FISCAL PROVISIONS. 1. All contractual obligations of STATE are subject to the appropriation of resources by the Legislature and the allocation of resources by the CTC. 2. STATE'S financial commitment of STATE FUNDS will occur only upon the execution of this AGREEMENT, the execution of each project-specific PROGRAM SUPPLEMENT and/or STATE's approved finance letter. 3. ADMINISTERING AGENCY agrees, as a minimum, to submit invoices in arrears for reimbursement of allowable PROJECT costs at least once every six months commencing after the STATE FUNDS are encumbered on either the project-specific PROGRAM SUPPLEMENT or through a project-specific finance letter approved by STATE. STATE reserves the right to suspend future allocations and invoice payments for any on-going or future STATE FUNDED project performed by ADMINISTERING AGENCY if PROJECT costs have not been invoiced by ADMINISTERING AGENCY for a six-month period 4. Invoices shall be submitted on a standardized billing summary template, in accordance with Chapter 5 of the LAPM to claim reimbursement by ADMINISTERING AGENCY. For construction invoices, pay estimates must be included. 5. ADMINISTERING AGENCY must retain at least one copy of supporting backup documentation for allowable costs incurred and claimed for reimbursement by ADMINISTERING AGENCY. ADMINISTERING AGENCY agrees to submit supporting backup documentation with invoices if requested by State. Acceptable backup documentation includes, but is not limited to, agency's progress payment to the contractors, copies of cancelled checks showing amounts made payable to vendors and contractors, and/or a computerized summary of PROJECT costs. 6. Payments to ADMINISTERING AGENCY can only be released by STATE as reimbursements of actual allowable PROJECT costs already incurred and paid for by the ADMINISTERING AGENCY. 7. Indirect Cost Allocation Plans/Indirect Cost Rate Proposals (ICAP/ICRP), Central Service Cost Allocation Plans and related documentation are to be prepared and provided to the Inspector General – Independent Office of Audits and Investigations for review and approval prior to ADMINISTERING AGENCY seeking reimbursement of indirect cost incurred within each fiscal year being claimed for reimbursement. ICAPs/ICRPs must be prepared in accordance with the requirements set forth in 2 CFR, Part 200, Chapter 5 of the LAPM, and the ICAP/ICRP approval procedures established by STATE. 8. STATE will withhold the greater of either two (2) percent of the total of all STATE FUNDS encumbered for each PROGRAM SUPPLEMENT or $40,000 until ADMINISTERING AGENCY submits the Final Report of Expenditures for each completed PROGRAM SUPPLEMENT PROJECT. 9. The estimated total cost of PROJECT, the amount of STATE FUNDS obligated, and the required matching funds may be adjusted by mutual consent of the PARTIES with a finance letter, and an allocation notification letter when applicable. STATE FUNDING may be increased to cover PROJECT cost increases only if such additional funds are available and the CTC and/or STATE concurs with that increase in the form of an allocation and finance letter. 10. When such additional STATE FUNDS are not available, ADMINISTERING AGENCY agrees that any increases in PROJECT costs must be defrayed with ADMINISTERING AGENCY's own funds. 11. ADMINISTERING AGENCY shall use its own non-STATE FUNDS to finance the local share of eligible costs and all PROJECT expenditures or contract items ruled ineligible for financing with STATE FUNDS. STATE shall make the final determination of ADMINISTERING AGENCY's cost eligibility for STATE FUNDED financing with respect to claimed PROJECT costs. 12. ADMINISTERING AGENCY will reimburse STATE for STATE's share of costs for work performed by STATE at the request of ADMINISTERING AGENCY. STATE's costs shall include overhead assessments in accordance with section 8755.1 of the State Administrative Manual. 13. STATE FUNDS allocated by the CTC and/or STATE are subject to the timely use of funds provisions approved in CTC Guidelines and State procedures approved by the CTC and STATE. 14. STATE FUNDS encumbered for PROJECT are available for liquidation only for a limited period from the beginning of the State fiscal year when those funds were appropriated in the State Budget. STATE FUNDS not liquidated within these periods will be reverted unless a Cooperative Work Agreement (CWA) is submitted by ADMINISTERING AGENCY and approved by the California Department of Finance in accordance with Section 16304 of the Government Code. The exact date of fund reversion will be reflected in the STATE signed PROJECT finance letter. 15. Payments to ADMINISTERING AGENCY for PROJECT-related travel and subsistence (per diem) expenses of ADMINISTERING AGENCY forces and its contractors and subcontractors claimed for reimbursement or as local match credit shall not exceed rates authorized to be paid to rank and file STATE employees under current California Department of Human Resources (CalHR) rules unless a Cooperative Work Agreement (CWA) is submitted by ADMINISTERING AGENCY and approved by the California Department of Finance in accordance with Government Code section 16304. If the rates invoiced by ADMINISTERING AGENCY are in excess of CalHR rates, ADMINISTERING AGENCY is responsible for the cost difference, and any overpayments inadvertently paid by STATE shall be reimbursed to STATE by ADMINISTERING AGENCY on demand. 16. ADMINISTERING AGENCY agrees to comply with California Government Code 4525- 4529.
Appears in 1 contract
Samples: Master Agreement
FISCAL PROVISIONS. 1. All contractual obligations of STATE are subject to the appropriation of resources by the Legislature and the allocation of resources by the CTC.
