FAT/SAT Acceptance Testing. This represents an iteration of testing levels that collectively provide verification of the RAN equipment against the overall requirements. Testing will encompass in-house factory acceptance testing of the SAS equipment, on-site acceptance testing of the SAS and ground segment acceptance testing between the SAS (via the regional satellite) and other sites in the architecture (e.g. regional AOC, regional GS, etc.). Requirements for this testing are discussed in Section 7.6.
AutoNDA by SimpleDocs
FAT/SAT Acceptance Testing. This represents an iteration of testing levels that collectively provide verification of the delivered equipment against the overall requirements. Testing will encompass in-house factory acceptance testing, on-site acceptance testing and wider cross-site ground network system testing between the CN and other BGAN subsystems and terrestrial networks. Requirements for this testing are discussed in Section 7.5.

Related to FAT/SAT Acceptance Testing

  • Acceptance Testing The MCP must have the capability to report all elements in the Minimum Data Set as set forth in the ODJFS Encounter Data Specifications and must submit a test file in the ODJFS-specified medium in the required formats prior to contracting or prior to an information systems replacement or update. Acceptance testing of encounter data is required as specified in Section 29(a)(v) of this Appendix.

  • Performance Tests Contractor shall perform Performance Tests in accordance with Section 11.2 of the Agreement and Attachment S.

  • Technical Specifications Each Bloom System is an integrated system comprised of a fuel cell stack assembly and associated balance of plant components that converts a fuel into electricity using electrochemical means that (i) has a Nameplate Capacity of at least 0.5 kilowatts of electricity using an electrochemical process and (ii) has an electricity-only generation efficiency greater than thirty percent (30%).

  • Product Acceptance (a) The Products delivered by Flextronics will be inspected and tested as required by Customer within **** of receipt at the “ship to” location on the applicable purchase order. If Products do not comply with the express limited warranty set forth in Section 6.2 below, Customer has the right to reject such Products during said period. Products not rejected during said period will be deemed accepted. Customer may return defective Products, freight collect, after obtaining a return material authorization number from Flextronics to be displayed on the shipping container and completing a failure report. Rejected Products will be promptly repaired or replaced, at Flextronics’s option, and returned freight pre-paid. Customer shall bear all of the risk, and all costs and expenses, associated with Products that have been returned to Flextronics for which there is no defect found, subject to Section 6.1(b).

  • Product Testing Upon request, Customer shall provide Operator a laboratory report for each Product delivery by Customer or Customer’s supplier. Operator will not be obligated to receive Contaminated Product for throughput through the Pipelines, nor will Operator be obligated to accept Product that fails to meet the applicable quality specifications for the Berths under the BAUTA and any Terminal Service Orders issued thereunder.

  • Facility Type    Call Sign    Exp Date TV Broadcast Station License WBRE-TV 08/01/2007 (Channel 28, Xxxxxx-Xxxxx, Pennsylvania) DTV Facility WBRE-DT 08/01/2007 (Channel 11, Xxxxxx-Xxxxx, Pennsylvania) TV Translator Station License W24BL 08/01/2007 TV Translator Station License W30AN 08/01/2007 TV Translator Station License W51BP 08/01/2007 TV Translator Station License W64AL 08/01/2007 Transmit-Only Earth Station License E910642 11/01/2011 Transmit-Receive Earth Station License E020058 05/03/2017 TV Pickup KA35201 08/01/2007 TV Pickup KA35245 08/01/2007 TV Pickup KA74870 08/01/2007 TV Pickup KC62824 08/01/2007 Broadcast Auxiliary KF5726 08/01/2007 TV Studio Transmitter Link KGH66 08/01/2007 R/P Base Mobile System KGU973 08/01/2007 TV Pickup KK4138 08/01/2007 TV Pickup KL2535 08/01/2007 TV Pickup KP4407 08/01/2007 R/P Base Mobile System KQB618 08/01/2007 TV Pickup KR7688 08/01/2007 TV Pickup KR7693 08/01/2007 TV Pickup KR7771 08/01/2007 TV Pickup KS2001 08/01/2007 TV Pickup KY2899 08/01/2007 R/P Mobile KY5608 08/01/2007 TV Studio Transmitter Link KZO21 08/01/2007 TV Intercity Relay WFW575 08/01/2007 TV Intercity Relay WGI290 08/01/2007 TV Intercity Relay WHB674 08/01/2007 TV Intercity Relay WLI324 08/01/2007 TV Intercity Relay WLI325 08/01/2007 TV Intercity Relay WLI337 08/01/2007 TV Intercity Relay WMF322 08/01/2007 TV Intercity Relay WMF323 08/01/2007

  • Stability Testing Patheon may be requested to conduct stability testing on the Products in accordance with the protocols set out in the Specifications for the separate fees and during the time periods set out in Schedule C to a Product Agreement. Patheon will not make any changes to these testing protocols without prior written approval from Client. If a confirmed stability test failure occurs, Patheon will notify Client within one Business Day, after which Patheon and Client will jointly determine the proceedings and methods to be undertaken to investigate the cause of the failure, including which party will bear the cost of the investigation. Patheon will not be liable for these costs unless it has failed to perform the Manufacturing Services in accordance with the Specifications, cGMPs, and Applicable Laws. Patheon will give Client ail stability test data and results at Client’s request.

  • Final Acceptance 1. Within thirty (30) days of the date of receipt by Purchaser and Independent Engineer of the Final Commissioning Report, the Purchaser shall issue a Certificate of Final Acceptance or reject such Report. If the Purchaser neither issues a Certificate of Final Acceptance nor rejects such Report within such thirty (30) day period, then the Date of Final Acceptance of the System shall be deemed to be the date such Final Commissioning Report was received by the Purchaser.

  • Supplier Selection If Customer selects a seat or galley supplier that is not on the Boeing recommended list, such seat or galley will become BFE and the provisions of Exhibit A, Buyer Furnished Equipment Provisions Document, of the AGTA will apply.

  • Statement of Work Independently and not as an agent of the Government, the Contractor shall furnish all the necessary services, qualified personnel, material, equipment, and facilities, not otherwise provided by the Government as needed to perform the Statement of Work, SECTION J, ATTACHMENT 1, April 30, 2004, attached hereto and made a part of this contract.

Time is Money Join Law Insider Premium to draft better contracts faster.