Common use of Examination of work before covering up Clause in Contracts

Examination of work before covering up. In respect of the work which the Authority’s Engineer is entitled to examine, inspect, measure and/or test before it is covered up or put out of view or any part of the work is placed thereon, the Contractor shall give notice to the Authority’s Engineer whenever any such work is ready and before it is covered up. The Authority’s Engineer shall then either carry out the examination, inspection or testing without unreasonable delay, or promptly give notice to the Contractor that the Authority’s Engineer does not require to do so. Provided, however, that if any work is of a continuous nature where it is not possible or prudent to keep it uncovered or incomplete, the Contractor shall notify the schedule of carrying out such work to give sufficient opportunity, not being less than 3 (three) business days’ notice, to the Authority’s Engineer to conduct its inspection, measurement or test while the work is continuing. Provided further that in the event the Contractor receives no response from the Authority’s Engineer within a period of 3 (three) business days from the date on which the Contractor’s notice hereunder is delivered to the Authority’s Engineer, the Contractor shall be entitled to assume that the Authority’s Engineer would not undertake the said inspection.

Appears in 114 contracts

Samples: Engineering Procurement and Construction Agreement, Engineering Procurement and Construction Agreement, Construction Contract

AutoNDA by SimpleDocs

Examination of work before covering up. In respect of the work which the Authority’s Engineer is entitled to examine, inspect, measure and/or test before it is covered up or put out of view or any part of the work is placed thereon, the Contractor shall give notice to the Authority’s Engineer whenever any such work is ready and before it is covered up. The Authority’s Engineer shall then either carry out the examination, inspection or testing without unreasonable delay, or promptly give notice to the Contractor that the Authority’s Engineer does not require to do so. Provided, however, that if any work is of a continuous nature where it is not possible or prudent to keep it uncovered or incomplete, the Contractor shall notify the schedule of carrying out such work to give sufficient opportunity, not being less than 3 (three) business days’ notice, to the Authority’s Engineer to conduct its inspection, measurement or test while the work is continuing. Provided further that in the event the Contractor receives no response from the Authority’s Engineer within a period of 3 (three) business days from the date on which the Contractor’s notice hereunder is delivered to the Authority’s Engineer, the Contractor shall be entitled to assume that the Authority’s Engineer would not undertake the said inspection.

Appears in 23 contracts

Samples: Engineering Procurement and Construction (Epc) Agreement, Engineering Procurement and Construction Agreement, Contract Agreement

Examination of work before covering up. In respect of the work which the Authority’s Authority Engineer is entitled to examine, inspect, measure and/or or test before it is covered up or put out of view or any part of the work is placed thereon, the Contractor shall give notice to the Authority’s Authority Engineer whenever any such work is ready and before it is covered up. The Authority’s Authority Engineer shall then either carry out the examination, inspection or testing without unreasonable delay, or promptly give notice to the Contractor that the Authority’s Authority Engineer does not require to do so. Provided, however, that if any work is of a continuous nature where it is not possible or prudent to keep it uncovered or incomplete, the Contractor shall notify the schedule of carrying out such work to give sufficient opportunity, not being less than 3 (three) business days’ notice, to the Authority’s Authority Engineer to conduct its inspection, measurement or test while the work is continuing. Provided further that in the event the Contractor receives no response from the Authority’s Authority Engineer within a period of 3 (three) business days from the date on which the Contractor’s notice hereunder is delivered to the Authority’s Authority Engineer, the Contractor shall be entitled to assume that the Authority’s Authority Engineer would not undertake the said inspection.

