxxx, PhD, PE Xxxxxx Xxxxxx, PE* New Building Site Boundary/Topographic Surveys Xxxxx Xxxx, SIT* Support Team Xxxx Xx Xxxxxx Xxxxx Xxxxxx Xxxx Xxxxxx Xxxxx Xxxxxxxx Xxxxx Xxxxx Existing Conditions Surveys, Site Development Design and Documentation Xxx Xxxxxxxxxxx, PE* Support Team Xxxxxxx CH6 Concrete Testing Camo Xxxx Xxxxxx Xxxx Xxxxx Xxxxxxxx Xxxxxx Xxxxxx Xxxxx Xxxxxxx Campus on N MoPac Dear Xx. Xxxxxxxx: 0000 LEAD CIVIL ENGINEER Xxxxx Xxxxxxx, PE* CIVIL ENGINEERING LAND SURVEYING HYDRAULICS & HYDROLOGY Drainage Corrections Xxxxxxx Xxxx, Xxxxx X-000 PE, CFM* Support Team Xxxxxx Xxxxxx, XX 00000 P 512.339.1745 PE* Xxxxxx Xxxxxx, PE, ENV SP, PMP Xxxxxxxx Xxxxxxxx, EIT Xxxx Xxxx, PE Xxxxxx Xxxxx UTILITY ENGINEERING Subsurface Utility Engineering Xxxxx Xxxxxxxxxxx, PE* Utility Improvements Xxxx Xxxxx, PE* *Resume included below IDIQ FOR PROFESSIONAL CIVIL ENGINEERING AND LAND/UTILITY SURVEYING SERVICES | Texas Facilities Commission 1 DocuSign Envelope ID: 508506FB-3BDB-4F4B-A68D-803898BE98F7 DocuSign Envelope ID: 508506FB-3BDB-4F4B-A68D-803898BE98F7 DocuSign Envelope ID: 508506FB-3BDB-4F4B-A68D-803898BE98F7 Exhibit F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Inc. (RKCI) is pleased to submit our proposal to provide the construction materials observation Criminal Background Checks and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing Application Guidelines The Criminal Background Checks and observation services for the referenced project. This budget is based on our understanding of the project, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented Application Guidelines are located at this TFC Construction Contracts website link at 5E in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materialsPDF: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved Byxxxxx://xxx.xxx.xxxxx.xxx/divisions/facilities/prog/construct/formsindex/TEXAS%20FACIL ITIES%20COMMISSION%20CRIMINAL%20BACKGROUND%202016.pdf DocuSign Envelope ID: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH508506FB-3BDB-4F4B-A68D-803898BE98F7 DocuSign Envelope ID: am Attachments508506FB-3BDB-4F4B-A68D-803898BE98F7 DocuSign Envelope ID: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23508506FB-3BDB-4F4B-051A68D-803898BE98F7 DocuSign Envelope ID: 508506FB-3BDB-4F4B-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project NameA68D-803898BE98F7 DocuSign Envelope ID: Camp Xxxxxxd CH6 concrete testing Project Location508506FB-3BDB-4F4B-A68D-803898BE98F7 DocuSign Envelope ID: Camp Xxxxxxd Campus on N MoPac Contact Name508506FB-3BDB-4F4B-A68D-803898BE98F7 DocuSign Envelope ID: Xxxxxxx Xxxxxxxx Client508506FB-3BDB-4F4B-A68D-803898BE98F7 DocuSign Envelope ID: TFC Address508506FB-3BDB-4F4B-A68D-803898BE98F7 DocuSign Envelope ID: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number508506FB-3BDB-4F4B-A68D-803898BE98F7 DocuSign Envelope ID: 000.000.0000 (O) 000.000.0000 (M) E Mail508506FB-3BDB-4F4B-A68D-803898BE98F7 DocuSign Envelope ID: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPac508506FB-3BDB-4F4B-A68D-803898BE98F7

Appears in 1 contract

Samples: Professional Engineering Services Agreement

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXTERRACON CONSULTANTS, INC. By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx.Xxxxx Xxxxxxxxxxx, P.E. Executive Director Sr. Vice President and COO Date signed: 01/05/2023 | 5:50 AM CST Date signed: 01/03/2023 | 9:06 AM CST Approved: Xxx Xxxxxxx Assistant X. Xxxxxx General Counsel PM/Xxxxxxx Xxxxxxxx Xxxxx Xxxx Dir/Xxxx X. Xxxx for Xxxxx Xxxxx DED/Xxxx X. Xxxx TFC TERRACON CONSULTANTS, INC. IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3CONTRACT NO. 00-000-000 ASSIGNMENT NO. 8 EXHIBIT A PSP PROPOSAL October 4, 2023 Xx. Xxxxxxx Xxxxxxxx TFC 2022 Mr. Xxxxx Xxxx, AIA, LEED AP, CTCM Texas Facilities Commission 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxx. Austin, Texas 78701 Telephone: 000.000.0000 Email: Xxxxx.Xxxx@xxx.xxxxx.xxx Re: Request for Authorization for Remaining Work (Revision 1) Construction Materials Inspections and Testing Services Capitol Complex Pedestrian Mall and Underground Parking Garage (Package 6) 0000 Xxxxxxxx Xxxxxx Austin, Texas 78701 Terracon Project No. 96191231 Dear Xx. Xxxx, Terracon has provided services for the above referenced project under the previously executed agreement (TFC Contract No. 00-000-000 dated June 2, 2020). The previously authorized budget for Terracon’s services was $1,000,000. The previously executed agreement expired on June 20, 2022. We overlooked the contract expiration date until it was brought to our attention on August 2, 2022. A review of our records indicates that we have provided $628,262.25 in services billed prior to the expiration of the previously executed agreement (Terracon Invoice No. TG86559 dated 06/10/2022 for services provided thru 05/28/2022 is last invoice submitted prior to expiration of original agreement). Terracon has continued to provide construction materials inspections and testing services as requested by the contractor after the previously executed agreement expired on June 20, 2022. A review of our records indicates that we have provided $34,408.00 in services to be billed since the last invoice was issued prior to the expiration of the previously executed agreement that expired on June 20, 2022. Please see table below for a summary of our billing for these services: SUMMARY OF BILLING SINCE EXPIRATION OF ORIGINAL CONTRACT (REVISION 1) Terracon Invoice No. TG98983 dated 07/05/2022 (services provided thru 06/25/2022) $ 8,142.75 Terracon Invoice No. TH12911 dated 08/01/2022 (services provided thru 07/23/2022) $ 7,130.50 Terracon Invoice No. TH27192 dated 08/29/2022 (services provided thru 08/20/2022) $ 9,247.00 Terracon Invoice No. TH43791 dated 10/04/2022 (services provided thru 09/17/2022) $ 9,887.75 TOTAL BILLED AFTER CONTRACT EXPIRATION ON JUNE 20, 2022 $ 34,408.00 Terracon Consultants, Inc. 0000 Xxxxxxxxxx Xxxx Xxxx, Xxx. 000 Xxxxxx, Xxxxx 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Dear Xx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 [512] 442-1122 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Inc. (RKCI) is pleased to submit our proposal to provide [512] 442-1181 xxxxxxxx.xxx We have estimated the construction materials observation and testing cost for the remaining services on anticipated for the project referenced aboveat $50,000. We propose an The estimated budget of $1,428.90 cost for testing and observation these services for the referenced project. This budget is based on our understanding an assumed burn rate of $10,000 per month and an assumed duration of about 5-months ending mid-February 2023. Therefore, we are requesting a budget allocation of $84,408.00 for services that have been provided after the expiration of the projectoriginal contract on 06/20/2022 ($34,408) and for the anticipated services to be provided for the remainder of the project ($50,000). Please see the table below for additional information. Terracon Project No. 96191231 October 4, an estimate 2022 REQUEST FOR NEW CONTRACT FOR REMAINING SERVICES (REVISION 1) Total Billed for Services Provided After Contract Expiration on 06/20/2022 (thru Invoice No. TH43791 dated 10/04/2022 for Services Provided thru 09/17/2022) $ 34,408.00 Estimated Cost for Remaining Services to be Provided After 09/17/2022 Based on assumed burn rate of quantities, and past experience $10,000 per Month thru Mid February 2023 (~5 Months) $ 50,000.00 TOTAL BUDGET Requested for Services Provided After Contract Expiration 06/20/2022 $ 84,408.00 We are continuing to respond to requests for services with similar projects. A cost estimate breakdown is presented the expectation that this budget allocation request will be authorized in the attached spreadsheetnear future. Construction sequencingIf you anticipate any issues with authorization for these services or if you do not want Terracon to continue to respond to requests for services at this time, delaysplease notify us immediately. As you know, and the number of times that the client or their representative requests charges for our services will affect be based on the suggested budget. Services will be actual quantity of services provided on a call out basis for and the cost estimate spreadsheet attached to this proposalunit rates provided in the existing contract. The above estimate does not include consulting or testing services that may be required in addition to the scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement services previously established for the referenced this project. Please sign this proposal, initial every page of each attachment, fill out We will continue to respond to the Report Distribution List, and return one signed original contractor’s scheduling requests for services unless directed to our office as authorization for RKCI to provide these servicesdo otherwise by the owner. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI We appreciate the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services be of service to you during the construction of on this project. If you have any questions concerning our proposal regarding this request or if you need any additional information, please call us contact me at (000) 000 0000your convenience. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3Sincerely, 2023 Very truly yoursTerracon Consultants Inc. Registration Number F-3272 Xxxxxxxxx X. Xxxxxx, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX P.E. Xxxxxxxxxxx X. Xxxxxx, P.E. Project Manager, Construction Services Department Manager, Construction Services ADH/CPS/DLP Responsive ■ Resourceful ■ Reliable TERRACON CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23CONTRACT NO. 00-051000-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 000 ASSIGNMENT NO. 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacEXHIBIT B APPROVED HUB SUBCONTRACTING PLAN

