Examples of Factory Acceptance Testing in a sentence
During the Factory Acceptance Testing the CPT will assist the DCA CYPRUS representatives in their duties and will supervise the procedures.
Factory Acceptance Testing of the complete control package shall be performed using Vendor's standard testing procedures.
Such Tests shall include: (i) First Article Inspection (FAI); (ii) Factory Acceptance Testing (FAT); (iii) Factory Integration Testing (FIT); (iv) Production Inspection & Testing; (v) Post- Production Testing; (vi) Systems Integration Lab Testing; (vii) Systems Integration Field Testing; (viii) Pilot Testing; and (ix) Revenue Service Acceptance Testing.
The Government reserves the right to witness all Factory Acceptance Testing.
It is anticipated that a System Integration Test (SIT) and a Factory Acceptance Testing (FAT) will take place prior to the new PLC control panels being shipped to the project site.
Testing for the IUSA The parties must undertake Factory Acceptance Testing and Site Acceptance Testing of the IUSA in accordance with the Delivery Specification.
Manufacture & fabrication As per Schindler design Factory acceptance testing (FAT) The Contractor is required to conduct the necessary Factory Acceptance Testing (FAT) and Site Acceptance Testing (SIT) of the Plant.
Pieneman 2/N3 ISS3CY_N3AU -O- Audit TBD during Detailed Workplan definition 3/N3 ISS3CY_N3FI Factory Acceptance Testing “ 4/N3 ISS3CY_N3NA Site Acceptance Testing “ 5/N3 ISS3CY_N3PA Provisional Acceptance Testing “ 6/N3 ISS3CY_N3SE System Evaluation RASS EVALUATION TEAM (led by X.
Pre-works Tests The Contractor shall carry out both pump tests and an MCC pre-works test before the Factory Acceptance Testing (FAT) to ensure that it functions correctly and meets the specification.
The SSVs’ planned events and schedules shall be reviewed to confirm integration and adherence to the Contractor’s DD&C efforts including regulatory body submittal and approval status, SSV Data Item submittals, procurement/construction, Factory Acceptance Testing, equipment delivery dates and equipment landing dates based on identified contractor need dates.