Appears in 11 contracts

Samples: Epc Agreement, Epc Agreement, Engineering, Procurement and Construction (Epc) Agreement

Examination of work before covering up. In respect of the work which the Authority’s Engineer is entitled to examine, inspect, measure and/or test before it is covered up or put out of view or any part of the work is works placed thereon, the Contractor shall give notice to the Authority’s Engineer whenever any such work is ready and before it is covered up. The Authority’s Engineer wheneveranysuchworkisreadyandbeforeitiscoveredup.TheAuthority’sEngineer shall then either carry out the examination, inspection or testing without unreasonable delay, or promptly give notice to the Contractor that the Authority’s Engineer does not require to do so. Provided, however, that if any work is of a continuous nature where it is not possible or prudent to keep it uncovered or incomplete, the Contractor shall notify the schedule of carrying out such work to give sufficient opportunity, not being less than 3 (three) business days’ notice, to the Authority’s Engineer to conduct its inspection, measurement or test while the work is continuing. Provided further that in the event the Contractor receives no response from the Authority’s Engineer within a period of 3 (three) business days from the date on which the Contractor’s notice hereunder is delivered to the Authority’s Engineer, the Contractor shall be entitled to assume that the Authority’s Engineer would not undertake the said inspection.

Appears in 9 contracts

Samples: Construction Contract, Construction Contract, Contract Agreement

Examination of work before covering up. In respect of the work which the Authority’s Authority‟s Engineer is entitled to examine, inspect, measure and/or test before it is covered up or put out of view or any part of the work is placed thereon, the Contractor shall give notice to the Authority’s Authority‟s Engineer whenever any such work is ready and before it is covered up. The Authority’s Authority‟s Engineer shall then either carry out the examination, inspection or testing without unreasonable delay, or promptly give notice to the Contractor that the Authority’s Authority‟s Engineer does not require to do so. Provided, however, that if any work is of a continuous nature where it is not possible or prudent to keep it uncovered or incomplete, the Contractor shall notify the schedule of carrying out such work to give sufficient opportunity, not being less than 3 (three) business days’ days‟ notice, to the Authority’s Authority‟s Engineer to conduct its inspection, measurement or test while the work is continuing. Provided further that in the event the Contractor receives no response from the Authority’s Authority‟s Engineer within a period of 3 (three) business days from the date on which the Contractor’s Contractor‟s notice hereunder is delivered to the Authority’s Authority‟s Engineer, the Contractor shall be entitled to assume that the Authority’s Authority‟s Engineer would not undertake the said inspection.

Appears in 8 contracts

Samples: Engineering, Procurement and Construction Agreement, Epc Agreement, Construction Contract

Examination of work before covering up. In respect of the work which the Authority’s Engineer is entitled to examine, inspect, measure and/or or test before it is covered up or put out of view or any part of the work is placed thereon, the Contractor shall give notice to the Authority’s Engineer whenever any such work is ready and before it is covered up. The Authority’s Engineer shall then either carry out the examination, inspection or testing without unreasonable delay, or promptly give notice to the Contractor that the Authority’s Engineer does not require to do so. Provided, however, that if any work is of a continuous nature where it is not possible or prudent to keep it uncovered or incomplete, the Contractor shall notify the schedule of carrying out such work to give sufficient opportunity, not being less than 3 (three) business days’ notice, to the Authority’s Engineer to conduct its inspection, measurement or test while the work is continuing. Provided further that in the event the Contractor receives no response from the Authority’s Engineer within a period of 3 (three) business days from the date on which the Contractor’s notice hereunder is delivered to the Authority’s Engineer, the Contractor shall be entitled to assume that the Authority’s Engineer would not undertake the said inspection.

Appears in 6 contracts

Samples: Engineering, Procurement and Construction Agreement, Engineering, Procurement and Construction Agreement, Standard Engineering, Procurement and Construction (Epc) Agreement for Railway Projects

Examination of work before covering up. In respect of the work which the Authority’s Engineer is entitled to examine, inspect, measure and/or test before it is covered up or put out of view or any part of the work is workis placed thereon, the Contractor shall give notice to the Authority’s Engineer whenever any such work is ready and before it is covered up. The Authority’s Engineer wheneveranysuchworkisreadyandbeforeitiscoveredup.TheAuthority’sEngineer shall then either carry out the examination, inspection or testing without unreasonable delay, or promptly give notice to the Contractor that the Authority’s Engineer does not require to do so. Provided, however, that if any work is of a continuous nature where it is not possible or prudent to keep it uncovered or incomplete, the Contractor shall notify the schedule of carrying out such work to give sufficient opportunity, not being less than 3 (three) business days’ notice, to the Authority’s Engineer to conduct its inspection, measurement or test while the work is continuing. Provided further that in the event the Contractor receives no response from the Authority’s Engineer within a period of 3 (three) business days from the date on which the Contractor’s notice hereunder is delivered to the Authority’s Engineer, the Contractor shall be entitled to assume that the Authority’s Engineer would not undertake the said inspectionsaidinspection.