Appears in 1 contract

Samples: www.tfc.texas.gov

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXTERRACON CONSULTANTS, INC. By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx.Xxxxx Xxxxxxxxxxx, P.E. Executive Director Sr. Vice President and COO Date signed: 03/07/2022 | 8:59 AM CST Date signed: 03/07/2022 | 8:28 AM CST Approved: Xxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx Xxx Xxxxxxxx Dir/Xxxxx Xxxxx DED/Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3February 7, 2023 Xx. Xxxxxxx Xxxxxxxx TFC 2022 Texas Facilities Commission Minor Construction 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx 00000 Attention: Xx. Xxx Xxxxxxxx – Project Manager Phone: (000) 000-0000 E-mail: Xxx.Xxxxxxxx@xxx.xxxxx.xxx Re: Construction Materials Testing Proposal for Asbestos Consulting Services Camp Xxxxxx X. Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Dear Office Building 000 Xxxx 00xx Xxxxxx Xxxxxx, Xxxxx 00000 Terracon Proposal No. P96217106 Revision 1 Xx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Inc. (RKCI) is pleased to submit our proposal to provide the construction materials observation and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services for the referenced project. This budget is based on our understanding of the project, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPac:

Appears in 1 contract

Samples: www.tfc.texas.gov

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXXXXXXXX CONSULTANTS, INC. By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx., P.E. PE Executive Director Sr. Senior Vice President and COO Date signedof execution: Date signed12/03/2020 | 4:44 PM CSDT ate of execution: Approved12/03/2020 | 1:21 PM PST PM DGC Dir DED EXHIBIT A DocuSign Envelope ID: Xxx 0DD73019-14C6-4693-9315-F1FC00C8B6FB TFC Contract No.00-000-000 Assignment No. 8 Exhibit A Xxxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx Xxxxxxxx Dir/Xxxxx Xxxxx DED/Xxxx X. Xxxx TFC IDIQ C Consultants, Inc. RABA [Delivered Delivery by E mail toEmail: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 xxxxxxx.xxxxxxxx@xxx.xxxxx.xx.xx0 Proposal No. PAA20-141-00 March 3October 19, 2023 2020 Revision No. 1 Xx. Xxxxxxx Xxxxxxxx TFC Senior Project Manager Facilities Design & Construction Texas Facilities Commission 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxx Xxxxxx, Xxxxx 00000 ReRE: Construction Materials Testing Services Proposal for Geotechnical Engineering Study Camp Xxxxxxx, Building 1 New Garage/Carport Building 0000 Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Xxxxxx Austin, Texas Dear Xx. Xxxxxxxx: XXXXXXX 0000 Xxxxxxx Xxxx, Xxxxx X-000 XxxxxxSuite B-150 Austin, XX 00000 TX 78754 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Inc. (RKCI) is pleased to submit our this proposal to provide the construction materials observation and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services Geotechnical Engineering Services for the above referenced project. This budget is based on The broad objectives of our study will be to determine soil conditions at the site and to develop foundation design recommendations and construction guidelines for support of the new garage/carport building associated with Building 1 at Camp Xxxxxxx in Austin, Texas. Our services will be performed ·in general accordance to the Indefinite Delivery Indefinite Quantity Professional Services Agreement contract between Texas Facilities Commission and RKCI (TFC Contract No. 00-000-000 Amendment 1 effective September 1, 2019) Described in this proposal are: • our understanding of the project, an estimate of quantities, pertinent project characteristics; • our proposed scope for field and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests laboratory study; • our services will affect the suggested budget. Services will be provided on a call out basis proposed scope for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, engineering evaluation and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, ; • our tentative project schedule; and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPaclump sum study cost.

Appears in 1 contract

Samples: Professional Services Agreement

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXXXXX, XXXXXXX & ASSOCIATES, INC. By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx., P.E. Xxx Xxxxx Executive Director Sr. Vice President and COO Project Principal / Program Manager Date signed: 11/01/2022 | 10:49 AM CDT Date signed: 11/01/2022 | 10:46 AM CDT Approved: Xxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx Xxxxxxxx Xxxxx Xxxx Dir/Xxxxx Xxxxx DED/Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail toDocuSign Envelope ID: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3895E7366-E760-4ADE-BFE0-08CAD7256798 September 21, 2023 Xx2022 Mr. Xxxxx Xxxx AIA, LEED AP, CTCM Sr. Xxxxxxx Xxxxxxxx TFC Project Manager Texas Facilities Commission Facilities Design & Construction 0000 Xxx Xxxxxxx Xxxxxxxxx XxxxxxXxxx. Austin TX 78701 xxxxx.xxxx@xxx.xxxxx.xxx RE: TFC Contract 00-000-000 IDIQ Assignment Xxxxx, Xxxxx 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Dear Xx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Inc. (RKCI) is pleased CobbFendley appreciates the opportunity to submit our proposal to provide assist the construction materials observation and testing services Texas Facilities Commission on the project referenced aboveCapitol Complex Project closeout. We propose an estimated budget of $1,428.90 for testing Below, please find our scope and observation services fee for the referenced projectrequested services. This budget is based on our understanding of the projectProject Management CobbFendley will manage meetings, an estimate of quantitiessubconsultants, invoicing, and past experience with similar projects. A cost estimate breakdown is presented in general project management duties from the attached spreadsheet. Construction sequencingNotice to Proceed date until December 31, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis 2022 for the cost estimate spreadsheet attached to this proposal. The scope of work and 2UTL related items. Scope also includes the observation and testing upload of needed documents to ProjectMates as required. XxxxXxxxxxx will also attend up to 4 hours of meetings per week for the duration of this scope of work. Fee: $10,312.00 ECM International, Inc. Civil Engineering Services Scope See included attachment. Fee: $41,392.00 3rd Party Plan Review CobbFendley will provide QA/QC design review services for 6TXM of the following Capitol Complex (CAPCOM) / Project #00-0000-0000 located on Brazos Street from MLK to 18th Street, Austin, Texas. The 6TXM consists of the final civil construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement site improvements for the referenced project1801 Congress Office Building site. Please sign this proposalThe purpose of the review is to address completeness, initial every page coordination and constructability of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these A/E documents provided. Below is a detailed scope of services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPac.

Appears in 1 contract

Samples: www.tfc.texas.gov

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXSUNLAND GROUP, INC. By: By: Xxxx Xxxxx Xxxxxxx XxxxxxxXxxx Xxxxxx, Xx., P.E. AIA Executive Director Sr. Vice President and COO of Architecture Date signed: 10/03/2022 | 8:52 AM CDT Date signed: 10/03/2022 | 6:46 AM PDT Approved: Xxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx Xxxxx Xxxxxxxx Dir/Xxxxx Xxxxx DED/Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3Contract No. 00-000-000 The Sunland Group, 2023 XxInc. Assignment No. Xxxxxxx 1 Exhibit A (24 Pages) September 20, 2022 Xxxxx Xxxxxxxx TFC Texas Facilities Commission Facilities Design & Construction 0000 Xxx Xxxxxxx Xxxxxxxxx XxxxxxXxxx. Austin, Xxxxx 00000 TX 78701 Re: Construction Materials Testing Professional Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Dear Xxfor TJJD New Facilities Feasibility Report Xxxxx, 0000 Xxxxxx Xxxxx Xxxxx Suite 350 Austin, Texas 78754 512.494.0208 t 512.494.0406 f xxx.xxxxxxxxxx.xxx We value the opportunity to bring our professional expertise to your project and continuing our long-lasting relationship with your organization. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Inc. (RKCI) Below is pleased to submit our proposal to provide the construction materials observation and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services for the referenced project. This budget is based on our understanding of the projectproject and the scope needed to provide professional services: Summary: Prepare a feasibility study by the 1st week of December 2022, an estimate of quantitieswhich will be utilized by TJJD to request funds in the upcoming Legislative Session. TJJD will be requesting funds for three new secure juvenile residential facilities. Our services will provide design and construction estimates for the upcoming legislative session. TJJD is requesting two 48-56 bed facilities and one 40 bed mental health facility located strategically around Texas. In addition to having individual rooms with plumbing to accommodate the population, these facilities will need to have space for education, recreation, security, treatment, and past experience with similar projectsmedical facilities. A cost estimate breakdown is presented in As part of the attached spreadsheet. Construction sequencingstudy, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis XXXX would like for the cost estimate spreadsheet attached report to this proposal. The scope of work includes propose locations with approximate price for the observation land and testing size of the following construction materials: Concrete compressive strength specimen sampling, testing, and reportingland needed. This proposal may serve They want to locate the facilities close populated urban centers but not too close to one of the county run facilities as RKCI’s work agreement to prevent competing for staff. Attached is appendix A which lists all post adjudication facilities operated by county probation departments which we need to stay away from; proposed new facilities will have to be in different locations from the referenced project. Please sign facilities in this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacattached list.