2. STATE'S financial commitment of STATE FUNDS will occur only upon the execution of this AGREEMENT, the execution of each project-specific PROGRAM SUPPLEMENT and/or STATE's approved finance letter.
3. ADMINISTERING AGENCY may submit signed duplicate invoices in arrears for reimbursement of allowable PROJECT costs on a monthly or quarterly progress basis once the project-specific PROGRAM SUPPLEMENT has been executed by STATE. ADMINISTERING AGENCY agrees, as a minimum, to submit invoices in arrears for reimbursement of allowable PROJECT costs at least once every six months commencing after the STATE FUNDS are encumbered on either the project-specific PROGRAM SUPPLEMENT or through a project-specific finance letter approved by STATE. STATE reserves the right to suspend future allocations and invoice payments for any on-going or future STATE FUNDED project performed by ADMINISTERING AGENCY if PROJECT costs have not been invoiced by ADMINISTERING AGENCY for a six-month period 4. Invoices shall be submitted on a standardized billing summary template, ADMINISTERING AGENCY letterhead that includes the address of ADMINISTERING AGENCY and shall be formatted in accordance with Chapter 5 of the LAPM to claim reimbursement by ADMINISTERING AGENCYLAPM. For construction invoices, pay estimates Invoices must be included.
5. ADMINISTERING AGENCY must retain have at least one copy of supporting backup documentation for allowable costs incurred and claimed for reimbursement by ADMINISTERING AGENCY. ADMINISTERING AGENCY agrees to submit supporting backup documentation with invoices if requested by State. Acceptable backup documentation includes, but is not limited to, agency's progress payment to the contractors, copies of cancelled checks showing amounts made payable to vendors and contractors, and/or a computerized summary of PROJECT costs.
6. Payments to ADMINISTERING AGENCY can only be released by STATE as reimbursements of actual allowable PROJECT costs already incurred and paid for by the ADMINISTERING AGENCY.
7. Indirect Cost Allocation Plans/Indirect Cost Rate Proposals (ICAP/ICRP), Central Service Cost Allocation Plans An indirect cost allocation plan and related documentation are to be prepared and provided to the Inspector General – Independent Office of STATE (Caltrans Audits and Investigations & Investigations) annually for review and approval prior to ADMINISTERING AGENCY seeking reimbursement of indirect cost incurred within each fiscal year being claimed for reimbursement. ICAPs/ICRPs The indirect cost allocation plan must be prepared in accordance with the requirements set forth in 2 CFR, Part 200, Office of Management and Budget Circular A-87 and Chapter 5 4 of the LAPM, and the ICAP/ICRP approval procedures established by STATE.
8Local Assistance Procedures Manual. STATE will withhold the greater of either two (2) percent of the total of all STATE FUNDS encumbered for each PROGRAM SUPPLEMENT or $40,000 until ADMINISTERING AGENCY submits the Final Report of Expenditures for each completed PROGRAM SUPPLEMENT PROJECT.
9. The estimated total cost of PROJECT, the amount of STATE FUNDS obligated, and the required matching funds may be adjusted by mutual consent of the PARTIES with a an allocation letter and finance letter, and an allocation notification letter when applicable. STATE FUNDING may be increased to cover PROJECT cost increases only if such additional funds are available and the CTC and/or STATE concurs with that increase in the form of an allocation and finance letter.
10. When such additional STATE FUNDS are not available, ADMINISTERING AGENCY agrees that any increases in PROJECT costs must be defrayed with ADMINISTERING AGENCY's own funds.
11. ADMINISTERING AGENCY shall use its own non-non STATE FUNDS to finance the local share of eligible costs and all PROJECT expenditures or contract items ruled ineligible for financing with STATE FUNDS. STATE shall make the final determination of ADMINISTERING AGENCY's cost eligibility for STATE FUNDED financing with respect to claimed PROJECT costs.
12. ADMINISTERING AGENCY will reimburse STATE for STATE's share of costs for work performed by STATE at the request of ADMINISTERING AGENCY. STATE's costs shall include overhead assessments in accordance with section 8755.1 of the State Administrative Manual.
13. STATE FUNDS allocated by from the CTC and/or STATE STIP are subject to the timely use of funds provisions enacted by Senate Bill 45, approved in CTC 1997, and subsequent STIP Guidelines and State procedures approved by the CTC and STATE.
14. STATE FUNDS encumbered for PROJECT are available for liquidation only for a limited period five (5) years from the beginning of the State fiscal year when those funds were appropriated in the State Budget. STATE FUNDS not liquidated within these periods will be reverted unless a Cooperative Work Agreement (CWA) is submitted by ADMINISTERING AGENCY and approved by the California Department of Finance in accordance with Section 16304 of the Government CodeCode section 16304. The exact date of fund reversion will be reflected in the STATE signed PROJECT finance letter.