Appears in 4 contracts

Samples: Construction Contract, Construction Contract, Construction Contract

Examination of work before covering up. In respect of the work which the Authority’s Employer's Engineer is entitled to examine, inspect, measure and/or test before it is covered up or put out of view or any part of the work is placed thereon, the Contractor shall give notice to the Authority’s Employer's Engineer whenever any such work is ready and before it is covered up. The Authority’s Employer's Engineer shall then either carry out the examination, inspection or testing without unreasonable delay, or promptly give notice to the Contractor that the Authority’s Employer's Engineer does not require to do so. Provided, however, that if any work is of a continuous nature where it is not possible or prudent to keep it uncovered or incomplete, the Contractor shall notify the schedule of carrying out such work to give sufficient opportunity, not being less than 3 (three) business days' notice, to the Authority’s Employer's Engineer to conduct its inspection, measurement or test while the work is continuing. Provided further that in the event the Contractor receives no response from the Authority’s Employer's Engineer within a period of 3 (three) business days from the date on which the Contractor’s 's notice hereunder is delivered to the Authority’s Employer's Engineer, the Contractor shall be entitled to assume that the Authority’s Employer's Engineer would not undertake the said inspection.

Appears in 3 contracts

Samples: Epc Agreement, Epc Agreement, Engineering, Procurement and Construction Agreement

Examination of work before covering up. In respect of the work which the Authority’s 's Engineer is entitled to examine, inspect, measure and/or test before it is covered up or put out of view or any part of the work is placed thereon, the Contractor shall give notice to the Authority’s 's Engineer whenever any such work is ready and before it is covered up. The Authority’s 's Engineer shall then either carry out the examination, inspection or testing without unreasonable delay, or promptly give notice to the Contractor that the Authority’s 's Engineer does not require to do so. Provided, however, that if any work is of a continuous nature where it is not possible or prudent to keep it uncovered or incomplete, the Contractor shall notify the schedule of carrying out such work to give sufficient opportunity, not being less than 3 (three) business days' notice, to the Authority’s 's Engineer to conduct its inspection, measurement or test while the work is continuing. Provided further that in the event the Contractor receives no response from the Authority’s 's Engineer within a period of 3 (three) business days from the date on which the Contractor’s 's notice hereunder is delivered to the Authority’s 's Engineer, the Contractor shall be entitled to assume that the Authority’s 's Engineer would not undertake the said inspection.

Appears in 2 contracts

Samples: Construction Contract, Construction Contract

Examination of work before covering up. In respect of the work which the Authority’s Engineer is entitled to examine, inspect, measure and/or test before it is covered up or put out of view or any part of the work is placed thereon, the Contractor shall give notice to the Authority’s Engineer whenever any such work is ready and before it is covered up. The Authority’s Engineer shall then either carry out the examination, inspection or testing without unreasonable delay, or promptly give notice to the Contractor that the Authority’s Engineer does not require to do so. Provided, however, that if any work is of a continuous nature where it is not possible or prudent to keep it uncovered or incomplete, the Contractor shall notify the schedule of carrying out such work to give sufficient opportunity, not being less than 3 (three) business days’ notice, to the Authority’s Engineer to conduct its inspection, 47 measurement or test while the work is continuing. Provided further that in the event the Contractor receives no response from the Authority’s Engineer within a period of 3 (three) business days from the date on which the Contractor’s notice hereunder is delivered to the Authority’s Engineer, the Contractor shall be entitled to assume that the Authority’s Engineer would not undertake the said inspection.