Appears in 1 contract

Samples: www.tfc.texas.gov

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXTERRACON CONSULTANTS, INC. By: By: _ Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx.Xxxxx Xxxxxxxxxxx, P.E. Executive Director Sr. Vice President and COO Date signedof execution: Date signed06/11/2021 | 3:48 PM CDDTate of execution: Approved: Xxx Xxxxxxx Assistant General Counsel 06/11/2021 | 3:31 PM CDT PM/Xxxxxxx Xxxxxxxx JF Dir/Xxxxx Xxxxx MW DED/Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail toJSR DGC/SEH DocuSign Envelope ID: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 31645F9E5-7E7D-4C3C-8080-ADFD2CCA6144 May 5, 2023 2021 Xx. Xxxxxxx Xxxxxxxx TFC Xxx Xxxxxxxx, PMP, CTCM Texas Facilities Commission 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxx. Xxxxxx, Xxxxx 00000 Telephone: 000.000.0000 Email: xxx.xxxxxxxx@xxx.xxxxx.xxx Re: Construction Materials Observation and Testing Services Camp Xxxxxxx CH6 TFC Para-Transit Stop Concrete Testing Camo Xxxxxxx Campus on N MoPac 00xx Xxxxxx xxx Xxxxxxxx Xxxxxx Xxxxxx, Xxxxx 00000 Terracon Consultants Inc. Proposal No. P96211111 Dear Xx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Thank you for selecting Terracon Consultants Inc. (RKCI) is pleased to submit our proposal to provide the construction materials observation and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services for the referenced TFC Para-Transit Stop Concrete Testing project. This budget is based on proposal outlines our understanding of the project, an estimate scope of quantities, services to be provided by Terracon and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our includes unit fees for services will affect the suggested budget. Services we anticipate will be provided on a call out basis required for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPac.

Appears in 1 contract

Samples: www.tfc.texas.gov

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. [INTENTIONALLY LEFT BLANK – SIGNATURE PAGE FOLLOWS] This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXENGINEERING AND ENVIRONMENTAL CONSULTING, INC. By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx.Xxxx, P.E. Executive Director Sr. Vice President and COO Date signed: 05/19/2022 | 11:18 AM CDT Date signed: 05/19/2022 | 9:05 AM PDT Approved: Xxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx Xxxxxxxx Xxxxxx Dir/Xxxxx Xxxxx DEDMgr/Xxxxxx Xxxxxxxx COO/Xxxx X. Xxxx Xxxxxxx TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 Contract 22-058-000 March 317, 2023 Xx. Xxxxxxx Xxxxxxxx TFC 2022 Texas Facilities Commission 0000 Xxx Xxxxxxx Xxxxxxxxx X.X. Xxx 00000 Xxxxxx, Texas 78701-3047 Sent via electronic mail to: Xxxxxxx.xxxxxx@xxx.xxxxx.xxx Attention: Xx. Xxxxxxx Xxxxxx Reference: Proposal for Mold Remediation Protocol & Clearance Services Xxxx X. Xxxxxx Building – 5th Floor Telecom Rooms 000 X. 00xx Xxxxxx, Xxxxxx, Xxxxx 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Xxxx Engineering Document No. 221008-5.020 Dear Xx. XxxxxxxxXxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX ConsultantsXxxx Engineering and Environmental Consulting, Inc. (RKCIXxxx Engineering) is pleased to submit our this proposal to provide the construction materials observation a mold remediation protocol and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation mold remediation clearance services for the referenced projectXxxx X. Xxxxxx Building – 5th Floor Telecom Rooms, located at 000 X. 00xx Xxxxxx, Xxxxxx, Xxxxx (Site). This budget proposal is based on information provided by you and our understanding of the project, an estimate of quantities, and past experience with similar projects. PROJECT INFORMATION On March 3, 2022, Xxxx Engineering performed a mold assessment at the Site and determined that mold remediation was appropriate for the conditions observed. The Texas Department of Licensing and Regulations (TDLR) regulates mold remediation activities that involve amounts of “contiguous” mold greater than 25 square feet (ft2). At the time of the mold assessment, and based on the analytical data, the extent of the observed mold did exceed the 25 ft2 threshold in the areas assessed. Xxxx Engineering was asked to: • Prepare a mold remediation protocol; • Perform mold remediation clearance services, including clearance air sampling; and • Prepare a report of the mold remediation & clearance air sampling results. LABORATORY INFORMATION: • EMSL Analytical – Mold air samples for clearance, 6-hour turn around time (TAT). QUALIFICATIONS • A cost estimate breakdown is Xxxx Engineering Mold Assessment Consultant (MAC) licensed by the TDLR shall prepare the mold remediation protocol, be on-Site prior to the start of remediation activities to meet with the remediation contractor’s personnel, perform final visual assessment, and clearance sampling. TFC IDIQ Contract 00-000-000 Texas Facilities Commission: 221008-5.020 March 17, 2022 Mold Remediation Protocol & Clearance Services Page 0 Xxxx X. Xxxxxx Building, Austin, Texas FEE AND SCHEDULE INFORMATION Xxxx Engineering will invoice the above-described scope of services on the actual time required and expenses incurred in accordance with the existing contract between Xxxx Engineering and the Texas Facilities Commission. The table below outlines our estimated fees for this project: Description Xxxx Personnel Title Rate Hours/Units Total Labor Project Management Project Manager $162.18 2 $324.36 Administrative Assistance Administrative Assistant $101.66 1 $101.66 Prepare Mold Remediation Protocol Mold Assessment Consultant $220.51 5 $1,102.55 Attend pre-remediation kick-off meeting & perform post-remediation clearance services Mold Assessment Consultant $220.51 4 $882.04 Prepare Protocol & Report Drawings CADD Operator $121.65 2 $243.30 Format and Prepare Mold Remediation Report Mold Assessment Consultant $220.51 5 $1,102.55 Protocol & Report QC – Technical Mold Assessment Consultant $220.51 2 $441.02 Protocol & Report QC – Final Project Manager $162.18 2 $324.36 Labor Total $4,521.84 Reimbursable Expenses Lab Analysis Fees – Mold Air Samples (6-hour TAT) EMSL Analytical $74.03 4* $296.12 Postage/Shipping EMSL Analytical $45.00 2* $90.00 Expenses Total $386.12 Project Total $4,907.96 *Two air samples including one control will be collected for clearance testing. If the first clearance fails, the same procedure will be repeated for a second clearance sampling. Requests for additional services, beyond the scope of services presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachmentwill be based on the time required and expenses incurred in accordance with rates shown in the table above. Actual time and expenses may vary by line item from the breakdown shown above, fill out but we will not perform additional services or exceed the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue proposed fee total without your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacprior written authorization.

Appears in 1 contract

Samples: www.tfc.texas.gov

Entire Agreement and Modification. The This Agreement and this Assignment and their its integrated attachment(s) constitute the entire agreement of the Parties parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment Agreement specifically displays a mutual intent to amend a particular part of this AssignmentAgreement, general conflicts in language between any such attachment and this Assignment Agreement shall be construed consistently with the terms of this AssignmentAgreement. Unless otherwise expressly authorized by the terms of this AssignmentAgreement, no modification, renewal, extension, or amendment to this Assignment Agreement shall be binding upon the Parties parties unless the same is in writing and signed by the respective Parties parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXTTL, INC. By: By: Xxxx Xxxxx Xxxxxxx XxxxxxxXxxxx Xxxxxxxxx, Xx., P.E. P.G. Executive Director Sr. Vice President and COO Date signed: 11/15/2021 | 8:31 AM CST Date signed: 11/15/2021 | 6:23 AM PST Approved: Xxx Xxxxxxx Assistant General TFC Legal Counsel PM/Xxxxxxx Xxxxxxxx Dir/Xxxxx X. Xxxxx DED/Xxxx X. X. Xxxx Exhibit A 2015 Uniform General Conditions The 2015 Uniform General Conditions (hereinafter referred to as "UGC") are located at this TFC IDIQ C Construction Contracts website link, at 5C in PDF: xxxxx://xxx.xxx.xxxxx.xxx/divisions/facilities/prog/construct/formsindex/2015%20UGC%20 03.07.2017.Final.pdf Exhibit B TFC 2018 Architectural/Engineering Guidelines, Edit Date March 19, 2018. The A/E Guidelines are located at this TFC A/E Forms link in PDF: https://xxx.xxx.xxxxx.xxx/divisions/facilities/prog/construct/formsindex/01%20-%202018% 20A-E%20GUIDELINES.pdf DocuSign Envelope ID: B56BF2B7-588F-4C84-A138-5DFF8EC679B5 INDEFINITE DELIVERY INDEFINITE QUANTITY PROFESSIONAL SERVICES AGREEMENT BETWEEN THE TEXAS FACILITIES COMMISSION AND [Delivered INSERT NAME] TFC CONTRACT NO. [INSERT NUMBER] ASSIGNMENT NO. X This Indefinite Delivery Indefinite Quantity Assignment No. X (hereinafter referred to as “Assignment No. X” or “Assignment”) is entered into by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3and between the Texas Facilities Commission, 2023 Xx. Xxxxxxx Xxxxxxxx TFC located at 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxxxxx, Xxxxxx, Xxxxx 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Dear Xx(hereinafter referred to as “TFC”) and [Insert PSP Name] located at [Insert Address] (hereinafter referred to as “PSP”) (TFC and PSP are hereinafter referred to individually as a “Party” or collectively as “Parties”), to be subject to the terms and conditions of TFC Contract No. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Inc. [Insert] (RKCI) is pleased hereinafter referred to submit our proposal to provide as the construction materials observation and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services for the referenced project. This budget is based on our understanding of the project, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays“Agreement”), and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacfollowing.

