BUILT UP Sample Clauses

BUILT UP. AREA shall mean the area of the unit to be allotted and shall include, inter alia the area of covered balcony attached thereto and also thickness of the outer walls, internal walls columns pillars therein Provided That if any wall column or pillar being common between two units then half of the area under such wall, column or pillar shall be included in each such unit to be certified by the Architects.
AutoNDA by SimpleDocs
BUILT UP. AREA shall mean the entire built-up area as sanctioned by the KMC as per approval of its Other Authorities , from time to time and shall include the plinth area of the units, including the plinth area of the bathrooms, balconies and terraces, if any, appurtenant thereto and also the thickness of the wall (external or internal) and pillars and the areas of the Common Portions.
BUILT UP. Sq. Ft., situated on the Floor of a Building known as standing on the plot of land bearing Survey Number : ,Road: , Location: , of Village: , situated within the revenue limits of Tehsil and Dist and situated within the limits of Municipal Corporation.
BUILT UP. AREA in relation to a flat shall mean the plinth area of that flat (including the area of balconies, and servants quarter, if any, appurtenant thereto) and also the thickness of the walls (external and internal), the columns and pillars therein.
BUILT UP. The apartments shall be constructed from concrete structures and roof top of corrugated or ega sheets and trusses of manufactured steel sections. The exterior wall cladding consisting of Hollow blocks (HCB) fixed to the concrete structures and beams. Electricity and plumbing are installed in the wall cavity created by the hollow blocks (HCB) and internal wall cladding. Magnesium Oxide board, or gypsum board or HCB fixed to the structure and hollow block (HCB) walls can be used for internal wall cladding.

Related to BUILT UP

  • Construction Completion The related Construction shall have been completed substantially in accordance with the related Plans and Specifications, the related Deed and all Applicable Laws, and such Leased Property shall be ready for occupancy and operation. All fixtures, equipment and other property contemplated under the Plans and Specifications to be incorporated into or installed in such Leased Property shall have been substantially incorporated or installed, free and clear of all Liens except for Permitted Liens.

  • Construction Schedule The progress schedule of construction of the Project as provided by Developer and approved by District.

  • As-Built Drawings Within thirty (30) Days of the successful completion of the Acceptance Test, Seller shall provide for Company review a set of the proposed as‑built drawings for the Company-Owned Interconnection Facilities constructed by Seller (and/or its Contractors). Within thirty (30) Days of Company's receipt of the proposed as‑built drawings, Company shall provide Seller with either (i) its comments on the proposed as‑built drawings or (ii) notice of acceptance of the proposed as‑built drawings as final as‑built drawings. If Company provides comments on the proposed as‑built drawings, Seller shall incorporate such comments into a final set of as‑built drawings and provide such final as‑built drawings to Company within twenty (20) Days of Seller's receipt of Company's comments.

  • As-Builts Seller shall provide final as-built drawings of the Seller-Owned Interconnection Facilities within 30 Days of the successful completion of the Acceptance Test.

  • Construction Phase Part 1 –

  • Construction Phase Fee Contractor’s Construction Phase Fee is the maximum amount payable to Contractor for any cost or profit expectation incurred in the performance of the Work that is not specifically identified as being eligible for reimbursement by Owner elsewhere in this Agreement. References in the UGSC to Contractor’s “overhead” and “profit” mean Contractor’s Construction Phase Fee. The Construction Phase Fee includes, but is not limited to, the following items: 9.1 All profit, profit expectations and costs associated with profit sharing plans such as personnel bonuses, incentives, and rewards; company stock options; or any other like expenses of Contractor.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CSTC chooses to subtend a Verizon access Tandem, CSTC’s NPA/NXX must be assigned by CSTC to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG. 9.2.2 CSTC shall establish Access Toll Connecting Trunks pursuant to applicable access Tariffs by which it will provide Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic to and from CSTC’s Customers. 9.2.3 The Access Toll Connecting Trunks shall be two-way trunks. Such trunks shall connect the End Office CSTC utilizes to provide Telephone Exchange Service and Switched Exchange Access to its Customers in a given LATA to the access Tandem(s) Verizon utilizes to provide Exchange Access in such LATA. 9.2.4 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access to allow CSTC’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier which is connected to a Verizon access Tandem.

  • Substantial Completion 9.8.1 When the Contractor considers that the Work, or a designated portion thereof which has been accepted in writing to by the State, is substantially complete as defined in Subparagraph

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • As-Built Plans Within thirty (30) days after completion of Tenant’s Changes requiring the submission of plans to Landlord, Tenant shall furnish to Landlord a complete set of “as-built” plans and specifications.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!