Appears in 2 contracts

Samples: Draft Contract Agreement, Contract Agreement

Examination of work before covering up. In respect of the work which the Authority’s Independent Engineer is entitled to examine, inspect, measure and/or test before it is covered up or put out of view or any part of the work is placed thereon, the Contractor Concessionaire shall give notice to the Authority’s Authority and the Independent Engineer whenever any such work is ready and before it is covered up. The Authority’s Authority and the Independent Engineer shall then either carry out the examination, inspection or testing without unreasonable delay, or promptly give notice to the Contractor Concessionaire that the Authority’s Independent Engineer does not require to do so. Provided, however, that if any work is of a continuous nature where it is not possible or prudent to keep it uncovered or incomplete, the Contractor Concessionaire shall notify the schedule of carrying out such work to give sufficient opportunity, not being less than 3 (three) business days’ notice, to the Authority’s Authority and the Independent Engineer to conduct its inspection, measurement or test while the work is continuing. Provided further that in the event the Contractor Concessionaire receives no response from the Authority’s Authority or the Independent Engineer within a period of 3 (three) business days from the date on which the ContractorConcessionaire’s notice hereunder is delivered to the Authority’s Independent Engineer, the Contractor Concessionaire shall be entitled to assume that the Authority’s Independent Engineer would not undertake the said inspection.

Appears in 2 contracts

Samples: Concession Agreement, Concession Agreement

Examination of work before covering up. In respect of the work which the Authority’s Engineer is entitled to examine, inspect, measure and/or or test before it is covered up or put out of view or any part of the work is placed thereon, the Contractor Concessionaire shall give notice to the Authority’s Engineer whenever any such work is ready and before it is covered up. The Authority’s Engineer shall then either carry out the examination, inspection or testing without unreasonable delay, or promptly give notice to the Contractor Concessionaire that the Authority’s Engineer does not require to do so. Provided, however, that if any work is of a continuous nature where it is not possible or prudent to keep it uncovered or incomplete, the Contractor Concessionaire shall notify the schedule of carrying out such work to give sufficient opportunity, not being less than 3 (three) business days’ notice, to the Authority’s Engineer to conduct its inspection, measurement or test while the work is continuing. Provided further that in the event the Contractor Concessionaire receives no response from the Authority’s Engineer within a period of 3 (three) business days from the date on which the ContractorConcessionaire’s notice hereunder is delivered to the Authority’s Engineer, the Contractor Concessionaire shall be entitled to assume that the Authority’s Engineer would not undertake the said inspection.

Appears in 2 contracts

Samples: Concession Agreement, Concession Agreement

Examination of work before covering up. In respect of the work which the Authority’s Engineer is entitled to examine, inspect, measure and/or test before it is covered up or put out of view or any part of the work is works placed thereon, the Contractor shall give notice to the Authority’s Engineer whenever any such work is ready and before it is covered up. The Authority’s Engineer shall then either carry out the examination, inspection or testing without unreasonable delay, or promptly give notice to the Contractor that the Authority’s Engineer does not require to do so. Provided, however, that if any work is of a continuous nature where it is not possible or prudent to keep it uncovered or incomplete, the Contractor shall notify the schedule of carrying out such work to give sufficient opportunity, not being less than 3 (three) business days’ notice, to the Authority’s Engineer to conduct its inspection, measurement or test while the work is continuing. Provided further that in the event the Contractor receives no response from the Authority’s Engineer within a period of 3 (three) business days from the date on which the Contractor’s notice hereunder is delivered to the Authority’s Engineer, the Contractor shall be entitled to assume that the Authority’s Engineer would not undertake the said inspection.

