Factory Acceptance Testing definition

Factory Acceptance Testing or “FAT” means the act of performing the tests required to be carried out on the ATFM System in accordance with the Factory Acceptance Test Procedures prepared by the Contractor as a Contract requirement and in accordance with the Management Plan;
Factory Acceptance Testing or “FAT” means Buyer’s pre-delivery testing to confirm that Equipment meets the Testing Criteria prior to delivery.
Factory Acceptance Testing or “FAT” means the act of performing the tests required to be carried out on the VHF Equipment/infrastructure and equipment shelters in accordance with the Factory Acceptance Test Procedures prepared by the Contractor as a Contract requirement and in accordance with the Management Plan;

Examples of Factory Acceptance Testing in a sentence

  • During the Factory Acceptance Testing the CPT will assist the DCA CYPRUS representatives in their duties and will supervise the procedures.

  • Factory Acceptance Testing of the complete control package shall be performed using Vendor's standard testing procedures.

  • Such Tests shall include: (i) First Article Inspection (FAI); (ii) Factory Acceptance Testing (FAT); (iii) Factory Integration Testing (FIT); (iv) Production Inspection & Testing; (v) Post- Production Testing; (vi) Systems Integration Lab Testing; (vii) Systems Integration Field Testing; (viii) Pilot Testing; and (ix) Revenue Service Acceptance Testing.

  • The Government reserves the right to witness all Factory Acceptance Testing.

  • It is anticipated that a System Integration Test (SIT) and a Factory Acceptance Testing (FAT) will take place prior to the new PLC control panels being shipped to the project site.

  • Testing for the IUSA The parties must undertake Factory Acceptance Testing and Site Acceptance Testing of the IUSA in accordance with the Delivery Specification.

  • Manufacture & fabrication As per Schindler design Factory acceptance testing (FAT) The Contractor is required to conduct the necessary Factory Acceptance Testing (FAT) and Site Acceptance Testing (SIT) of the Plant.

  • Pieneman 2/N3 ISS3CY_N3AU -O- Audit TBD during Detailed Workplan definition 3/N3 ISS3CY_N3FI Factory Acceptance Testing “ 4/N3 ISS3CY_N3NA Site Acceptance Testing “ 5/N3 ISS3CY_N3PA Provisional Acceptance Testing “ 6/N3 ISS3CY_N3SE System Evaluation RASS EVALUATION TEAM (led by X.

  • Pre-works Tests The Contractor shall carry out both pump tests and an MCC pre-works test before the Factory Acceptance Testing (FAT) to ensure that it functions correctly and meets the specification.

  • The SSVs’ planned events and schedules shall be reviewed to confirm integration and adherence to the Contractor’s DD&C efforts including regulatory body submittal and approval status, SSV Data Item submittals, procurement/construction, Factory Acceptance Testing, equipment delivery dates and equipment landing dates based on identified contractor need dates.


More Definitions of Factory Acceptance Testing

Factory Acceptance Testing. [has the meaning given in the Delivery Specification].
Factory Acceptance Testing. The CONSULTANT shall perform a witnessed functional test of the Switchgear and MCC’s at their respective manufacturing facilities. Substantial/Final Completion: The CONSULTANT shall ensure that the Contractor has satisfied all the expressed requirements to fulfill substantial and final completion criteria.

Related to Factory Acceptance Testing

  • Acceptance Test is a test of the Features executed by the Customer to prepare the acceptance.

  • Operational Acceptance means the acceptance by the Procuring Entity of the Facilities (or any part of the Facilities where the Contract provides for acceptance of the Facilities in parts), which certifies the Contractor's fulfillment of the Contract in respect of Functional Guarantees of the Facilities (or the relevant part thereof) in accordance with the provisions of GCC Clause 28 (Functional Guarantees) hereof and shall include deemed acceptance in accordance with GCC Clause 25 (Commissioning and Operational Acceptance) hereof.

  • Delivery Location means the Supplier's premises or other location where the Services are to be supplied, as set out in the Order;

  • Design-Build Agreement means the design and construction agreement between Project Co and the Design-Builder, a certified copy of which has been delivered by Project Co to the Authority, as amended, supplemented or replaced from time to time in accordance with this Agreement;

  • Drug test means a test designed to detect the illegal use of a controlled substance.

  • Service Specification means and include detailed description, statements to technical data, performance characteristics, and standards (Indian as well as) as applicable and as specified in the Contract as well as those specifications relating to Industry standards and codes applicable to the performance of the work, work performance quality and the specifications affecting the works or any additional specification required to be produced by the DCO to meet the design criteria.

  • Start-Up Testing means the completion of applicable required factory and start-up tests as set forth in Exhibit C.

  • Acceptance Test Document means a document, which defines procedures for testing the functioning of installed system. The document will be finalized with the contractor within 7 days of issuance of the Letter of Award.