Clearance of the Site. During the provision of the Works, and as a pre-condition to the issue of the Taking- Over Certificate, the Contractor shall clear away and remove from the Site, all Contractor's equipment, surplus material, wreckage, rubbish and temporary Works, and shall keep the Site free from all unnecessary obstructions, and shall not store or dispose of any Contractor's equipment or surplus materials on the Site. The Contractor shall promptly clear away and remove from the Site any wreckage, rubbish or temporary Works no longer required and leave the Site and the Works in a clean and safe condition to the sole satisfaction of the Authority.
Clearance of the Site. All Temporary Works which are not to remain on the site after the completion of the Works shall be removed prior to completion of the Works or at other times as instructed by the Engineer. The site shall be cleared and reinstated to the lines and levels and to the same or better condition as existed before the Works started except as otherwise stated in the Agreement.
Clearance of the Site. During the provision of the Works, and as a pre-condition to the issue of the Taking- Over Certificate, the Contractor shall clear away and remove from the Site, all Contractor's equipment, surplus material, wreckage, rubbish and temporary Works, and shall keep the Site free from all unnecessary obstructions, and shall not store or dispose of any Contractor's equipment or surplus materials on the Site. The Contractor shall promptly clear away and remove from the Site any wreckage, rubbish or temporary Works no longer required and leave the Site and the Works in a clean and safe condition to the sole satisfaction of the Authority. (existing km 60.900 of old NH-40) to NH-106 (old NH-44E), (Package-II) km 12+800 to km 24+700 under SARDP- NE ‘Phase A’ in the State of Meghalaya on EPC Mode
Clearance of the Site. During the provision of the Works, and as a pre-condition to the issue of the Taking- Over Certificate, the Contractor shall clear away and remove from the Site, all Contractor's equipment, surplus material, wreckage, rubbish and temporary Works, and shall keep the Site free from all unnecessary obstructions, and shall not store or dispose of any Contractor's equipment or surplus materials on the Site. The Contractor shall promptly clear away and remove from the Site any wreckage, rubbish or temporary Works no longer required and leave the Site and the Works in a clean and safe condition to the sole satisfaction of the Authority. 81+000 (Design Chainage 65+923 to 80+930) of Dokmoka – LoringThepi Section (Package-3) of NH-29 in the state of Assam on EPC mode
Clearance of the Site. During the provision of the Works, and as a pre-condition to the issue of the Taking- Over Certificate, the Contractor shall clear away and remove from the Site, all Contractor's equipment, surplus material, wreckage, rubbish and temporary Works, and shall keep the Site free from all unnecessary obstructions, and shall not store or dispose of any Contractor's equipment or surplus materials on the Site. The Contractor shall promptly clear away and remove from the Site any wreckage, rubbish or temporary Works no longer required and leave the Site and the Works in a clean and safe condition to the sole satisfaction of the Authority. Bangladesh Border including Dawki Bridge from (Design km 10+670 to km 37+550) design length of 26.550 km in the State of Meghalaya for execution of EPC mode under JICA funding - (Package-II)-Balance Work
Clearance of the Site. (by Owner). Contractor will be responsible for the removal of obstructions to the Work that may be located on the Site other than those conditions or items expressly included within the Rough Site Grading, Underground Relocation or Site Demolition described in Section 5.1, 5.3.2 and 5.3.3 and for the clean up, disposal and removal of any matter related to such removal or arising in any way from the performance of such work. Before removing any such obstructions, Contractor will discuss and agree with Owner concerning the items to be removed. Contractor will follow any instructions that Owner may have with respect to such removal. Contractor will take all reasonable precautions necessary to avoid any damage to persons or any property during the course of any such removal work..
Clearance of the Site. During the provision of the Works, and as a pre-condition to the issue of the Taking- Over Certificate, the Contractor shall clear away and remove from the Site, all Contractor's equipment, surplus material, wreckage, rubbish and temporary Works, and shall keep the Site free from all unnecessary obstructions, and shall not store or Contract AgreementPage 39 of 145 Construction of 2 lane Minor Bridge at Km 26.700 (Dhanikhadi) in CRZ area on NH-4 in the Union Territory of Andaman & Nicobar Islands on EPC basis. Oct 2021 dispose of any Contractor's equipment or surplus materials on the Site. The Contractor shall promptly clear away and remove from the Site any wreckage, rubbish or temporary Works no longer required and leave the Site and the Works in a clean and safe condition to the sole satisfaction of the Authority. Contract AgreementPage 40 of 145 Construction of 2 lane Minor Bridge at Km 26.700 (Dhanikhadi) in CRZ area on NH-4 in the Union Territory of Andaman & Nicobar Islands on EPC basis. Oct 2021 Article 5
Clearance of the Site. During the provision of the Works, and as a pre-condition to the issue of the Taking- Over Certificate, the Contractor shall clear away and remove from the Site, all Contractor's equipment, surplus material, wreckage, rubbish and temporary Works, and shall keep the Site free from all unnecessary obstructions, and shall not store or dispose of any Contractor's equipment or surplus materials on the Site. The Contractor shall promptly clear away and remove from the Site any wreckage, rubbish or temporary Works no longer required and leave the Site and the Works in a clean and safe condition to the sole satisfaction of the Authority. 4.14 Deleted Contract Agreement Page 41 of 159 “Four Laning of Jhanji to Demow from Km. 491.050 to Km. 535.250 of NH-37 in the state of Assam under SARDP on Engineering Procurement and Construction (EPC) Mode. Page 42 of 159 “Four Laning of Jhanji to Demow from Km. 491.050 to Km. 535.250 of NH-37 in the state of Assam under SARDP on Engineering Procurement and Construction (EPC) Mode. April 2022
Clearance of the Site. During the provision of the Works, and as a pre-condition to the issue of the Taking- Over Certificate, the Contractor shall clear away and remove from the Site, all Contractor's equipment, surplus material, wreckage, rubbish and temporary Works, and shall keep the Site free from all unnecessary obstructions, and shall not store or dispose of any Contractor's equipment or surplus materials on the Site. The Contractor shall promptly clear away and remove from the Site any wreckage, rubbish or temporary Works no longer required and leave the Site and the Works in a clean and safe condition to the sole satisfaction of the Authority. Drafit Concession AgreementPage 40 of 145 Restoration & Rehabilitation of Road from Km 21.00 to Km 28.00 on NH-4 (old NH-233) in the Union Territory of Andaman & Nicobar Islands in the FY 2022-23 on EPC Basis Jun. 2022 Article 5
Clearance of the Site. During the provision of the Works, and as a pre-condition to the issue of the Taking- Over Certificate, the Contractor shall clear away and remove from the Site, all Contractor's equipment, surplus material, wreckage, rubbish and temporary Works, and shall keep the Site free from all unnecessary obstructions, and shall not store or dispose of any Contractor's equipment or surplus materials on the Site. The Contractor shall promptly clear away and remove from the Site any wreckage, rubbish or temporary Works no longer required and leave the Site and the Works in a clean and safe condition to the sole satisfaction of the Authority. Draft Contract AgreementPage 40 of 144 Construction of Uni-directional Tunnel i.e. length of 2.64/2.63km (Tube-1/Tube-2) and its approach (P-II) in the UT of J&K Jan. 2021 Article 5