Appears in 2 contracts

Samples: Construction Contract, Construction Contract

Examination of work before covering up. In respect of the work which the Authority’s Engineer is entitled to examine, inspect, measure and/or test before it is covered up or put out of view or any part of the work is placed thereonxxxxxxx, the Contractor shall give notice to the Authority’s Engineer whenever any such work is ready and before it is covered up. The Authority’s Engineer shall then either carry out the examination, inspection or testing without unreasonable delay, or promptly give notice to the Contractor that the Authority’s Engineer does not require to do so. Provided, however, that if any work is of a continuous nature where it is not possible or prudent to keep it uncovered or incomplete, the Contractor shall notify the schedule of carrying out such work to give sufficient opportunity, not being less than 3 (three) business days’ notice, to the Authority’s Engineer to conduct its inspection, measurement or test while the work is continuing. Provided further that in the event the Contractor receives no response from the Authority’s Engineer within a period of 3 (three) business days from the date on which the Contractor’s notice hereunder is delivered to the Authority’s Engineer, the Contractor shall be entitled to assume that the Authority’s Engineer would not undertake the said inspection.

Appears in 2 contracts

Samples: Contract Agreement, Contract Agreement

Examination of work before covering up. In respect of the work which the AuthorityEmployer’s Engineer is entitled to examine, inspect, measure and/or test before it is covered up or put out of view or any part of the work is placed thereon, the Contractor shall give notice to the AuthorityEmployer’s Engineer whenever any such work is ready and before it is covered up. The AuthorityEmployer’s Engineer shall then either carry out the examination, inspection or testing without unreasonable delay, or promptly give notice to the Contractor that the AuthorityEmployer’s Engineer does not require to do so. Provided, however, that if any work is of a continuous nature where it is not possible or prudent to keep it uncovered or incomplete, the Contractor shall notify the schedule of carrying out such work to give sufficient opportunity, not being less than 3 (three) business days’ notice, to the AuthorityEmployer’s Engineer to conduct its inspection, measurement or test while the work is continuing. Provided further that in the event the Contractor receives no response from the AuthorityEmployer’s Engineer within a period of 3 (three) business days from the date on which the Contractor’s notice hereunder is delivered to the AuthorityEmployer’s Engineer, the Contractor shall be entitled to assume that the AuthorityEmployer’s Engineer would not undertake the said inspection.

Appears in 2 contracts

Samples: Epc Agreement, Contract Agreement for Design and Construction

Examination of work before covering up. In respect of the work which the Authority’s Engineer is entitled to examine, inspect, measure and/or test before it is covered up or put out of view or any part of the work is placed thereon, the Contractor shall give notice to the Authority’s Engineer whenever any such work is ready and before it is covered up. The Authority’s Engineer shall then either carry out the examination, inspection or testing without unreasonable delay, or promptly give notice to the Contractor that the Authority’s Engineer does not require to do so. Provided, however, that if any work is of a continuous nature where it is not possible or prudent to keep it uncovered or incomplete, the Contractor shall notify the schedule of carrying out such work to give sufficient opportunity, not being less than 3 (three) business days’ notice, to the Authority’s Engineer to conduct its inspection, measurement or test while the work is continuing. Provided further that in the event the Contractor receives no response from the Authority’s Engineer within a period of 3 (three) business days from the date on which the Contractor’s notice hereunder is delivered to the Authority’s Engineer, the Contractor shall be entitled to assume that the Authority’s Engineer would not undertake the said inspection.. Draft Contract Agreement 58

Appears in 1 contract

Samples: Construction Contract

Examination of work before covering up. In respect of the work which the AuthorityEmployer’s Engineer is entitled to examine, inspect, measure and/or test before it is covered up or put out of view or any part of the work is placed thereon, the Contractor shall give notice to the AuthorityEmployer’s Engineer whenever any such work is ready and before it is covered up. The AuthorityEmployer’s Engineer shall then either carry out the examination, inspection or testing without unreasonable delay, or promptly give notice to the Contractor that the AuthorityEmployer’s Engineer does not require to do so. Provided, however, that if any work is of a continuous nature where it is not possible or prudent to keep it uncovered or incomplete, the then Contractor shall notify the schedule of carrying out such work to give sufficient opportunity, not being less than 3 (three) business days’ notice, to the AuthorityEmployer’s Engineer to conduct its inspection, measurement or test while the work is continuing. Provided further that in the event the Contractor receives no response from the AuthorityEmployer’s Engineer within a period of 3 (three) business days from the date on which the Contractor’s notice hereunder is delivered to the AuthorityEmployer’s Engineer, the Contractor shall be entitled to assume that the AuthorityEmployer’s Engineer would not undertake the said inspection.