15. Payments to ADMINISTERING AGENCY for PROJECT-related travel and subsistence (per diem) expenses of ADMINISTERING AGENCY forces and its contractors and subcontractors claimed for reimbursement or as local match credit shall not exceed rates authorized to be paid to rank and file STATE employees under current California State Department of Human Resources Personnel Administration (CalHRDPA) rules unless a Cooperative Work Agreement (CWA) is submitted by ADMINISTERING AGENCY and approved by the California Department of Finance in accordance with Government Code section 16304rules. If the rates invoiced by ADMINISTERING AGENCY are in excess of CalHR DPA rates, ADMINISTERING AGENCY is responsible for the cost difference, and any overpayments inadvertently paid by STATE shall be reimbursed to STATE by ADMINISTERING AGENCY on demand.
16. ADMINISTERING AGENCY agrees to comply with California Government Code 4525- 4529Office of Management and Budget (OMB) Circular A-87, Cost Principles for State and Local Governments, and 49 CFR, Part 18, Uniform Administrative Requirements for Grants and Cooperative Agreements to State and Local Governments. ADMINISTERING AGENCY agrees, and will assure that its contractors and subcontractors will be obligated to agree that (a) Contract Cost Principles and Procedures, 48 CFR, Federal Acquisition Regulations System, Chapter 1, Part 31, et seq., shall be used to determine the allow ability of individual PROJECT cost items and (b) those parties shall comply with federal administrative procedures in accordance with 49 CFR, Part 18, Uniform Administrative Requirements for Grants and Cooperative Agreements to State and Local Governments. Every sub-recipient receiving PROJECT funds as a contractor or sub-contractor under this AGREEMENT shall comply with Federal administrative procedures in accordance with 49 CFR, Part 18, Uniform Administrative Requirements for Grants and Cooperative Agreements to State and Local Governments. ADMINISTERING AGENCY agrees to comply with the provisions set forth in 23 CFR Parts 140, 645 and 646 when contracting with railroad and utility companies. Any PROJECT costs for which ADMINISTERING AGENCY has received payment or credit that are determined by subsequent audit to be unallowable under OMB Circular A-87, 48 CFR, Chapter 1, Part 31, 23 CFR Parts 140, 645 and 646 or 49 CFR, Part 18, are subject to repayment by ADMINISTERING AGENCY to STATE. Upon written demand by STATE, any overpayment to ADMINISTERING AGENCY of amounts invoiced to STATE shall be returned to STATE. Should ADMINISTERING AGENCY fail to refund any moneys due STATE as provided herein or should ADMINISTERING AGENCY breach this AGREEMENT by failing to complete PROJECT without adequate justification and approval by STATE, then, within thirty (30) days of demand, or within such other period as may be agreed to in writing between the PARTIES hereto, STATE, acting through the State Controller, the State Treasurer, the CTC or any other public entity or agency, may intercept, withhold and demand the transfer of an amount equal to the amount paid by or owed to STATE for each PROJECT, from future apportionments, or any other funds due ADMINISTERING AGENCY from the Highway Users Tax Fund or any other sources of funds, and/or may also withhold approval of future STATE FUNDED projects proposed by ADMINISTERING AGENCY. Should ADMINISTERING AGENCY be declared to be in breach of this AGREEMENT or otherwise in default thereof by STATE, and if ADMINISTERING AGENCY is constituted as a joint powers authority, special district, or any other public entity not directly receiving funds through the State Controller, STATE is authorized to obtain reimbursement from whatever sources of funding are available, including the withholding or transfer of funds, pursuant to Article IV - 21, from those constituent entities comprising a joint powers authority or by bringing of an action against ADMINISTERING AGENCY or its constituent member entities, to recover all funds provided by STATE hereunder. ADMINISTERING AGENCY acknowledges that the signatory party represents the ADMINISTERING AGENCY and further warrants that there is nothing within a Joint Powers Agreement, by which ADMINISTERING AGENCY was created, if any exists, that would restrict or otherwise limit STATE's ability to recover STATE FUNDS improperly spent by ADMINISTERING AGENCY in contravention of the terms of this AGREEMENT.
Appears in 1 contract
Samples: Master Agreement
FISCAL PROVISIONS. 1. All contractual obligations of STATE are subject to the appropriation of resources by the Legislature and the allocation of resources by the California Transportation Commission (CTC).
2. STATE'S ’S financial commitment of STATE FUNDS Federal Funds will occur only upon the execution of this AGREEMENT, the authorization of the project-specific E-76 or E-76 (XXXX), the execution of each project-specific PROGRAM SUPPLEMENT and/or SUPPLEMENT, and STATE's ’s approved finance letter.
3. ADMINISTERING AGENCY may submit signed duplicate invoices in arrears for reimbursement of participating PROJECT costs on a monthly or quarterly progress basis once the project-specific PROGRAM SUPPLEMENT has been executed by STATE.
4. ADMINISTERING AGENCY agrees, as a minimum, to submit invoices in arrears for reimbursement of allowable PROJECT costs at least once every six (6) months commencing after the STATE FUNDS funds are encumbered on either the project-specific PROGRAM SUPPLEMENT or through a project-specific finance letter approved by STATE. STATE reserves the right to suspend future allocations authorizations/obligations, and invoice payments for any on-going or future STATE FUNDED federal-aid project performed by ADMINISTERING AGENCY if PROJECT costs have not been invoiced by ADMINISTERING AGENCY for a six-six (6) month period 4period
5. Invoices shall be submitted on a standardized billing summary template, ADMINISTERING AGENCY letterhead that includes the address of ADMINISTERING AGENCY and shall be formatted in accordance with Chapter 5 of the LAPM to claim reimbursement by ADMINISTERING AGENCY. For construction invoices, pay estimates must be includedLOCAL ASSISTANCE PROCEDURES.