Appears in 1 contract

Samples: Engineering Services Agreement

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXX, INC. [INSERT PSP NAME] By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx., P.E. Print Name: Executive Director Sr. Vice President and COO Print Title: Date signed: Date signed: Approved: Xxx Xxxxxxx Assistant General TFC Legal Counsel PM/Xxxxxxx Xxxxxxxx PM/ Dir/Xxxxx X. Xxxxx DED/X.X. Xxxx X. DocuSign Envelope ID: 275C4129-B153-448C-AB7A-E19E1DEECC97 DocuSign Envelope ID: 275C4129-B153-448C-AB7A-E19E1DEECC97 Summary of Practice History Organizational Chart TEXAS FACILITIES COMMISSION PROJECT MANAGER/PIC XXXXXXX XXXXXXX, XX., PE CENTRAL TEXAS XXXXXX XXXXXX, PE Xxxxxx Xxxxx, PE Supported by 51 additional fleld & Lab Technicians EAST TEXAS XXXXXXX XXXXXX, PE, PMP Xxxxx Xxxxxxx, ACI, NICET IV Supported by 24 additional fleld & Lab Technicians HOUSTON AREA XXXXXX XXXX, PE Xxxx TFC IDIQ C [Delivered Xxxxx, PE Supported by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 347 additional fleld & Lab Technicians RIO GRANDE VALLEY XXXXXX XXXXXXX, 2023 Xx. Xxxxxxx Xxxxxxxx TFC 0000 Xxx Xxxxxxx Xxxxxxxxx PE Xxxxx Xxxxx, EIT Xxxx Xxxxxxx, ACI Supported by 25 additional fleld & Lab Technicians SOUTH TEXAS XXXXX XXXXXX, PE Xxxx Xxxxxx, PE Xxx Xxxxx, PE Supported by 71 additional fleld & Lab Technicians NORTH TEXAS XXXXXXX XXXXXX, PE, PMP Xxxxx 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Dear Xx. Xxxxxxxx: 0000 Xxxxxxx XxxxXxxxxxx, Xxxxx X-000 XxxxxxACI, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Inc. (RKCI) is pleased to submit our proposal to provide the construction materials observation and testing services NICET IV Supported by 24 additional fleld & Lab Technicians GEOTECHNICAL DRILLING Eagle Drilling* Van & Sons Drilling* Coretech Drilling* NON DESTRUCTIVE TESTING SUPPORT Xxxxxx Management LLC* Detailed Resumes can be found on the project referenced abovefollowing pages. We propose an estimated budget of $1,428.90 for testing CONFIDENTIAL AND PROPRIETARY INFORMATION * HUB Firm Texas Facilities Commission | RFQ #000-0-00000 IDIQ Geotechnical and observation services for the referenced project. This budget is based on our understanding of the project, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materialsCMT 7 DocuSign Envelope ID: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By275C4129-B153-448C-AB7A-E19E1DEECC97 DocuSign Envelope ID: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH275C4129-B153-448C-AB7A-E19E1DEECC97 DocuSign Envelope ID: am Attachments275C4129-B153-448C-AB7A-E19E1DEECC97 DocuSign Envelope ID: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23275C4129-051B153-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name448C-AB7A-E19E1DEECC97 DocuSign Envelope ID: Camp Xxxxxxd CH6 concrete testing Project Location275C4129-B153-448C-AB7A-E19E1DEECC97 DocuSign Envelope ID: Camp Xxxxxxd Campus on N MoPac Contact Name275C4129-B153-448C-AB7A-E19E1DEECC97 DocuSign Envelope ID: Xxxxxxx Xxxxxxxx Client275C4129-B153-448C-AB7A-E19E1DEECC97 DocuSign Envelope ID: TFC Address275C4129-B153-448C-AB7A-E19E1DEECC97 DocuSign Envelope ID: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number275C4129-B153-448C-AB7A-E19E1DEECC97 DocuSign Envelope ID: 000.000.0000 (O) 000.000.0000 (M) E Mail275C4129-B153-448C-AB7A-E19E1DEECC97 DocuSign Envelope ID: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General275C4129-B153-448C-AB7A-E19E1DEECC97 DocuSign Envelope ID: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPac275C4129-B153-448C-AB7A-E19E1DEECC97 DocuSign Envelope ID: 275C4129-B153-448C-AB7A-E19E1DEECC97 DocuSign Envelope ID: 275C4129-B153-448C-AB7A-E19E1DEECC97

Appears in 1 contract

Samples: Professional Engineering Services Agreement

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXX, INC. By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx., P.E. Executive Director Sr. Vice President and COO Date signed: 05/26/2022 | 4:20 PM CDT Date signed: 05/26/2022 | 12:19 PM PDT Approved: Xxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx Xxxxxxxx Dir/Xxxxx Xxxxx DED/Xxxx X. Xxxx TFC IDIQ C [Delivered Delivery by E mail toEmail: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx xxxxxxx.xxxxxxxx@xxx.xxxxx.xx.xx] PAD23 051 00 March 3Proposal No. PAA22‐102‐00 May 2, 2023 2022 Xx. Xxxxxxx Xxxxxxxx TFC Senior Project Manager Facilities Design & Construction Texas Facilities Commission 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxx Xxxxxx, Xxxxx 00000 ReRE: Construction Materials Testing Services Proposal for Geotechnical Engineering Study Camp Xxxxxxx, Building 5 Replacement 0000 Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Xxxxxx Austin, Texas Dear Xx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Inc. (RKCI) is pleased to submit our this proposal to provide the construction materials observation and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services Geotechnical Engineering Services for the above referenced project. This budget is based on The broad objectives of our study will be to determine soil conditions at the site and to develop foundation design recommendations and construction considerations for support of a new Building 5 at Camp Xxxxxxx in Austin, Texas. Our services will be performed in general accordance to the Indefinite Delivery Indefinite Quantity Professional Services Agreement contract between Texas Facilities Commission and RKCI (TFC Contract No. 22‐091‐000) Described in this proposal are: • our understanding of the project, an estimate of quantities, pertinent project characteristics; • our proposed scope for field and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests laboratory study; • our services will affect the suggested budget. Services will be provided on a call out basis proposed scope for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, engineering evaluation and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, ; • our tentative project schedule; and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPaclump sum study cost.

Appears in 1 contract

Samples: www.tfc.texas.gov

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXTERRACON CONSULTANTS, INC. _______________________________ By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx., P.E. Xxx Xxxxx Date of execution: Executive Director Sr. Vice President and COO Project Consultant Date signedof execution: Date signedPM 04/29/2021 | 2:20 PM CDT 04/29/2021 | 2:18 PM CDT DGC Dir DED DocuSign Envelope ID: Approved: Xxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx Xxxxxxxx Dir/Xxxxx Xxxxx DED/Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 381E25826-88E9-45D3-8845-9A374D69E3E0 April 12, 2023 Xx. Xxxxxxx Xxxxxxxx TFC 2021 Texas Facilities Commission Facilities Design & Construction 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx 00000 Attn: Xx. Xxx Xxxxxxxx – Project Manager T: (000) 000-0000 M: (000) 000-0000 E: Xxx.Xxxxxxxx@xxx.xxxxx.xxx Re: Proposal for Limited Path-of-Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Dear Asbestos Survey Xxxxx Xxxxxx Building 0000 Xxxxx Xxxxx Xxxxxxxxx Austin, Texas 78751 Terracon Proposal No. P96217275 TFC Work Order No. 00-000-0000 Xx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Terracon Consultants, Inc. (RKCITerracon) is pleased to submit our this proposal to provide limited asbestos inspection services at the construction materials observation and testing services on the project above-referenced abovelocation. We propose an estimated budget understand the purpose of $1,428.90 for testing and observation services for this survey is to identify asbestos-containing materials (ACM) in the referenced project. This budget is based on our understanding path of the projectplanned renovations (East End Corridors and Freight Elevator Lobby on 1st Floor; Break Rooms on 2nd, an estimate of quantities4th, 5th, and past experience with similar projects. A cost estimate breakdown is presented in 6th Floors) at the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposalXxxxx Xxxxxx Building (BHB). The scope of work includes services is intended to meet state and federal requirements for asbestos inspection projects conducted prior to renovation or demolition of public buildings. Terracon understands that you will issue a Purchase Order and arrange site access to conduct the observation limited survey if this proposal is accepted. PROPOSED SCOPE OF SERVICES Task 1 - Asbestos Inspection Services Terracon Consultants, Inc. 0000 Xxxxxxxxxx Xxxx Xxxxxxxxx, Xxx. 000 Xxxxxx, Xxxxx 00000 P ( 512) 442- 1122 F ( 512) 442- 1181 xxxxxxxx.xxx Terracon will mobilize a Texas Department of State Health Services (TDSHS) licensed Asbestos Inspector to conduct a limited asbestos survey as required by US Environmental Protection Agency (USEPA) regulation 40 CFR Part 61, National Emissions Standards for Hazardous Air Pollutants (NESHAP) and testing the TDSHS Texas Asbestos Health Protection Rules. Terracon will conduct a visual assessment of the following construction materialsselected building areas to identify materials suspected of containing asbestos (suspect ACM). Suspect materials will be physically assessed for friability and evidence of damage or degradation. Samples of suspect ACM will DocuSign Envelope ID: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement 81E25826-88E9-45D3-8845-9A374D69E3E0 be collected for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacanalysis.