Appears in 1 contract

Samples: Epc Contract

AutoNDA by SimpleDocs

Examination of work before covering up. In respect of the work which the Authority’s Engineer is entitled to examine, inspect, measure and/or test before it is covered up or put out of view or any part of the work is placed thereon, the Contractor shall give notice to the Authority’s Engineer whenever any such work is ready and before it is covered up. The Authority’s Engineer shall then either carry out the examination, inspection or testing without unreasonable delay, or promptly give notice to the Contractor that the Authority’s Engineer does not require to do so. Provided, however, that if any work is of a continuous nature where it is not possible pos- sible or prudent to keep it uncovered or incomplete, the Contractor shall notify the schedule of carrying out such work to give sufficient opportunity, not being less than 3 (three) business days’ notice, to the Authority’s Engineer to conduct its inspection, measurement or test while the work is continuing. Provided further that in the event the Contractor receives no response from the Authority’s Engineer within a period of 3 (three) business days from the date on which the Contractor’s notice hereunder is delivered deliv- ered to the Authority’s Engineer, the Contractor shall be entitled to assume that the AuthorityAu- thority’s Engineer would not undertake the said inspection.

Appears in 1 contract

Samples: Construction Contract

Examination of work before covering up. In respect of the work which the Authority’s Engineer is entitled to examine, inspect, measure and/or test before it is covered up or put out of view or any part of the work is workis placed thereon, the Contractor shall give notice to the Authority’s Engineer whenever any such work is ready and before it is covered up. The Authority’s Engineer wheneveranysuchworkisreadyandbeforeitiscoveredup.TheAuthority’sEngineer shall then either carry out the examination, inspection or testing without unreasonable delay, or promptly give notice to the Contractor that the Authority’s Engineer does not require to do so. Provided, however, that if any work is of a continuous nature where it is not possible or prudent to keep it uncovered or incomplete, the Contractor shall notify the schedule of carrying out such work to give sufficient opportunity, not being less than 3 (three) business days’ notice, to the Authority’s Engineer to conduct its inspection, measurement or test while the work is continuing. Provided further that in the event the Contractor receives no response from the Authority’s Engineer within a period of 3 (three) business days from the date on which the Contractor’s notice hereunder is delivered to the Authority’s Engineer, the Contractor shall be entitled to assume that the Authority’s Engineer would not undertake the said inspection.

Appears in 1 contract

Samples: Contract Agreement

Examination of work before covering up. In respect of the work which the AuthorityEmployer’s Engineer is entitled to examine, inspect, measure and/or test before it is covered up or put out of view or any part of the work is placed thereon, the Contractor shall give notice to the AuthorityEmployer’s Engineer whenever any such work is ready and before it is covered up. The AuthorityEmployer’s Engineer shall then either carry out the examination, inspection or testing without unreasonable delay, or promptly give notice to the Contractor that the AuthorityEmployer’s Engineer does not require to do so. Provided, however, that if any work is of a continuous nature where it is not possible or prudent to keep it uncovered or incomplete, the Contractor shall notify the schedule of carrying out such work to give sufficient opportunity, not being less than 3 (three) business days’ notice, to the AuthorityEmployer’s Engineer to conduct its inspection, measurement or test while the work is continuing. Provided further that in the event the Contractor receives no response from the AuthorityEmployer’s Engineer within a period of 3 (three) business days from the date on which the Contractor’s notice hereunder is delivered to the AuthorityEmployer’s Engineer, the Contractor shall be entitled to assume that the AuthorityEmployer’s Engineer would not undertake the said inspection.