56. ADMINISTERING AGENCY Invoices must retain have at least one copy of supporting backup documentation for allowable costs incurred and claimed for reimbursement by ADMINISTERING AGENCY. ADMINISTERING AGENCY agrees to submit supporting backup documentation with invoices if requested by State. Acceptable backup documentation includes, but is not limited to, agency's ’s progress payment to the contractors, copies of cancelled checks showing amounts made payable to vendors and contractors, and/or a computerized summary of PROJECT costs.
67. Payments to ADMINISTERING AGENCY can only be released by STATE as reimbursements reimbursement of actual allowable PROJECT costs already incurred and paid for by the ADMINISTERING AGENCY.
78. Indirect Cost Allocation Plans/An Indirect Cost Rate Proposals (ICAP/ICRP), Proposal and Central Service Cost Allocation Plans Plan and related documentation are to be prepared and provided to the Inspector General – Independent Office of STATE (Caltrans Audits and Investigations & Investigations) annually for review and approval prior to ADMINISTERING AGENCY seeking reimbursement of indirect cost incurred within each fiscal year being claimed for federal reimbursement. ICAPs/ICRPs must be prepared in accordance with the requirements set forth in 2 CFR, Part 200, Chapter 5 of the LAPM, and the ICAP/ICRP approval procedures established by STATE.
89. Once PROJECT has been awarded, STATE reserves the right to de-obligate any excess Federal Funds from the construction phase of PROJECT if the contract award amount is less than the obligated amount, as shown on the PROJECT E-76 or E-76 (XXXX).
10. STATE will withhold the greater of either two (2) percent of the total of all STATE FUNDS Federal Funds encumbered for each PROGRAM SUPPLEMENT or $40,000 until ADMINISTERING AGENCY submits the Final Report of Expenditures for each completed PROGRAM SUPPLEMENT PROJECT.
911. The estimated total cost of PROJECT, the amount of STATE FUNDS Federal Funds obligated, and the required matching funds may be adjusted by mutual consent of the PARTIES hereto with a finance letter, a detailed estimate, if required, and an allocation notification letter when applicableapproved E-76 (XXXX). STATE FUNDING Federal-aid funding may be increased to cover PROJECT cost increases only if such additional funds are available and the CTC and/or STATE FHWA concurs with that increase in the form of an allocation and finance letterincrease.
1012. When such additional STATE FUNDS federal-aid funds are not available, ADMINISTERING AGENCY agrees that the payment of Federal Funds will be limited to the amounts authorized on the PROJECT specific E-76 / E-76 (XXXX) and agrees that any increases in PROJECT costs must be defrayed with ADMINISTERING AGENCY's ’s own funds.
1113. ADMINISTERING AGENCY shall use its own non-STATE FUNDS Federal Funds to finance the local share of eligible costs and all PROJECT expenditures or contract items ruled ineligible for financing with STATE FUNDSFederal Funds. STATE shall make the final determination of ADMINISTERING AGENCY's ’s cost eligibility for STATE FUNDED federal fund financing with respect to claimed of PROJECT costs.
1214. ADMINISTERING AGENCY will reimburse STATE for STATE's ’s share of costs for work performed by STATE at the request of ADMINISTERING AGENCY. STATE's ’s costs shall include overhead assessments in accordance with section 8755.1 of the State Administrative Manual.
1315. STATE FUNDS Federal and state funds allocated by from the CTC and/or STATE State Transportation Improvement Program (STIP) are subject to the timely use of funds provisions enacted by Senate Xxxx 45, approved in CTC 1997, and subsequent STIP Guidelines and State procedures approved by the CTC and STATE.
1416. STATE FUNDS Federal Funds encumbered for PROJECT are available for liquidation for a period of seven (7) years from the beginning of the State fiscal year the funds were appropriated in the State Budget. State funds encumbered for PROJECT are available for liquidation only for a limited period five (5) years from the beginning of the State fiscal year when those the funds were appropriated in the State Budget. STATE FUNDS Federal or state funds not liquidated within these periods will be reverted unless a an Cooperative Work Agreement (CWA) is submitted by ADMINISTERING AGENCY and approved by the California Department of Finance in accordance with Section 16304 of the (per Government CodeCode section 16304). The exact date of fund reversion will be reflected in the STATE signed PROJECT finance letterletter for PROJECT.
1517. Payments to ADMINISTERING AGENCY for PROJECT-related travel and subsistence (per diem) expenses of ADMINISTERING AGENCY forces and its contractors and subcontractors claimed for reimbursement or as local match credit shall not exceed rates authorized to be paid to rank and file STATE employees under current California State Department of Human Resources Personnel Administration (CalHRDPA) rules unless a Cooperative Work Agreement (CWA) is submitted by ADMINISTERING AGENCY and approved by the California Department of Finance in accordance with Government Code section 16304rules. If the rates invoiced by ADMINISTERING AGENCY are in excess of CalHR DPA rates, ADMINISTERING AGENCY is responsible for the cost difference, and any overpayments inadvertently paid by STATE shall be reimbursed to STATE by ADMINISTERING AGENCY on demanddemand within thirty (30) days of such invoice.