Appears in 1 contract

Samples: www.tfc.texas.gov

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXXXXXXX PARKING CONSULTANTS / ENGINEERS, INC. ., dba XXXXXX CONSULTANTS By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx.X. Xxxxxxxxxx, P.E. Executive Director Sr. Vice President and COO Date signed: 02/03/2022 | 1:38 PM CST Date signed: 02/03/2022 | 12:45 PM CST Approved: Xxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx Xxx Xxxxxxxx Dir/Xxxxx Xxxxx DED/Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 300000 Xxxxxxxx Xxxx., 2023 Xx. Xxxxxxx Xxxxx 000 Xxxxxx, Xxxxx 00000 281.280.0068 xxxxxxxxxxxxxxxxx.xxx October 6, 2021 Xxx Xxxxxxxx TFC Project Manager Facilities Design & Construction Texas Facilities Commission 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx 00000 Re: Construction Materials Testing Revised Proposal for Xxxxxx X. Xxxxxxxx Building Additional Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac – 11th Floor Fire Code Compliance Design Modifications 000 Xxxxxxxx Xx. Xxxxxx, Xxxxx 00000 Dear Xx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx Consultants (Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Inc. (RKCI) is pleased to submit our submit, for your review, this revised proposal to provide the construction materials observation and testing additional professional services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services in our role as consultant for the referenced projectXxxxxx X. Xxxxxxxx Building located in Austin, Texas. This budget is based on our proposal provides an understanding of the project, an estimate of quantitiesobjectives, and past experience with similar projects. A cost estimate breakdown is presented in description of the attached spreadsheet. Construction sequencingproposed scope of services, delaysschedule, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached fee and has been revised to this proposal. The include additional scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacdiscussions in late September.

Appears in 1 contract

Samples: www.tfc.texas.gov

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXWOOD ENVIRONMENT & INFRASTRUCTURE SOLUTIONS, INC. By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx., P.E. Xxxxx Xxxxxx Executive Director Sr. Vice President and COO Associate Industrial Hygienist 02/05/2021 | 3:27 PM CST 02/05/2021 | 2:55 PM CST Date signedof execution: Date signedof execution: ApprovedPM DGC Dir DED EXHIBIT A October 28, 2020 Xx. Xxxx Xxxxx Project Manager Texas Facilities Commission Facilities Design & Construction Subject: Xxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx Xxxxxxxx Dir/Proposal for Asbestos Consulting Services Texas Department of Public Safety, Austin Headquarters 0000 Xxxxx Xxxxx DED/Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3Xxxxxxxxx, 2023 XxAustin, Texas 78752 Wood Proposal No. Xxxxxxx Xxxxxxxx TFC 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac 670620AU15.02 Dear Xx. XxxxxxxxXxxxx: Xxxx Environment & Infrastructure Solutions, Inc. 0000 X. Xxxxxxx Xxxxxx Xxxxx Xxx, Xxxxx X-000 XxxxxxXxx 000 Austin, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX ConsultantsTexas 78704 T: 000-000-0000 xxx.xxxxxxx.xxx Wood Environment & Infrastructure Solutions, Inc. (RKCIWood) is pleased appreciates the opportunity to submit present our proposal to the Texas Facilities Commission (TFC) to provide asbestos survey services prior to upcoming renovations at the construction materials observation Texas Department of Public Safety (DPS) Austin Headquarters, Buildings A, C and testing services on the project referenced above. We propose an estimated budget of $1,428.90 E. In addition, we are providing a cost estimate for testing abatement design and observation services for the referenced projectmonitoring, as requested by TFC. This budget is based on proposal presents our understanding approach to providing asbestos survey, design and monitoring services, using our multi-disciplinary capabilities and knowledge of the projectasbestos surveys and asbestos abatements. The following sections present our Scope of Work, an estimate of quantitiesSchedule, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposalFee Estimate. The scope of services will be performed in accordance with the terms and conditions outlined in the professional services agreement, TFC Contract 00-000-000, between the Texas Facilities Commission and Wood Environment & Infrastructure Solutions, Inc. TFC has requested Xxxx provide a proposal for Asbestos Survey, Design and Monitoring at Building A, Building C, and Building E located at the DPS Austin Headquarters, to include the following projects: • Building A Warehouse Conversion; • Building A HVAC Replacement; • Building A Roof Replacement Project; • Building C Women’s Dormitory Showers; • Building C HVAC and Chiller Replacement Project; and • Building E Roof Replacement Project. Building A Warehouse Conversion and HVAC Replacement Project: The scope of work for the asbestos survey will include sampling and analysis of building materials within the warehouse and associated office areas located north of Corridor A2C1, the vault/pallet room located south of Corridor A2C1 and the office/cubicle area located west of Corridor A2C1, as requested by TFC. In addition, the base mechanical upgrades include demolition of eleven (11) fan coil units located above ceilings and in mechanical rooms, six (6) air handler units located in mechanical rooms, one DX split system located above ceiling, one package rooftop unit, four (4) multi-zone AHUs located in mechanical rooms and penthouses, and associated controls, thermostats, compressors, ductwork, and piping. Proposal for Asbestos Consulting Services Wood Proposal No.: 670620AU15.02 DPS Buildings A and C Renovations Areas October 28, 2020 Electrical work is to include demolition of overcurrent devices and feeders to the existing equipment. Optional renovation work is to include demolition of walls, doors, and cubicle furniture in the warehouse areas. Our survey will include both base bid and optional renovation areas. Where previous asbestos-containing materials survey data is available (Penthouse Mechanical Rooms), Wood will rely on the survey data presented by others and will not re-sample suspect asbestos-containing materials within those areas. Building C Women’s Dormitory Showers/HVAC and Chiller Replacement Project: The scope of work for the asbestos survey will include sampling and analysis of building materials within second-floor showers and isolation bedrooms. It is our understanding the planned renovation project includes architectural upgrades that will disturb existing walls, ceilings, doors, floors, urinals, toilets, sinks, and showers. In addition, mechanical and electrical work is planned within the observation and testing Women’s dormitory showers to support HVAC system replacement. The mechanical demolition portion of the following construction materials: Concrete compressive strength specimen samplingproject will include demolition of one abandoned water-cooled chiller, testingfive (5) HVAC hydronic pumps, valving and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposalpiping, initial every page of each attachmentone roof-mounted crossflow cooling tower, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPactwo

Appears in 1 contract

Samples: www.tfc.texas.gov

Entire Agreement and Modification. The This Agreement and this Assignment and their its integrated attachment(s) constitute the entire agreement of the Parties parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment Agreement specifically displays a mutual intent to amend a particular part of this AssignmentAgreement, general conflicts in language between any such attachment and this Assignment Agreement shall be construed consistently with the terms of this AssignmentAgreement. Unless otherwise expressly authorized by the terms of this AssignmentAgreement, no modification, renewal, extension, or amendment to this Assignment Agreement shall be binding upon the Parties parties unless the same is in writing and signed by the respective Parties parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXX, INC. By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx., P.E. Executive Director Sr. Xxxxxx X. Xxxx Senior Vice President and & COO Date signed: 01/24/2022 | 11:30 AM CST Date signed: 01/24/2022 | 11:25 AM CST Approved: Xxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx Xxxxxxxx G.C. Dir/Xxxxx Xxxxx DED/Xxxx X. Xxxx Exhibit A 2015 Uniform General Conditions The 2015 Uniform General Conditions (hereinafter referred to as "UGC") are located at this TFC IDIQ C Construction Contracts website link, at 5C in PDF: xxxxx://xxx.xxx.xxxxx.xxx/divisions/facilities/prog/construct/formsindex/2015%20UGC%20 03.07.2017.Final.pdf Exhibit B TFC 2018 Architectural/Engineering Guidelines, Edit Date March 19, 2018. The A/E Guidelines are located at this TFC A/E Forms link in PDF: https://xxx.xxx.xxxxx.xxx/divisions/facilities/prog/construct/formsindex/01%20-%202018% 20A-E%20GUIDELINES.pdf DocuSign Envelope ID: 2B07CD0C-DE7C-4B5F-AD1C-D96E2E430AD7 INDEFINITE DELIVERY INDEFINITE QUANTITY PROFESSIONAL SERVICES AGREEMENT BETWEEN THE TEXAS FACILITIES COMMISSION AND [Delivered INSERT NAME] TFC CONTRACT NO. [INSERT NUMBER] ASSIGNMENT NO. X This Indefinite Delivery Indefinite Quantity Assignment No. X (hereinafter referred to as “Assignment No. X” or “Assignment”) is entered into by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3and between the Texas Facilities Commission, 2023 Xx. Xxxxxxx Xxxxxxxx TFC located at 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxxxxx, Xxxxxx, Xxxxx 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Dear Xx(hereinafter referred to as “TFC”) and [Insert PSP Name] located at [Insert Address] (hereinafter referred to as “PSP”) (TFC and PSP are hereinafter referred to individually as a “Party” or collectively as “Parties”), to be subject to the terms and conditions of TFC Contract No. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Inc. [Insert] (RKCI) is pleased hereinafter referred to submit our proposal to provide as the construction materials observation and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services for the referenced project. This budget is based on our understanding of the project, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays“Agreement”), and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacfollowing.