Appears in 1 contract

Samples: Demonstration Agreement

Examination of work before covering up. In respect of the work which the Authority’s Employer‟s Engineer is entitled to examine, inspect, measure and/or test before it is covered up or put out of view or any part of the work is placed thereon, the Contractor shall give notice to the Authority’s Employer‟s Engineer whenever any such work is ready and before it is covered up. The Authority’s Employer‟s Engineer shall then either carry out the examination, inspection or testing without unreasonable delay, or promptly give notice to the Contractor that the Authority’s Employer‟s Engineer does not require to do so. Provided, however, that if any work is of a continuous nature where it is not possible or prudent to keep it uncovered or incomplete, the Contractor shall notify the schedule of carrying out such work to give sufficient opportunity, not being less than 3 (three) business days’ days‟ notice, to the Authority’s Employer‟s Engineer to conduct its inspection, measurement or test while the work is continuing. Provided further that in the event the Contractor receives no response from the Authority’s Employer‟s Engineer within a period of 3 (three) business days from the date on which the Contractor’s Contractor‟s notice hereunder is delivered to the Authority’s Employer‟s Engineer, the Contractor shall be entitled to assume that the Authority’s Employer‟s Engineer would not undertake the said inspection.

Appears in 1 contract

Samples: Epc Agreement

Examination of work before covering up. In respect of the work which the AuthoritySPV’s Engineer is entitled to examine, inspect, measure and/or or test before it is covered up or put out of view or any part of the work is placed thereon, the Contractor shall give notice to the AuthoritySPV’s Engineer whenever any such work is ready and before it is covered up. The AuthoritySPV’s Engineer shall then either carry out the examination, inspection or testing without unreasonable delay, or promptly give notice to the Contractor that the AuthoritySPV’s Engineer does not require to do so. Provided, however, that if any work is of a continuous nature where it is not possible or prudent to keep it uncovered or incomplete, the Contractor shall notify the schedule of carrying out such work to give sufficient opportunity, not being less than 3 (three) business days’ notice, to the AuthoritySPV’s Engineer to conduct its inspection, measurement or test while the work is continuing. Provided further that in the event the Contractor receives no response from the AuthoritySPV’s Engineer within a period of 3 (three) business days from the date on which the Contractor’s notice hereunder is delivered to the AuthoritySPV’s EngineerEngineer , the Contractor shall be entitled to assume that the AuthoritySPV’s Engineer would not undertake the said inspection.

Appears in 1 contract

Samples: Epc Agreement

Examination of work before covering up. In respect of the work which the Authority’s Engineer is entitled to examine, inspect, measure measure, and/or test before it is covered up or put out of view or any part of the work is placed thereon, the Contractor shall give notice to the Authority’s Engineer whenever any such work is ready and before it is covered up. The Authority’s Engineer shall then either carry out the examination, inspection inspection, or testing without unreasonable delay, delay or promptly give notice to the Contractor that the Authority’s Engineer does is not require required to do so. Provided, however, that if any work is of a continuous nature where it is not possible or prudent to keep it uncovered or incomplete, the Contractor shall notify the schedule of carrying out such work to give sufficient opportunity, not being less than 3 (three) business days’ notice, to the Authority’s Engineer to conduct its inspection, measurement or test while the work is continuing. Provided further that in the event the Contractor receives no response from the Authority’s Engineer within a period of 3 (three) business days from the date on which the Contractor’s notice hereunder is delivered to the Authority’s Engineer, the Contractor shall be entitled to assume that the Authority’s Engineer would not undertake the said inspection.

Appears in 1 contract

Samples: Engineering Procurement and Construction (Epc) Agreement

Examination of work before covering up. In respect of the work which the Authority’s Engineer is entitled to examine, inspect, measure and/or test before it is covered up or put out of view or any part of the work is placed thereon, the Contractor shall give notice to the Authority’s Engineer whenever any such work is ready and before it is covered up. The Authority’s Engineer shall then either carry out the examination, inspection or testing without unreasonable delay, or promptly give notice to the Contractor that the Authority’s Engineer does not require to do so. Provided, however, that if any work is of a continuous nature where it is not possible or prudent to keep it uncovered or incomplete, the Contractor shall notify the schedule of carrying out such work to give sufficient opportunity, not being less than 3 (three) business days’ days‟ notice, to the Authority’s Engineer to conduct its inspection, measurement or test while the work is continuing. Provided further that in the event the Contractor receives no response from the Authority’s Engineer within a period of 3 (three) business days from the date on which the Contractor’s notice hereunder is delivered to the Authority’s Engineer, the Contractor shall be entitled to assume that the Authority’s Engineer would not undertake the said inspection.

