Common use of Entrance Facilities Clause in Contracts

Entrance Facilities. LCT may elect to place LCT-owned or LCT-leased fiber entrance facilities into the Collocation Space. BellSouth will designate the point of interconnection in close proximity to the Premises building housing the Collocation Space, such as an entrance manhole or a cable vault which are physically accessible by both Parties. LCT will provide and place fiber cable at the point of entrance of sufficient length to be pulled through conduit and into the splice location. LCT will provide and install a sufficient length of fire retardant riser cable, to which the entrance cable will be spliced, which will extend from the splice location to LCT’s equipment in the Collocation Space. In the event LCT utilizes a non-metallic, riser- type entrance facility, a splice will not be required. LCT must contact BellSouth for instructions prior to placing the entrance facility cable in the manhole. LCT is responsible for maintenance of the entrance facilities. At LCT’s option BellSouth will accommodate where technically feasible a microwave entrance facility pursuant to separately negotiated terms and conditions. In the case of adjacent collocation, unless BellSouth determines that limited space is available for the entrance facilities, copper facilities may be used between the adjacent collocation arrangement and the central office termination point.

Appears in 1 contract

Samples: Interconnection Agreement

AutoNDA by SimpleDocs

Entrance Facilities. LCT BTC may elect to place LCTBTC-owned or LCTBTC-leased fiber entrance facilities into the Collocation Space. BellSouth will designate the point of interconnection in close proximity to the Premises building housing the Collocation Space, such as an entrance manhole or a cable vault which are physically accessible by both Parties. LCT BTC will provide and place fiber cable at the point of entrance of sufficient length to be pulled through conduit and into the splice location. LCT BTC will provide and install a sufficient length of fire retardant riser cable, to which the entrance cable will be spliced, which will extend from the splice location to LCTBTC’s equipment in the Collocation Space. In the event LCT BTC utilizes a non-metallic, riser- type entrance facility, a splice will not be required. LCT BTC must contact BellSouth for instructions prior to placing the entrance facility cable in the manhole. LCT BTC is responsible for maintenance of the entrance facilities. At LCTBTC’s option BellSouth will accommodate where technically feasible a microwave entrance facility pursuant to separately negotiated terms and conditions. In the case of adjacent collocation, unless BellSouth determines that limited space is available for the entrance facilities, copper facilities may be used between the adjacent collocation arrangement and the central office termination point.

Appears in 1 contract

Samples: psc.ky.gov

Entrance Facilities. LCT Powertel may elect to place LCTPowertel-owned or LCTPowertel-leased fiber entrance facilities into the Collocation Space. BellSouth will designate the point of interconnection in close proximity to the Premises building housing the Collocation Space, such as an entrance manhole or a cable vault which are physically accessible by both Parties. LCT Powertel will provide and place fiber cable at the point of entrance of sufficient length to be pulled through conduit and into the splice location. LCT Powertel will provide and install a sufficient length of fire retardant riser cable, to which the entrance cable will be spliced, which will extend from the splice location to LCTPowertel’s equipment in the Collocation Space. In the event LCT Powertel utilizes a non-non- metallic, riser- riser-type entrance facility, a splice will not be required. LCT Powertel must contact BellSouth for instructions prior to placing the entrance facility cable in the manhole. LCT Powertel is responsible for maintenance of the entrance facilities. At LCTPowertel’s option BellSouth will accommodate where technically feasible a microwave entrance facility pursuant to separately negotiated terms and conditions. In the case of adjacent collocation, unless BellSouth determines that limited space is available for the entrance facilities, copper facilities may be used between the adjacent collocation arrangement and the central office termination point.

Appears in 1 contract

Samples: Master Agreement

Entrance Facilities. LCT BBOC may elect to place LCTBBOC-owned or LCTBBOC-leased fiber entrance facilities into the Collocation Space. BellSouth will designate the point of interconnection in close proximity to the Premises building housing the Collocation Space, such as an entrance manhole or a cable vault which are physically accessible by both Parties. LCT BBOC will provide and place fiber cable at the point of entrance of sufficient length to be pulled through conduit and into the splice location. LCT BBOC will provide and install a sufficient length of fire retardant riser cable, to which the entrance cable will be spliced, which will extend from the splice location to LCTBBOC’s equipment in the Collocation Space. In the event LCT BBOC utilizes a non-metallic, riser- riser-type entrance facility, a splice will not be required. LCT BBOC must contact BellSouth for instructions prior to placing the entrance facility cable in the manhole. LCT BBOC is responsible for maintenance of the entrance facilities. At LCTBBOC’s option BellSouth will accommodate where technically feasible a microwave entrance facility pursuant to separately negotiated terms and conditions. In the case of adjacent collocation, unless BellSouth determines that limited space is available for the entrance facilities, copper facilities may be used between the adjacent collocation arrangement and the central office termination point.

Appears in 1 contract

Samples: Agreement Between

AutoNDA by SimpleDocs

Entrance Facilities. LCT DeltaCom may elect to place LCTDeltaCom-owned or LCTDeltaCom-leased fiber entrance facilities into the Collocation Space. BellSouth will designate the point of interconnection in close proximity to the Premises building housing the Collocation Space, such as an entrance manhole or a cable vault vault, which are physically accessible by both Parties. LCT DeltaCom will provide and place fiber cable at the point of entrance of sufficient length to be pulled through conduit and into the splice location. LCT DeltaCom will provide and install a sufficient length of fire retardant riser cable, to which the entrance cable will be splicedspliced by BellSouth, which will extend from the splice location to LCTDeltaCom’s equipment in the Collocation Space. In the event LCT DeltaCom utilizes a non-metallic, riser- riser-type entrance facility, a splice will not be required. LCT DeltaCom must contact BellSouth for instructions prior to placing the entrance facility cable in the manhole. LCT DeltaCom is responsible for maintenance of the entrance facilities. At LCTDeltaCom’s option BellSouth will accommodate where technically feasible a microwave entrance facility pursuant to separately negotiated terms and conditions. In the case of adjacent collocation, unless BellSouth determines that limited space is available for the entrance facilities, copper facilities may be used between the adjacent collocation arrangement and the central office termination demarcation point.

Appears in 1 contract

Samples: Agreement (Itc Deltacom Inc)

Entrance Facilities. LCT Maxcess may elect to place LCTMaxcess-owned or LCT-Maxcess- leased fiber entrance facilities into the Collocation Space. BellSouth will designate the point of interconnection in close proximity to the Premises Central Office building housing the Collocation Space, such as an entrance manhole or a cable vault which are physically accessible by both Partiesparties. LCT Maxcess will provide and place fiber cable at the point of entrance interconnection of sufficient length to be pulled through conduit and into the splice location. LCT Maxcess will provide and install a sufficient length of fire retardant riser cable, to which the entrance cable will be spliced, which will extend from the splice location to LCT’s the Maxcess’ equipment in the Collocation Space. In the event LCT Maxcess utilizes a non-metallic, riser- riser-type entrance facility, a splice will not be required. LCT Maxcess must contact BellSouth for instructions prior to placing the entrance facility cable in the manhole. LCT Maxcess is responsible for maintenance of the entrance facilities. At LCT’s facilities Maxcess‘ option BellSouth will accommodate where technically feasible a microwave entrance facility pursuant to separately negotiated terms and conditions. In the case of adjacent collocation, unless BellSouth determines that limited space is available for the entrance facilities, copper facilities may be used between the adjacent collocation arrangement and the central office termination point.

Appears in 1 contract

Samples: Master Agreement