Appears in 1 contract

Samples: Engineering Services Agreement

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXX, INC. XXXXXX CONSULTANTS By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx.Xxxxxx X. Xxxxxxxxxx, P.E. Executive Director Sr. Senior Vice President and COO Date signed: 05/08/2023 | 10:46 AM CDT Date signed: 05/08/2023 | 9:54 AM CDT Approved: Xxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx Xxxxxxxx Xxxxxx Xxxxxx Dir/Xxxxx Xxxxx DED/Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3, 2023 Xx. Xxxxxxx Xxxxxxxx TFC 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Dear Xx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Inc. (RKCI) is pleased to submit our proposal to provide the construction materials observation and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services for the referenced project. This budget is based on our understanding of the project, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX XXXXXX PARKING CONSULTANTS/ENGINEERS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx XxxxxxxxxDBA XXXXXX CONSULTANTS IDIQ CONTRACT NO. 00-000-000 ASSIGNMENT NO. 3 EXHIBIT A PSP PROPOSAL 6 PAGES XXXXXX PARKING CONSULTANTS/ENGINEERS, Ph.D.INC. DBA XXXXXX CONSULTANTS IDIQ CONTRACT NO. 00-000-000 ASSIGNMENT NO. 3 EXHIBIT B LIST OF PROJECT MANAGER AND SUBCONTRACTORS 1 PAGE Exhibit B TFC IDIQ Contract No. 00-000-000 Xxxxxx Parking Consultants/Engineers, P.E. CoMET Inc., dba Xxxxxx Consultants Assignment No. 3 Project No. 00-000-0000 List of PSP Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions Subcontractors (Date) TFC IDIQ C PAD23-051-00 3 March 3Name, 2023 COST ESTIMATE BREAKDOWN Company Name, Address & Contact Person (Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacManager))

Appears in 1 contract

Samples: www.tfc.texas.gov

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXX, INC. [INSERT PSP NAME] By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx., P.E. Print Name: Executive Director Sr. Vice President and COO Print Title: Date signed: Date signed: Approved: Xxx Xxxxxxx Assistant General TFC Legal Counsel PM/Xxxxxxx Xxxxxxxx PM/ Dir/Xxxxx X. Xxxxx DED/X.X. Xxxx X. DocuSign Envelope ID: A5FC23F3-8C0B-4080-9447-6A9723D03447 DocuSign Envelope ID: A5FC23F3-8C0B-4080-9447-6A9723D03447 Xxx Xxxxxxxxx Survey Technician Xxxx Xxxxxxxx Survey Technician Xxx Xxxxx, RPLS Project Manager Xxxxx Xxxxxxx, PE Principal-in-Charge Key Staff Texas Facilities Commission Xxxxx Xxxx Land Easement/ Acquisition Manager Xxxxxx Xxxxxxx Survey-in-Training Xxxxx Xxxxx Senior Survey Technician RFQ #000-0-00000 I TFC IDIQ C [Delivered by E mail toFOR PROFESSIONAL CIVIL ENGINEERING AND LAND/UTILITY SURVEYING SERVICES I 09 DocuSign Envelope ID: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3, 2023 Xx. Xxxxxxx Xxxxxxxx A5FC23F3-8C0B-4080-9447-6A9723D03447 DocuSign Envelope ID: A5FC23F3-8C0B-4080-9447-6A9723D03447 DocuSign Envelope ID: A5FC23F3-8C0B-4080-9447-6A9723D03447 Exhibit F Criminal Background Checks and Application Guidelines The Criminal Background Checks and Application Guidelines are located at this TFC 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx 00000 ReConstruction Contracts website link at 5E in PDF: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Dear Xx. Xxxxxxxxxxxxx://xxx.xxx.xxxxx.xxx/divisions/facilities/prog/construct/formsindex/TEXAS%20FACIL ITIES%20COMMISSION%20CRIMINAL%20BACKGROUND%202016.pdf DocuSign Envelope ID: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Inc. (RKCI) is pleased to submit our proposal to provide the construction materials observation and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services for the referenced project. This budget is based on our understanding of the project, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materialsA5FC23F3-8C0B-4080-9447-6A9723D03447 DocuSign Envelope ID: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved ByA5FC23F3-8C0B-4080-9447-6A9723D03447 DocuSign Envelope ID: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AHA5FC23F3-8C0B-4080-9447-6A9723D03447 DocuSign Envelope ID: am AttachmentsA5FC23F3-8C0B-4080-9447-6A9723D03447 DocuSign Envelope ID: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23A5FC23F3-0518C0B-4080-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name9447-6A9723D03447 DocuSign Envelope ID: Camp Xxxxxxd CH6 concrete testing Project LocationA5FC23F3-8C0B-4080-9447-6A9723D03447 DocuSign Envelope ID: Camp Xxxxxxd Campus on N MoPac Contact NameA5FC23F3-8C0B-4080-9447-6A9723D03447 DocuSign Envelope ID: Xxxxxxx Xxxxxxxx ClientA5FC23F3-8C0B-4080-9447-6A9723D03447 DocuSign Envelope ID: TFC AddressA5FC23F3-8C0B-4080-9447-6A9723D03447 DocuSign Envelope ID: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone NumberA5FC23F3-8C0B-4080-9447-6A9723D03447 DocuSign Envelope ID: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacA5FC23F3-8C0B-4080-9447-6A9723D03447

Appears in 1 contract

Samples: Professional Engineering Services Agreement

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXX, INC. [INSERT PSP NAME] By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx., P.E. Print Name: Executive Director Sr. Vice President and COO Print Title: Date signed: Date signed: Approved: Xxx Xxxxxxx Assistant General TFC Legal Counsel PM/Xxxxxxx Xxxxxxxx PM/ Dir/Xxxxx X. Xxxxx DED/X.X. Xxxx X. DocuSign Envelope ID: C626945E-5729-412B-AD9E-611DA359117A DocuSign Envelope ID: C626945E-5729-412B-AD9E-611DA359117A TEXAS FACILITIES COMMISSION | IDIQ Professional Architectural Services asbestos abatement. The projects included ADA and parking improvements, requiring concrete, steel, and sub-grade compaction and moisture testing. They also required water quality testing for systems impacted by construction. ORGANIZATIONAL CHART Texas Facilities Commission PRINCIPAL-IN-CHARGE Xxxxx Xxxx, PE, LEED® AP BD+C TECHNICAL SERVICES ARCHITECTURAL/INTERIOR DESIGNER Xxxx TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3Xxxxxxxx, 2023 Xx. Xxxxxxx Xxxxxxxx TFC 0000 Xxx Xxxxxxx Xxxxxxxxx AIA, RID ARCHITECTURAL Xxxxx Xxxxx, AIA Xxxxxx Xxxxx, AIA STRUCTURAL Xxxxx Xxxxxxxx, PE, LEED® Green Assoc., ENV SP MECHANICAL Xxxx Xxxxxx, PE QUALITY CONTROL Xxxxxx Xxxxx, AIA PROJECT MANAGER Xxxxxx Xxxxx, AIA GEOTECHNICAL Xxxx Xxxxxxxx, PE ENVIRONMENTAL Xxxxxx Xxxxxxxx, PG ELECTRICAL Xxx Xxxxxxxx, PE FNI has assembled a team of highly-qualified professionals from each discipline described in the RFQ with experience in renovations of occupied and secured low-rise, mid-rise and high-rise buildings. All members of our project team have established experience with TFC projects. PLUMBING Xxxxx 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus SITE CIVIL Xxxxx Xxxxxxx, PE, LEED® AP CONSTRUCTION ADMINISTRATION Xxxxx Xxxxx Choosing a Project Team 🗸 Right people Right place 🗸Right availability We’ve put forth the advance-planning effort to verify we have the right team members, in the right place, with the right availability to meet client goals. Several factors influenced this choice, including individual experience and history of working together on N MoPac Dear Xxcommon projects. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Inc. (RKCI) is pleased to submit our proposal to provide the construction materials observation and testing services on the project referenced above. We propose an estimated budget Our chosen team combines decades of $1,428.90 for testing and observation services for the referenced projectexperience in a wide range of disciplines. This budget is based complementary blend of team member expertise in their various areas of specialization results in a solid, well-rounded team, which ultimately benefits the client. Beyond the proposed team, FNI has access to 900+ employees firmwide to assist, as necessary. As a firm focused on our understanding of client service, we will commit the projectresources required to get the job done. April 15, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials2021 5 DocuSign Envelope ID: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved ByC626945E-5729-412B-AD9E-611DA359117A DocuSign Envelope ID: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AHC626945E-5729-412B-AD9E-611DA359117A DocuSign Envelope ID: am AttachmentsC626945E-5729-412B-AD9E-611DA359117A DocuSign Envelope ID: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23C626945E-5729-051412B-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project NameAD9E-611DA359117A DocuSign Envelope ID: Camp Xxxxxxd CH6 concrete testing Project LocationC626945E-5729-412B-AD9E-611DA359117A DocuSign Envelope ID: Camp Xxxxxxd Campus on N MoPac Contact NameC626945E-5729-412B-AD9E-611DA359117A DocuSign Envelope ID: Xxxxxxx Xxxxxxxx ClientC626945E-5729-412B-AD9E-611DA359117A DocuSign Envelope ID: TFC AddressC626945E-5729-412B-AD9E-611DA359117A DocuSign Envelope ID: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone NumberC626945E-5729-412B-AD9E-611DA359117A DocuSign Envelope ID: 000.000.0000 (O) 000.000.0000 (M) E MailC626945E-5729-412B-AD9E-611DA359117A DocuSign Envelope ID: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 GeneralC626945E-5729-412B-AD9E-611DA359117A DocuSign Envelope ID: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacC626945E-5729-412B-AD9E-611DA359117A DocuSign Envelope ID: C626945E-5729-412B-AD9E-611DA359117A DocuSign Envelope ID: C626945E-5729-412B-AD9E-611DA359117A

