Excavation Size Required for Ventilation Sample Clauses

Excavation Size Required for Ventilation. The excavation size required for ventilation on basis of 1.1MTPA and 1.4 MTPA is shown in following tables. GEMTECH CONSULTANTS Pvt. Ltd. Page / 95 Xxxx Xxxxxxx X.X.Xxxxxxx X.X.Xxxxx A/10, Baramunda HB Colony, BBSR-3 RQP/BBS/023/2000/A RQP/NGP/027/87/A RQP/CAL/175/93/A Excavation size required for ventilation on basis of 1.4 MTPA Shaft/raise /drive Collar Bottom Depth Finished diameter Amount (㎡) Air flow Velocity (m/s) Air quantity (m3/s) Production shaft +182 -500m 682m Φ7.6m 45.34 5.470 248 RAR1 +77M -240m 317m 5.0m 19.63 11.717 230 RAR2 +182M -120M 302m 4.0m 12.56 9.395 118 Decline +100 -500M 18.56 5.388 100 Return air way +112M (Band-II) 3.0×3.0m 8.37 1.995 16.70 -60M (Band-I) 4.0×4.0m 14.57 5.842 85.12 -60M (Band-II) 3.0×3.0m 8.37 / / -120M (Band-II) 3.0×3.0m 8.37 / / -120M (Band-I) 3.0×3.0m 8.37 / / -156M (Band-I) 3.0×3.0m 8.37 5.766 48.26 -240M (Band-II) 4.5×4.5m 18.56 10.664 197.92 -380M (Band-I) 4.5×4.5m 18.56 5.332 98.96 Sublevel +112M (Band-II) 4.0×4.0m 14.57 1.146 16.70 +76M (Band-II) 4.0×4.0m 14.57 1.146 16.70 -60M (Band-I) 4.0×4.0m 14.57 3.051 44.46 -60M (Band-II) 4.0×4.0m 14.57 3.051 44.46 -120M (Band-I) -120M (Band-II) 4.0×4.0m 14.57 2.791 40.66 4.0×4.0m 14.57 2.791 40.66 -156M (Band-I) 4.0×4.0m 14.57 0.824 12.00 -240M (Band-I) 4.5×4.5m 18.56 1.030 15.00 Drive -240M (Band-II) 4.0×4.0m 14.57 3.312 48.26 -380M (Band-I) 4.5×4.5m 18.56 5.332 98.96 -500M (Band-I) 4.5×4.5m 18.56 5.332 98.96 Return air raise +112M +76M 36m Φ3.0m 7.07 5.751 40.66 Intake air raise -60M -120M 60m Φ3.0m 7.07 5.751 40.66 Return air raise -60M -120M 60m Φ3.0m 7.07 5.751 40.66 Intake air raise -60M -156M 96m Φ3.0m 7.07 6.289 44.46 Return air raise -60M -156M 96m Φ3.0m 7.07 6.289 44.46 Intake air raise -156M -240M 84m Φ3.5m 9.62 9.638 92.97 Return air raise -156M -240M 84m Φ3.0m 7.07 6.826 48.26 Intake air raise -240M -380M 130m Φ3.5m 9.62 10.287 98.96 Return air raise -240M -380M 130m Φ5.0m 19.63 10.083 197.92 Intake air raise -380M -500M 130m Φ4.0m 12.56 7.879 98.96 Return air raise -380M -500M 130m Φ4.0m 12.56 7.879 98.96
AutoNDA by SimpleDocs

Related to Excavation Size Required for Ventilation

  • Electrical Safety Only UL approved items are permitted in Housing & Residence Life. Extension and multi-use cords must be heavy duty, single plug, and be UL approved. Altering or adapting electrical outlets and equipment and overloading circuits jeopardize safety and thus are not permitted.

  • No Storing Hazardous Articles Not to keep or store any offensive, combustible, obnoxious, hazardous or dangerous articles in the said Apartment, the Common Areas, and the Building.

  • Additional Requirements for Sleeping Rooms The Contractor shall provide departing Attendees a secured area for storing belongings.

  • Completion of Concrete Pours and Emergency Work 24.14.1 Except as provided in this sub-clause an employee shall not work or be required to work in the rain.

  • Fill, Backfill and Landscaping No soil found on Site, or transported to the Site from remote locations, which contains debris or waste or Hazardous Materials shall be used for fill, backfill or landscaping topsoil.

  • Excavation If any excavation shall be made upon land adjacent to or under the Building, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter the Premises for the purpose of performing such work as said person shall deem necessary or desirable to preserve and protect the Building from injury or damage and to support the same by proper foundations, without any claim for damages or liability against Landlord and without reducing or otherwise affecting Tenant’s obligations under this Lease.

  • Walls 12 Developer shall provide rustication patterns on all walls, except drainage headwalls, in Aesthetic 13 Area 3 in accordance with Exhibit L2.24 of the LAADCR. The final designs shall resemble these 14 simulations.

  • Road Surfaces (1) Grade, shape, crown, and/or outslope surface and shoulders.

  • Dangerous Goods, Special Wastes, Pesticides and Harmful Substances Where employees are required to work with or are exposed to any dangerous good, special waste, pesticide or harmful substance, the Employer shall ensure that the employees are adequately trained in the identification, safe handling, use, storage, and/or disposal of same.

  • NOISE/WASTE The Tenant agrees not to commit waste on the premises, maintain, or permit to be maintained, a nuisance thereon, or use, or permit the premises to be used, in an unlawful manner. The Tenant further agrees to abide by any and all local, county, and State noise ordinances.

Time is Money Join Law Insider Premium to draft better contracts faster.