1618. ADMINISTERING AGENCY agrees to comply with California Government Code 4525- 4529Office of Management and Budget (OMB) Circular A-87, Cost Principles for State and Local Governments, and 49 CFR, Part 18, Uniform Administrative Requirements for Grants and Cooperative Agreements to State and Local Governments.
19. ADMINISTERING AGENCY agrees, and will assure that its contractors and subcontractors will be obligated to agree that (a) Contract Cost Principles and Procedures, 48 CFR, Federal Acquisition Regulations System, Chapter 1, Part 31, et seq., shall be used to determine the allowability of individual PROJECT cost items and (b) those parties shall comply with federal administrative procedures in accordance with 49 CFR, Part 18, Uniform Administrative Requirements for Grants and Cooperative Agreements to State and Local Governments. Every sub-recipient receiving PROJECT funds as a contractor or sub-contractor under this AGREEMENT shall comply with Federal administrative procedures in accordance with 49 CFR, Part 18, Uniform Administrative Requirements for Grants and Cooperative Agreements to State and Local Governments.
20. Any PROJECT costs for which ADMINISTERING AGENCY has received payment or credit that are determined by subsequent audit to be unallowable under OMB Circular X-00, 00 XXX, Chapter 1, Part 31 or 49 CFR, Part 18, are subject to repayment by ADMINISTERING AGENCY to STATE. Should ADMINISTERING AGENCY fail to reimburse moneys due STATE within thirty 30 days of demand, or within such other period as may be agreed in writing between the PARTIES hereto, STATE is authorized to intercept and withhold future payments due ADMINISTERING AGENCY from STATE or any third-party source, including but not limited to, the State Treasurer, the State Controller and the CTC.
21. Upon written demand by STATE, any overpayment to ADMINISTERING AGENCY of amounts invoiced to STATE shall be returned to STATE.
22. Should ADMINISTERING AGENCY fail to refund any moneys due STATE as provided hereunder or should ADMINISTERING AGENCY breach this AGREEMENT by failing to complete PROJECT without adequate justification and approval by STATE, then, within thirty 30 days of demand, or within such other period as may be agreed to in writing between the PARTIES, STATE, acting through the State Controller, the State Treasurer, or any other public entity or agency, may withhold or demand a transfer of an amount equal to the amount paid by or owed to STATE from future apportionments, or any other funds due ADMINISTERING AGENCY from the Highway Users Tax Fund or any other sources of funds, and/or may withhold approval of future ADMINISTERING AGENCY federal-aid projects.
23. Should ADMINISTERING AGENCY be declared to be in breach of this AGREEMENT or otherwise in default thereof by STATE, and if ADMINISTERING AGENCY is constituted as a joint powers authority, special district, or any other public entity not directly receiving funds through the State Controller, STATE is authorized to obtain reimbursement from whatever sources of funding are available, including the withholding or transfer of funds, pursuant to Article IV – 22, from those constituent entities comprising a joint powers authority or by bringing of an action against ADMINISTERING AGENCY or its constituent member entities, to recover all funds provided by STATE hereunder.
24. ADMINISTERING AGENCY acknowledges that the signatory party represents the ADMINISTERING AGENCY and further warrants that there is nothing within a Joint Powers Agreement, by which ADMINISTERING AGENCY was created, if any exists, that would restrict or otherwise limit STATE’s ability to recover State funds improperly spent by ADMINISTERING AGENCY in contravention of the terms of this AGREEMENT. article v audits, THIRD PARTY CONTRACTING, RECORDS retention and reports
1. STATE reserves the right to conduct technical and financial audits of PROJECT work and records when determined to be necessary or appropriate and ADMINISTERING AGENCY agrees, and shall require its contractors and subcontractors to agree, to cooperate with STATE by making all appropriate and relevant PROJECT records available for audit and copying as required by paragraph three (3) of ARTICLE V.
Appears in 1 contract
Samples: Master Agreement
FISCAL PROVISIONS. 1. All contractual obligations of STATE are subject to the appropriation of resources by the Legislature and the allocation of resources by the California Transportation Commission (CTC).
2. STATE'S ’S financial commitment of STATE FUNDS Federal Funds will occur only upon the execution of this AGREEMENT, the authorization of the project-specific E-76 or E-76 (XXXX), the execution of each project-specific PROGRAM SUPPLEMENT and/or SUPPLEMENT, and STATE's ’s approved finance letter.
3. ADMINISTERING AGENCY may submit signed duplicate invoices in arrears for reimbursement of participating PROJECT costs on a monthly or quarterly progress basis once the project-specific PROGRAM SUPPLEMENT has been executed by STATE.
4. ADMINISTERING AGENCY agrees, as a minimum, to submit invoices in arrears for reimbursement of allowable PROJECT costs at least once every six (6) months commencing after the STATE FUNDS funds are encumbered on either the project-specific PROGRAM SUPPLEMENT or through a project-specific finance letter approved by STATE. STATE reserves the right to suspend future allocations authorizations/obligations, and invoice payments for any on-going or future STATE FUNDED federal-aid project performed by ADMINISTERING AGENCY if PROJECT costs have not been invoiced by ADMINISTERING AGENCY for a six-six (6) month period 4period
5. Invoices shall be submitted on a standardized billing summary template, ADMINISTERING AGENCY letterhead that includes the address of ADMINISTERING AGENCY and shall be formatted in accordance with Chapter 5 of the LAPM to claim reimbursement by ADMINISTERING AGENCY. For construction invoices, pay estimates must be includedLOCAL ASSISTANCE PROCEDURES.
