ROAD DIMENSIONS Purchaser shall perform road work in accordance with the dimensions shown on the TYPICAL SECTION SHEET and the specifications within this road plan.
Excellent Above Average Satisfactory Needs Improvement Unsatisfactory 5 4 3 2 1 5. The instructor demonstrates knowledge of the subject matter.
ROAD TOLERANCES Purchaser shall perform road work within the tolerances listed below. The tolerance class for each road is listed on the TYPICAL SECTION SHEET. Tolerance Class A B C Road and Subgrade Width (feet) +1.5 +1.5 +2.0 Subgrade Elevation (feet +/-) 0.5 1.0 2.0 Centerline alignment (feet lt./rt.) 1.0 1.5 3.0 1-6 ORDER OF PRECEDENCE Any conflict or inconsistency in the road plan will be resolved by giving the documents precedence in the following order:
Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.
Target Population The Grantee shall ensure that diversion programs and services provided under this grant are designed to serve juvenile offenders who are at risk of commitment to Department.
Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.
STATEWIDE ACHIEVEMENT TESTING When CONTRACTOR is an NPS, per implementation of Senate Bill 484, CONTRACTOR shall administer all Statewide assessments within the California Assessment of Student Performance and Progress (“CAASP”), Desired Results Developmental Profile (“DRDP”), California Alternative Assessment (“CAA”), achievement and abilities tests (using LEA-authorized assessment instruments), the Fitness Gram with the exception of the English Language Proficiency Assessments for California (“ELPAC”) to be completed by the LEA, and as appropriate to the student, and mandated by XXX xxxxxxxx to LEA and state and federal guidelines. CONTRACTOR is subject to the alternative accountability system developed pursuant to Education Code section 52052, in the same manner as public schools. Each LEA student placed with CONTRACTOR by the LEA shall be tested by qualified staff of CONTRACTOR in accordance with that accountability program. XXX shall provide test administration training to CONTRACTOR’S qualified staff. CONTRACTOR shall attend LEA test training and comply with completion of all coding requirements as required by XXX.
Evaluation Cycle: Annual Orientation A) At the start of each school year, the superintendent, principal or designee shall conduct a meeting for Educators and Evaluators focused substantially on educator evaluation. The superintendent, principal or designee shall:
Benefit Level Two Health Care Network Determination Issues regarding the health care networks for the 2017 insurance year shall be negotiated in accordance with the following procedures:
System Impact Study An assessment by the Transmission Provider of (i) the adequacy of the Transmission System to accommodate a Completed Application, an Interconnection Request or an Upgrade Request, (ii) whether any additional costs may be incurred in order to provide such transmission service or to accommodate an Interconnection Request, and (iii) with respect to an Interconnection Request, an estimated date that an Interconnection Customer’s Customer Facility can be interconnected with the Transmission System and an estimate of the Interconnection Customer’s cost responsibility for the interconnection; and (iv) with respect to an Upgrade Request, the estimated cost of the requested system upgrades or expansion, or of the cost of the system upgrades or expansion, necessary to provide the requested incremental rights.