Appears in 1 contract

Samples: Architectural Services Agreement

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXXXXXX & ASSOCIATES, INC. By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx.Xxxx X. Xxxxxxxxxxxx, P.E. Executive Director Sr. Vice President and COO Managing Principal Date signed: 04/13/2022 | 11:14 AM CDT 04/13/2022 | 7:36 AM PDT Date signed: Approved: Xxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx Xxxxxxxx Xxxxx Dir/Xxxxx Xxxxx DED/Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 300000 Xxxx Xxxxxxx Xx., 2023 XxXxx. Xxxxxxx Xxxxxxxx TFC 0000 Xxx Xxxxxxx Xxxxxxxxx 000 Xxxxxx, Xxxxx 00000 Re• Phone: (000) 000-0000 • Fax: (000) 000-0000 Wednesday, March 23, 2022 Xxxxx Job No: 0000-000 Xxxxxxx Xxxxx Senior Project Engineer Texas Facilities Commission 0000 Xxx Xxxxxxx Xxxxxx, Xxxxx 00000 RE: Proposal for Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac (CMT) Proposal ID: 1 Via Email: xxxxxxx.xxxxx@xxx.xxxxx.xx.xx Proposed Xxxxx Xxxxxx Building (BHB) Air Handler Unit Replacement (TFC 18-19 DM DSHS) 0000 Xxxxx Xxxxx Xxxx Austin, Texas Dear Xx. XxxxxxxxXxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants& Associates, Inc. (RKCI) is pleased to submit our proposal to provide the construction materials observation and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services for the referenced project. This budget is based on our understanding of the project, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI appreciates the opportunity to submit our proposal for testing services on the construction materials observation and testing referenced project. The attachment presents our Estimate for providing CMT quality control services, as requested during the project by your representatives. We have rely on your representatives to contact our dispatcher when our services are desired. Therefore, the quantity and frequency of testing is the responsibility of our customer. Quality control or assurance tests serve to indicate the material quality for the specific material tested at a fully equipped AASHTO Accredited laboratory specific location at a particular time and we look forward to providing these services to you during date. Quality control or assurance tests do not represent the quality of any other portion of material placed, other than the portion tested and cannot in any way guarantee the quality of a final work product. We understand that the project will consist of construction of this projectapproximately 100 LF concrete driveway north of Xxxxx Xxxxxx Building. If you have any questions concerning Associated site improvements include drainage inlets to existing storm sewer, new curb and sidwalk ramps, new speed hump. A line item description of our proposal or need any additional information, please on call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of services that are included in the total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacestimate of this proposal are mentioned below:

Appears in 1 contract

Samples: www.tfc.texas.gov

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXXXXXXXX CONSULTANTS, INC. By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx.Xxxxx X. Xxxxxx, P.E. Executive Director Sr. Vice President and COO Energy, Power & Environmental Market Leader Date signed: 11/29/2021 | 9:06 AM CST Date signed: 11/29/2021 | 6:47 AM PST Approved: Xxx Xxxxxxx Assistant General TFC Legal Counsel PM/Xxxxxxx Xxxxx Xxxxxxxx Dir/Xxxxx Xxxxx DED/Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail toDocuSign Envelope ID: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3A33EFF5B-D903-4D76-83E6-CD83896A9F33 August 13, 2023 2021 Xx. Xxxxxxx Xxxxx Xxxxxxxx TFC Project Manager Texas Facilities Commission Design and Construction 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx XX 00000 Re: Construction Materials Testing Professional Engineering Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac for Design of Deferred Maintenance Projects in Two State Buildings in Austin – DSHS Buildings F & T Dear Xx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Inc. (RKCI) is pleased Consultants appreciates the opportunity to submit our this proposal to provide the construction materials observation and testing for additional professional engineering/architectural services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services for the above referenced project. This budget proposal has been developed as Professional Engineering Services to refresh and update building Deferred Maintenance projects for both DSHS Campus Buildings F & T (Tower). It is based on Xxxxxxx Consultants understanding that the terms and conditions of this project assignment agreement will be defined by the standard form of TFC’s Professional Architectural/Engineering Services Agreement under our new IDIQ Contract No. 00-000-000. Following is a written understanding of the project, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, this assignment and the number Scope of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen samplingwhich Xxxxxxx Consultants, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI Inc. proposes to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction TFC as part of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacengagement.

Appears in 1 contract

Samples: Quantity Professional Services Agreement

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXWISS, JANNEY, ELSTNER ASSOCIATES, INC. By: By: Xxxx Xxxxx Xxxxxxx XxxxxxxXxxx X. Xxxxxx, Xx., P.E. AIA Executive Director Sr. Vice President and COO Associate Principal & Unit Manager Date signed: 02/25/2022 | 8:46 AM CST Date signed: 02/25/2022 | 7:43 AM CST Approved: Xxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx Xxxxxxxx Xxxxxx Xxxxxx Dir/Xxxxx Xxxxx DED/Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3Wiss, 2023 Xx. Xxxxxxx Xxxxxxxx TFC Janney, Elstner Associates, Inc. 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxx Xxxx Xxxxx Xxxxxxx, Xxxxxx, Xxxxx 00000 Re: Construction Materials Testing 000.000.0000 tel Texas Registered Engineering Firm F-0093 xxx.xxx.xxx October 20, 2021 Xx. Xxxx Xxxxxxx Project Manager Texas Facilities Commission 0000 Xxx Xxxxxxx Xxxx Xxxxxx, Xxxxx 00000 Proposal for Professional Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Related to Roof Condition Assessment Credit Union Building WJE No. 2021.2779.0 Dear Xx. XxxxxxxxXxxxxxx: 0000 Xxxxxxx XxxxWiss, Xxxxx X-000 XxxxxxJanney, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX ConsultantsElstner Associates, Inc. (RKCIWJE) is pleased to submit our present this proposal to provide the construction materials observation Texas Facilities Commission (TFC) for investigation and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services for the referenced project. This budget is based on our understanding assessment of the projectroof assembly at the Credit Union Building, an estimate of quantitieslocated at 000 Xxxx Xxxxxxxx Xxxx, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacTexas.

Appears in 1 contract

Samples: Professional Services Agreement

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXXXXXXXXX, XXXXX AND XXXXXX, INC. By: By: _ Xxxx Xxxxx Xxxxxxx Xxxxx Xxxxxxx, Xx., P.E. Executive Director Sr. Vice President and COO Firm Principal Date signed: 08/20/2021 | 2:22 PM CDT Date signed: 08/20/2021 | 11:41 AM CDT Approved: Xxx Xxxxxxx Assistant General TFC Legal Counsel PMCM/Xxxxxxx Xxxxxxxx X. Xxxxxx Dir/Xxxxx Xxxxx X. Xxxxxxxxx DED/Xxxx X. X. Xxxx TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3August 11, 2023 Xx. Xxxxxxx Xxxxxxxx TFC 2021 Xxx X. Xxxxxx Facilities Design & Construction Texas Facilities Commission 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Dear XxXxxx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Inc. RE: Agreement for Professional Services Texas Facilities Commission | TCEQ Austin Campus Consolidation Dear Xx. Xxxxxx: Xxxxxxxx (RKCIA/E) is pleased to submit our proposal have the opportunity to provide the construction materials observation and testing professional services on the project referenced aboveto Texas Facilities Commission (Owner) for Pre-Design Services & Workplace Strategy for Austin Campus Consolidation (Project). We propose an estimated budget of $1,428.90 for testing and observation services for the referenced project. This budget is based on The following outlines our understanding of the project, an estimate of quantities, project scope and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI how we propose to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you services for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPac.

Appears in 1 contract

Samples: www.tfc.texas.gov

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXENERGY ENGINEERING ASSOCIATES, INC. By: By: Xxxx Xxxxx Xxxx Xxxxxxx Xxxxxxx, Xx., P.E. Executive Director Sr. Vice CEO, President and COO Date signed: 09/13/2022 | 11:01 AM CDT Date signed: 09/13/2022 | 8:57 AM PDT Approved: Xxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx Xxxxxxxx Xxxx Xxxx Dir/Xxxxx Xxxxx DED/Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3Austin, 2023 Texas 0000 Xxxxxx Xxxxx Rd. Suite 200 Austin, TX 78730 512.744.4400 San Antonio, Texas xxxxxxxxxx-xx@xxxxx.xxx 000-000-0000 Albuquerque, New Mexico xxxxxxxxxxx-xx@xxxxx.xxx 000-000-0000 Phoenix, Arizona xxxxxxx-xx@xxxxx.xxx 000-000-0000 xxx.xxxxx.xxx August 31, 2022 Xx. Xxxxxxx Xxxxxxxx TFC 0000 Xxx Xxxxxxx Xxxxxxxxx XxxxxxXxxx Xxxx, Xxxxx 00000 RA, NCARB, CTCM Project Manager Facilities Design & Construction Texas Facilities Commission Austin, Texas Re: Construction Materials Testing Proposal Letter for MEP Engineering Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac North Austin Complex Heating and Condensation Issues Investigation and Schematic Design Dear Xx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Inc. (RKCI) EEA Consulting Engineers is pleased to submit our respond to your request for a fee proposal to provide the construction materials observation and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services MEP Engineering Services for the referenced project. This budget is based proposal incorporates Attachment A. Project Description: Based on our understanding of recent discussions, we understand that this project involves investigating condensation and heating issues currently present at the projectexisting North Austin Complex phase 1 office building and parking garage, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE under existing TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23contract number 22-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPac007-