56. ADMINISTERING AGENCY Invoices must retain have at least one copy of supporting backup documentation for allowable costs incurred and claimed for reimbursement by ADMINISTERING AGENCY. ADMINISTERING AGENCY agrees to submit supporting backup documentation with invoices if requested by State. Acceptable backup documentation includes, but is not limited to, agency's ’s progress payment to the contractors, copies of cancelled checks showing amounts made payable to vendors and contractors, and/or a computerized summary of PROJECT costs.
67. Payments to ADMINISTERING AGENCY can only be released by STATE as reimbursements reimbursement of actual allowable PROJECT costs already incurred and paid for by the ADMINISTERING AGENCY.
78. Indirect Cost Allocation Plans/An Indirect Cost Rate Proposals (ICAP/ICRP), Proposal and Central Service Cost Allocation Plans Plan and related documentation are to be prepared and provided to the Inspector General – Independent Office of STATE (Caltrans Audits and Investigations & Investigations) annually for review and approval prior to ADMINISTERING AGENCY seeking reimbursement of indirect cost incurred within each fiscal year being claimed for federal reimbursement. ICAPs/ICRPs must be prepared in accordance with the requirements set forth in 2 CFR, Part 200, Chapter 5 of the LAPM, and the ICAP/ICRP approval procedures established by STATE.
89. Once PROJECT has been awarded, STATE reserves the right to de-obligate any excess Federal Funds from the construction phase of PROJECT if the contract award amount is less than the obligated amount, as shown on the PROJECT E-76 or E-76 (XXXX).
10. STATE will withhold the greater of either two (2) percent of the total of all STATE FUNDS Federal Funds encumbered for each PROGRAM SUPPLEMENT or $40,000 until ADMINISTERING AGENCY submits the Final Report of Expenditures for each completed PROGRAM SUPPLEMENT PROJECT.
911. The estimated total cost of PROJECT, the amount of STATE FUNDS Federal Funds obligated, and the required matching funds may be adjusted by mutual consent of the PARTIES hereto with a finance letter, a detailed estimate, if required, and an allocation notification letter when applicableapproved E-76 (XXXX). STATE FUNDING Federal-aid funding may be increased to cover PROJECT cost increases only if such additional funds are available and the CTC and/or STATE FHWA concurs with that increase in the form of an allocation and finance letterincrease.
1012. When such additional STATE FUNDS federal-aid funds are not available, ADMINISTERING AGENCY agrees that the payment of Federal Funds will be limited to the amounts authorized on the PROJECT specific E-76 / E-76 (XXXX) and agrees that any increases in PROJECT costs must be defrayed with ADMINISTERING AGENCY's ’s own funds.
1113. ADMINISTERING AGENCY shall use its own non-STATE FUNDS Federal Funds to finance the local share of eligible costs and all PROJECT expenditures or contract items ruled ineligible for financing with STATE FUNDSFederal Funds. STATE shall make the final determination of ADMINISTERING AGENCY's ’s cost eligibility for STATE FUNDED federal fund financing with respect to claimed of PROJECT costs.
1214. ADMINISTERING AGENCY will reimburse STATE for STATE's ’s share of costs for work performed by STATE at the request of ADMINISTERING AGENCY. STATE's ’s costs shall include overhead assessments in accordance with section 8755.1 of the State Administrative Manual.
1315. STATE FUNDS Federal and state funds allocated by from the CTC and/or STATE State Transportation Improvement Program (STIP) are subject to the timely use of funds provisions enacted by Senate Xxxx 45, approved in CTC 1997, and subsequent STIP Guidelines and State procedures approved by the CTC and STATE.
1416. STATE FUNDS Federal Funds encumbered for PROJECT are available for liquidation for a period of seven (7) years from the beginning of the State fiscal year the funds were appropriated in the State Budget. State funds encumbered for PROJECT are available for liquidation only for a limited period five (5) years from the beginning of the State fiscal year when those the funds were appropriated in the State Budget. STATE FUNDS Federal or state funds not liquidated within these periods will be reverted unless a an Cooperative Work Agreement (CWA) is submitted by ADMINISTERING AGENCY and approved by the California Department of Finance in accordance with Section 16304 of the (per Government CodeCode section 16304). The exact date of fund reversion will be reflected in the STATE signed PROJECT finance letterletter for PROJECT.
1517. Payments to ADMINISTERING AGENCY for PROJECT-related travel and subsistence (per diem) expenses of ADMINISTERING AGENCY forces and its contractors and subcontractors claimed for reimbursement or as local match credit shall not exceed rates authorized to be paid to rank and file STATE employees under current California State Department of Human Resources Personnel Administration (CalHRDPA) rules unless a Cooperative Work Agreement (CWA) is submitted by ADMINISTERING AGENCY and approved by the California Department of Finance in accordance with Government Code section 16304rules. If the rates invoiced by ADMINISTERING AGENCY are in excess of CalHR DPA rates, ADMINISTERING AGENCY is responsible for the cost difference, and any overpayments inadvertently paid by STATE shall be reimbursed to STATE by ADMINISTERING AGENCY on demanddemand within thirty (30) days of such invoice.