Appears in 1 contract

Samples: Epc Agreement

Examination of work before covering up. In respect of the work which the Authority’s Engineer is entitled to examine, inspect, measure and/or test before it is covered up or put out of view or any part of the work is placed thereon, the Contractor shall give notice to the Authority’s Engineer whenever any such work is ready and before it is covered up. The Authority’s Engineer shall then either carry out the examination, inspection or testing without unreasonable delay, or promptly give notice to the Contractor that the Authority’s Engineer does not require to do so. Provided, however, that if any work is of a continuous nature where it is not Page 70 of 250 possible or prudent to keep it uncovered or incomplete, the Contractor shall notify the schedule of carrying out such work to give sufficient opportunity, not being less than 3 (three) business days’ notice, to the Authority’s Engineer to conduct its inspection, measurement or test while the work is continuing. Provided further that in the event the Contractor receives no response from the Authority’s Engineer within a period of 3 (three) business days from the date on which the Contractor’s notice hereunder is delivered to the Authority’s Engineer, the Contractor shall be entitled to assume that the Authority’s Engineer would not undertake the said inspection.

Appears in 1 contract

Samples: Engineering Procurement and Construction Agreement

Examination of work before covering up. In respect of the work which the Authority’s Engineer is entitled to examine, inspect, measure and/or test before it is covered up or put out of view or any part of the work is placed isplaced thereon, the Contractor shall give notice to the Authority’s Engineer whenever any such work is ready and before it is covered up. The Authority’s Engineer shall then either carry out carryout the examination, inspection or testing without unreasonable delay, or promptly give notice to the Contractor that the Authority’s Engineer does not require to do so. Provided, however, that if any work is of a continuous nature where it is not possible or prudent orprudent to keep it uncovered or incomplete, the Contractor shall notify the schedule of carrying out such work to give sufficient opportunity, not being less than 3 (three3(three) business days’ notice, to the Authority’s Engineer to conduct its inspection, measurement or measurementor test while the work is continuing. Provided further that in the event the Contractor receives no response from the Authority’s Engineer within a period of 3 (three) business days from the date on which the Contractor’s notice hereunder here under is delivered to the Authority’s Engineer, the Contractor shall be entitled to assume that the AuthoritytheAuthority’s Engineer would not undertake the said inspection.

Appears in 1 contract

Samples: Construction Contract

Examination of work before covering up. In respect of the work which the Authority’s Authority‟s Engineer is entitled to examine, inspect, measure and/or or test before it is covered up or put out of view or any part of the work is placed thereon, the Contractor Concessionaire shall give notice to the Authority’s Authority‟s Engineer whenever any such work is ready and before it is covered up. The Authority’s Authority‟s Engineer shall then either carry out the examination, inspection or testing without unreasonable delay, or promptly give notice to the Contractor Concessionaire that the Authority’s Authority‟s Engineer does not require to do so. Provided, however, that if any work is of a continuous nature where it is not possible or prudent to keep it uncovered or incomplete, the Contractor Concessionaire shall notify the schedule of carrying out such work to give sufficient opportunity, not being less than 3 (three) business days’ days‟ notice, to the Authority’s Authority‟s Engineer to conduct its inspection, measurement or test while the work is continuing. Provided further that in the event the Contractor Concessionaire receives no response from the Authority’s Authority‟s Engineer within a period of 3 (three) business days from the date on which the Contractor’s Concessionaire‟s notice hereunder is delivered to the Authority’s Authority‟s Engineer, the Contractor Concessionaire shall be entitled to assume that the Authority’s Authority‟s Engineer would not undertake the said inspection.

Appears in 1 contract

Samples: Concession Agreement