Excavation Material Disposal Sample Clauses

Excavation Material Disposal. The disposal of excavation material shall be in accordance with specified compliance. Excavation material suitable to be utilized in the Works shall be stockpiled separately from materials to be disposed. The use of excavation material in the Works shall agree with the Employer’s Representative. Suitable materials shall, wherever possible, be transported directly from the required excavation to the various designated final locations. Excavated materials, not suitable for or in excess of the construction requirements, shall be disposed of in spoil areas designated by the Local Authorities or the Employer’s Representative. Unless otherwise provided for, spoil areas shall be built up in layers, with a maximum layer thickness of 0.6 m, and evenly compacted by the traffic of the construction equipment, aimed at minimizing future differential settlement. Final sloping and shaping of surfaces shall be as indicated on the Drawings. Other details of the work such as stabilization and drainage measures are shown on the Drawings. All activity by the Contractor at spoils areas shall be confined to the limits designated by the Local Authorities or the Employer’s Representative. The limits shall be clearly marked and, where directed barricaded to prevent traffic in areas outside the limits.
AutoNDA by SimpleDocs

Related to Excavation Material Disposal

  • Prohibition Against Selecting and Installing Products Containing Hazardous Materials The Contractor shall not select, install or otherwise incorporate any products or materials containing Hazardous Materials within the boundaries of the Site. Should the Contractor or any Subcontractors have knowledge that, or believe that, an item, component, material, substance, or accessory within a product or assembly selected by the Contractor or any Subcontractor may contain Hazardous Materials it is the Contractor’s responsibility to secure a written certification from the manufacturer of any suspected material which identifies the specific Hazardous Material(s) contained, together with the Material Safety Data Sheets (MSDS) for such materials which shall be submitted to the Owner and Design Professional.

  • Recyclable Materials “Recyclable Materials” means Solid Waste consisting of any material 371 which retains useful properties and can be reclaimed after the production or consumption process.

  • Unbundled Loop Concentration (ULC) System 2.5.1 BellSouth will provide to <<customer_name>> Unbundled Loop Concentration (ULC). Loop concentration systems in the central office concentrate the signals transmitted over local loops onto a digital loop carrier system. The concentration device is placed inside a BellSouth central office. BellSouth will offer ULC with a TR008 interface or a TR303 interface.

  • GARBAGE DISPOSAL, RECYCLING, AND BIODEGRADABLE MATERIALS A. Concessionaire shall be responsible for maintaining the cleanliness of the Concession Premises. Concessionaire shall ensure placement of all garbage and trash generated by the Concession Operation in designated containers and that said containers are emptied daily, or as more frequently required by Department, at a location within the Area designated by Department. Disposal costs from this latter location shall be borne by Department. Concessionaire shall provide such additional trash containers as may be required to keep the immediate Concession Premises clean at all times. The type of trash containers provided by Concessionaire shall be approved by Department prior to use.

  • Preservative-treated Wood Containing Arsenic Contractor may not purchase preservative-treated wood products containing arsenic in the performance of this Agreement unless an exemption from the requirements of Chapter 13 of the San Francisco Environment Code is obtained from the Department of the Environment under Section 1304 of the Code. The term “preservative-treated wood containing arsenic” shall mean wood treated with a preservative that contains arsenic, elemental arsenic, or an arsenic copper combination, including, but not limited to, chromated copper arsenate preservative, ammoniacal copper zinc arsenate preservative, or ammoniacal copper arsenate preservative. Contractor may purchase preservative-treated wood products on the list of environmentally preferable alternatives prepared and adopted by the Department of the Environment. This provision does not preclude Contractor from purchasing preservative-treated wood containing arsenic for saltwater immersion. The term “saltwater immersion” shall mean a pressure-treated wood that is used for construction purposes or facilities that are partially or totally immersed in saltwater.

  • Obligation to Notify Owner of Existing Hazardous Materials The Contractor shall immediately notify the Owner and the Design Professional, both orally and in writing, of the presence and location of any physical evidence of, or information regarding the presence of Hazardous Materials at the Site of which it becomes aware. If the Contractor encounters Hazardous Materials on the Site the Contractor shall (i) immediately stop performance of Work or that portion of the Work affected by or affecting such Hazardous Materials; (ii) secure the contaminated area against intrusion; (iii) not disturb or remove the Hazardous Materials; (iv) not proceed, or allow any subcontractor or supplier to proceed, with any Work or other activities in the area affected by such Hazardous Materials until such materials have been properly remediated and until directed in writing to do so by the Owner; and, (v) take any other steps necessary to protect life and health and the surrounding environment. The Contractor shall be entitled to adjustment of the Contract Time and the Contract Sum pursuant to Section 5, Part 2 of these General Conditions in order to compensate for the impact of any required demolition, re-work, shutdown, delay, protection of work, disruption, and start-up resulting from the encountering of such Hazardous Materials on the Site for which the Contractor is not responsible.

  • Direct Trunked Transport 7.3.2.1 Either Party may elect to purchase direct trunked transport from the other Party.

  • SIGNIFICANT LANDS INVENTORY FINDING Find that this activity is consistent with the use classification designated by the Commission for the land pursuant to Public Resources Code section 6370 et seq.

  • Environmental Contamination Neither Party shall in any event be liable to the other Party for any costs whatsoever resulting from the presence or release of any environmental hazard such Party did not cause or contribute to causing. Each Party shall, at the other Party's request, indemnify, defend, and hold harmless the other Party, each of its officers, directors and employees from and against any losses, damages, claims, demands, suits, liabilities, fines, penalties and expenses (including reasonable attorneys fees) that arise out of or from (i) any environmental hazard that such Party, its contractors or agents caused in the work locations or (ii) the presence or release of any environmental hazard for which such Party is responsible under Applicable Law. In the event both Parties contribute to such environmental hazard, they shall each proportionately bear such liability.

  • Unbundled Loop Concentration 2.8.5.1 Upon the Effective Date of this Amendment, the Unbundled Loop Concentration (ULC) element will no longer be offered by BellSouth and no new orders for ULC will be accepted. Any existing ULCs that were provisioned prior to the Effective Date of this Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to this Amendment and may remain connected, maintained and repaired according to BellSouth’s TR73600 until such time as they are disconnected by MyLineToo, or BellSouth provides ninety (90) calendar days notice that such ULC must be terminated.

Time is Money Join Law Insider Premium to draft better contracts faster.