1618. ADMINISTERING AGENCY agrees to comply with California Government Code 4525- 4529Office of Management and Budget (OMB) Circular A-87, Cost Principles for State and Local Governments, and 49 CFR, Part 18, Uniform Administrative Requirements for Grants and Cooperative Agreements to State and Local Governments.
19. ADMINISTERING AGENCY agrees, and will assure that its contractors and subcontractors will be obligated to agree that (a) Contract Cost Principles and Procedures, 48 CFR, Federal Acquisition Regulations System, Chapter 1, Part 31, et seq., shall be used to determine the allowability of individual PROJECT cost items and (b) those parties shall comply with federal administrative procedures in accordance with 49 CFR, Part 18, Uniform Administrative Requirements for Grants and Cooperative Agreements to State and Local Governments. Every sub-recipient receiving PROJECT funds as a contractor or sub-contractor under this AGREEMENT shall comply with Federal administrative procedures in accordance with 49 CFR, Part 18, Uniform Administrative Requirements for Grants and Cooperative Agreements to State and Local Governments.
20. Any PROJECT costs for which ADMINISTERING AGENCY has received payment or credit that are determined by subsequent audit to be unallowable under OMB Circular X-00, 00 XXX, Chapter 1, Part 31 or 49 CFR, Part 18, are subject to repayment by ADMINISTERING AGENCY to STATE. Should ADMINISTERING AGENCY fail to reimburse moneys due STATE within thirty 30 days of demand, or within such other period as may be agreed in writing between the PARTIES hereto, STATE is authorized to intercept and withhold future payments due ADMINISTERING AGENCY from STATE or any third-party source, including but not limited to, the State Treasurer, the State Controller and the CTC.
21. Upon written demand by STATE, any overpayment to ADMINISTERING AGENCY of amounts invoiced to STATE shall be returned to STATE.
22. Should ADMINISTERING AGENCY fail to refund any moneys due STATE as provided hereunder or should ADMINISTERING AGENCY breach this AGREEMENT by failing to complete PROJECT without adequate justification and approval by STATE, then, within thirty 30 days of demand, or within such other period as may be agreed to in writing between the PARTIES, STATE, acting through the State Controller, the State Treasurer, or any other public entity or agency, may withhold or demand a transfer of an amount equal to the amount paid by or owed to STATE from future apportionments, or any other funds due ADMINISTERING AGENCY from the Highway Users Tax Fund or any other sources of funds, and/or may withhold approval of future ADMINISTERING AGENCY federal-aid projects.
23. Should ADMINISTERING AGENCY be declared to be in breach of this AGREEMENT or otherwise in default thereof by STATE, and if ADMINISTERING AGENCY is constituted as a joint powers authority, special district, or any other public entity not directly receiving funds through the State Controller, STATE is authorized to obtain reimbursement from whatever sources of funding are available, including the withholding or transfer of funds, pursuant to Article IV – 22, from those constituent entities comprising a joint powers authority or by bringing of an action against ADMINISTERING AGENCY or its constituent member entities, to recover all funds provided by STATE hereunder.
24. ADMINISTERING AGENCY acknowledges that the signatory party represents the ADMINISTERING AGENCY and further warrants that there is nothing within a Joint Powers Agreement, by which ADMINISTERING AGENCY was created, if any exists, that would restrict or otherwise limit STATE’s ability to recover State funds improperly spent by ADMINISTERING AGENCY in contravention of the terms of this AGREEMENT.
Appears in 1 contract
Samples: Master Agreement
FISCAL PROVISIONS. 1. All contractual obligations of STATE are subject to the appropriation of resources by the Legislature and the allocation of resources by the California Transportation Commission (CTC).
2. STATE''S financial commitment of STATE FUNDS federal funds will occur only upon the execution of this AGREEMENT, the authorization of the project-specific E-76 or E-76 (XXXX), the execution of each project-specific PROGRAM SUPPLEMENT and/or SUPPLEMENT, and STATE''s approved finance letter.
3. ADMINISTERING AGENCY may submit signed invoices in arrears for reimbursement of participating PROJECT costs on a regular basis once the project-specific PROGRAM SUPPLEMENT has been executed by STATE.
4. ADMINISTERING AGENCY agrees, as at a minimum, to submit invoices in arrears for reimbursement of allowable PROJECT costs at least once every six (6) months commencing after the STATE FUNDS funds are encumbered on either the project-specific PROGRAM SUPPLEMENT or through a project-specific finance letter approved by STATE. STATE reserves the right to suspend future allocations authorizations/obligations, and invoice payments for any on-going or future STATE FUNDED federal-aid project performed by ADMINISTERING AGENCY if PROJECT costs have not been invoiced by ADMINISTERING AGENCY for a six-six (6) month period 4period.