Appears in 1 contract

Samples: Engineering Services Agreement

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXXXXXXX X. XXXXX AND ASSOCIATES, INC. _______________ By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx.Xxxxxxxx, P.E. Executive Director Sr. Vice President and COO Principal, Managing Director 04/20/2021 | 6:31 AM CDT 04/19/2021 | 11:16 PM EDT Date signedof execution: Date signedof execution: ApprovedPM DGC Dir DED DocuSign Envelope ID: Xxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx Xxxxxxxx Dir/32127AFC-9382-4DA1-92F9-3FB24C54C114 November 2, 2020 Mr. Xxxxx Xxxxx DED/Xxxx X. Xxxx TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3, 2023 Xx. Xxxxxxx Xxxxxxxx TFC Xxxxxx Project Manager Facilities Design & Construction Texas Facilities Commission 0000 Xxx Xxxxxxx Xxxxxxxxx Xxxxxx, Xxxxx 00000 Re: Construction Materials Testing Services Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Dear Xx. Xxxxxxxx: 0000 Xxxxxxx Xxxx, Xxxxx X-000 Xxxx Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX ConsultantsRe: Proposal for Professional Services Xxxxxxxxxx County Law Enforcement Complex Foundation Movement Assessment 0 Xxxxxx Xxxx, Inc. (RKCI) Conroe, TX Xxxxxx X Xxxxx Proposal No. 20-0716 r1 Dear Xxxxx: Xxxxxx X Xxxxx is pleased to submit our this revised proposal to provide the construction materials observation and testing services on the project referenced above. We propose an estimated budget of $1,428.90 for testing and observation professional services for the referenced project. This budget proposal is presented in order to establish a basis for the commencement of our scope of services for the Project. We anticipate that this Proposal and Agreement for Professional Services and attachments, when signed, will serve as our entire Agreement unless superseded by another document signed by both parties. Basis of Proposal This proposal is based on our understanding phone call discussion on March 12, 2020 and subsequent emails the same day as well as in September and October of the project, an estimate of quantities, and past experience with similar projects. A cost estimate breakdown is presented in the attached spreadsheet. Construction sequencing, delays, and the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this project. If you have any questions concerning our proposal or need any additional information, please call us at (000) 000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE TFC IDIQ C PAD23 051 00 March 3, 2023 Very truly yours, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPac2020.

Appears in 1 contract

Samples: www.tfc.texas.gov

Entire Agreement and Modification. The Agreement and this Assignment and their integrated attachment(s) constitute the entire agreement of the Parties and such are intended as a complete and exclusive statement of the promises, representations, negotiations, discussions, and other agreements that may have been made in connection with the subject matter hereof. Unless an integrated attachment to this Assignment specifically displays a mutual intent to amend a particular part of this Assignment, general conflicts in language between any such attachment and this Assignment shall be construed consistently with the terms of this Assignment. Unless otherwise expressly authorized by the terms of this Assignment, no modification, renewal, extension, or amendment to this Assignment shall be binding upon the Parties unless the same is in writing and signed by the respective Parties hereto. This Assignment shall be effective as of the date of the last Party to sign. TEXAS FACILITIES COMMISSION XXXX XXXXXXXTAB TECHNOLOGIES, INC. LLC By: By: Xxxx Xxxxx Xxxxxxx Xxxxxxx, Xx., P.E. Xxxxx See Executive Director Sr. Vice President and COO Date signed: 08/29/2022 | 3:54 PM CDT Date signed: 08/29/2022 | 1:24 PM PDT Approved: Xxx Xxxxxxx Assistant General Counsel PM/Xxxxxxx Xxxxxxxx Dir/Xxxxx Xxxxx DED/Xxxx X. Xxxx DocuSign Envelope ID: ED0C0E34-7414-433F-865C-196A60CEF64A TFC IDIQ C [Delivered by E mail to: Xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx ] PAD23 051 00 March 3Contract 00-000-000 - Assignment No. 4 Exhibit A July 21, 2023 Xx. Xxxxxxx Xxxxxxxx TFC 2022 Texas Facilities Commission 0000 Xxx Xxxxxxx Xxxxxxxxx XxxxxxXxxx. Austin, Xxxxx 00000 ReTX 78701 ATTN: Construction Materials Testing Services Xxxxxxx Xxxxxxxx RE: TxDMV Camp Xxxxxxx CH6 Concrete Testing Camo Xxxxxxx Campus on N MoPac Dear Xx. Xxxxxxxx: 0000 Xxxxxxx XxxxBuilding CH-6 Paper Storage Xxxxxxx, Xxxxx X-000 Xxxxxx, XX 00000 P 512.339.1745 F 512.339.6174 TBPE Firm F-3257 XXX.XXXX.XXX XXXX XXXXXXX Consultants, Inc. (RKCI) is We are pleased to submit our proposal to provide quote the construction materials observation testing, adjusting and testing services balancing (TAB) of the HVAC systems on the referenced project referenced above. We propose an estimated budget of $1,428.90 for testing and observation services for the referenced project. This budget is based on our understanding total net sum of: $5,024.00 (Five Thousand Twenty Four Dollars 0/00 US less tax) CLARIFICATIONS: • All TAB activities will be performed in accordance with the the current edition of the project, an estimate National Environmental Balancing Bureau (NEBB) Procedural Standards. • The TAB scope per contract drawing M2-101 dated 7-19-22 will include the following: o (4) Existing terminal units and associated diffusers with design indicated values o (1) Existing outside air fan with sheave and belt replacement and proportional balancing to (2) existing air handling units. o Adjustment of quantities, and past experience with similar projects. A cost estimate breakdown is presented existing air handling unit operating set points if determined to be required • We have not performed work at this facility in the attached spreadsheet. Construction sequencing, delays, past and may require assistance with adjusting set points within the number of times that the client or their representative requests our services will affect the suggested budget. Services will be provided on a call out basis for the cost estimate spreadsheet attached to this proposal. The scope of work includes the observation and testing of the following construction materials: Concrete compressive strength specimen sampling, testing, and reporting. This proposal may serve as RKCI’s work agreement for the referenced project. Please sign this proposal, initial every page of each attachment, fill out the Report Distribution List, and return one signed original to our office as authorization for RKCI to provide these services. If you choose to issue your own purchase order or work agreement, please reference our proposal number. Thank you for allowing RKCI the opportunity to submit our proposal for the construction materials observation and testing services. We have a fully equipped AASHTO Accredited laboratory and we look forward to providing these services to you during the construction of this projectcontrols program. If you have any questions concerning our proposal or need any additional informationquestions, please call us at (don’t hesitate to call. Respectfully submitted, TAB TECHNOLOGIES Xxxxx Xxxxx cc: BP 22-78 Austin – 0000 Xxxxxxxxxx Xxxx, # 000 Xxxxxx, Xxxxx 00000 Phone: 000) -000-0000 Dallas – 0000 Xxxxx Xxxx Xxxxx, #000 0000. CONSULTANTS • ENVIRONMENTAL • PROJECT MANAGEMENT • INFRASTRUCTURE Xxxxxx, Xxxxx 00000 Phone: 000-000-0000 Houston – 0000 Xxxxxx Xxxx, Spring, Texas 77380 Phone: 000-000-0000 TFC IDIQ C PAD23 051 00 March 3Contract 00-000-000 DocuSign Envelope ID: ED0C0E34-7414-433F-865C-196A60CEF64A Tab Technologies, 2023 Very truly yoursLLC Assignment No. 4 Exhibit B LIST OF PSP PROJECT MANAGER AND SUBCONTRACTORS (Name, (Signature) (Printed or Typed Name) (Title) (Company Name) XXXX XXXXXXX CONSULTANTS, INC. Approved By: Xxxxx X. Xxxxx Lead CoMET Estimator Xxx Xxxxxxxxx, Ph.D., P.E. CoMET Address & Contact Person (Project Manager DB/AH: am Attachments: Cost Estimate Breakdown Scope of Work Report Distribution Terms and Conditions (Date) TFC IDIQ C PAD23-051-00 3 March 3, 2023 COST ESTIMATE BREAKDOWN Project Name: Camp Xxxxxxd CH6 concrete testing Project Location: Camp Xxxxxxd Campus on N MoPac Contact Name: Xxxxxxx Xxxxxxxx Client: TFC Address: 0000 Xxx Xxxxxxx Xxxxxxxxx City/State /Zip Austin, TX 78701 Phone Number: 000.000.0000 (O) 000.000.0000 (M) E Mail: xxxxxxx.xxxxxxxx@xxx.xxxxx.xxx TESTING/OBSERVATION ITEM UNIT COST UNIT ESTIMATED QUANTITY COST EXTENSION CONCRETE Laboratory Testing Concrete Compressive Strength Cylinders $25.00 each 5 $125.00 Field Testing/Observation Materials Technician $68.00 hour 8 $544.00 Materials Technician (overtime) $102.00 hour 0 $0.00 Vehicle Travel Charge $35.00 trip 2 $70.00 Subtotal $739.00 PROJECT ADMINISTRATION Project Coordinator $95.00 hour 2 $190.00 Project Engineer $185.00 hour 2 $370.00 Subtotal $560.00 Reporting, Engineer Review, and Report Distribution 10% of total cost $129.90 GRAND TOTAL $1,428.90 TFC IDIQ C PAD23 050 00 March 3, 2023 General: SCOPE OF WORK Construction Materials Testing Services Camp Xxxxxxd CH6 – Concrete Testing Camp Xxxxxxd Campus on N MoPacManager))

Appears in 1 contract

Samples: www.tfc.texas.gov

Time is Money Join Law Insider Premium to draft better contracts faster.