5. Invoices shall be submitted on a standardized billing summary template, ADMINISTERING AGENCY letterhead that includes the address of ADMINISTERING AGENCY and shall be formatted in accordance with Chapter 5 of the LAPM to claim reimbursement by ADMINISTERING AGENCY. For construction invoices, pay estimates must be includedLOCAL ASSISTANCE PROCEDURES.
56. ADMINISTERING AGENCY must retain have at least one copy of supporting backup documentation for allowable costs incurred and claimed for reimbursement by ADMINISTERING AGENCY. ADMINISTERING AGENCY agrees to submit supporting backup documentation with invoices if requested by State. Acceptable backup documentation includes, but is not limited to, agency''s progress payment to the contractors, copies of cancelled checks showing amounts made payable to vendors and contractors, and/or a computerized summary of PROJECT costs.
67. Payments to ADMINISTERING AGENCY can only be released by STATE as reimbursements reimbursement of actual allowable PROJECT costs already incurred and paid for by the ADMINISTERING AGENCY.
78. Indirect Cost Allocation Plans/Indirect Cost Rate Proposals (ICAP/ICRP), Central Service Cost Allocation Plans and related documentation are to be prepared and provided to the Inspector General – Independent Office of STATE (Caltrans Audits and Investigations ''&'' Investigations) for review and approval prior to ADMINISTERING AGENCY seeking reimbursement of indirect cost costs incurred within each fiscal year being claimed for State and federal reimbursement. ICAPs/ICRPs must be prepared in accordance with the requirements set forth in 2 CFR, Part 200, Chapter 5 of the LAPMLocal Assistance Procedural Manual, and the ICAP/ICRP approval procedures established by STATE.
89. Once PROJECT has been awarded, STATE reserves the right to de-obligate any excess federal funds from the construction phase of PROJECT if the contract award amount is less than the obligated amount, as shown on the PROJECT E-76 or E-76 (XXXX).
10. STATE will withhold the greater of either two (2) percent of the total of all STATE FUNDS federal funds encumbered for each PROGRAM SUPPLEMENT or $40,000 until ADMINISTERING AGENCY submits the Final Report of Expenditures for each completed PROGRAM SUPPLEMENT PROJECT.
911. The estimated total cost of PROJECT, the amount of STATE FUNDS federal funds obligated, and the required matching funds may be adjusted by mutual consent of the PARTIES hereto with a finance letter, a detailed estimate, if required, and an allocation notification letter when applicableapproved E-76 (XXXX). STATE FUNDING Federal-aid funding may be increased to cover PROJECT cost increases only if such additional funds are available and the CTC and/or STATE FHWA concurs with that increase in the form of an allocation and finance letterincrease.
1012. When such additional STATE FUNDS federal-aid funds are not available, ADMINISTERING AGENCY agrees that the payment of federal funds will be limited to the amounts authorized on the PROJECT specific E-76 / E-76 (XXXX) and agrees that any increases in PROJECT costs must be defrayed with ADMINISTERING AGENCY''s own funds.
1113. ADMINISTERING AGENCY shall use its own non-STATE FUNDS federal funds to finance the local share of eligible costs and all PROJECT expenditures or contract items ruled ineligible for financing with STATE FUNDSfederal funds. STATE shall make the final determination of ADMINISTERING AGENCY''s cost eligibility for STATE FUNDED federal fund financing with respect to claimed of PROJECT costs.
1214. ADMINISTERING AGENCY will reimburse STATE for STATE''s share of costs for work performed by STATE at the request of ADMINISTERING AGENCY. STATE''s costs shall include overhead assessments in accordance with section 8755.1 of the State Administrative Manual.
1315. STATE FUNDS Federal and state funds allocated by from the CTC and/or STATE State Transportation Improvement Program (STIP) are subject to the timely use of funds provisions enacted by Senate Bill 45, approved in CTC 1997, and subsequent STIP Guidelines and State procedures approved by the CTC and STATE.
1416. STATE FUNDS Federal funds encumbered for PROJECT are available for liquidation for a period of six (6) years from the beginning of the State fiscal year the funds were appropriated in the State Budget. State funds encumbered for PROJECT are available for liquidation only for a limited period six (6) years from the beginning of the State fiscal year when those the funds were appropriated in the State Budget. STATE FUNDS Federal or state funds not liquidated within these periods will be reverted unless a Cooperative Work Agreement (CWA) is submitted by ADMINISTERING AGENCY and approved by the California Department of Finance in accordance with Section 16304 of the (per Government CodeCode section 16304). The exact date of fund reversion will be reflected in the STATE signed PROJECT finance letterletter for PROJECT.
1517. Payments to ADMINISTERING AGENCY for PROJECT-related travel and subsistence (per diem) expenses of ADMINISTERING AGENCY forces and its contractors and subcontractors claimed for reimbursement or as local match credit shall not exceed rates authorized to be paid to rank and file STATE employees under current California State Department of Human Resources Personnel Administration (CalHRDPA) rules unless a Cooperative Work Agreement (CWA) is submitted by ADMINISTERING AGENCY and approved by the California Department of Finance in accordance with Government Code section 16304rules. If the rates invoiced by ADMINISTERING AGENCY are in excess of CalHR DPA rates, ADMINISTERING AGENCY is responsible for the cost difference, and any overpayments inadvertently paid by STATE shall be reimbursed to STATE by ADMINISTERING AGENCY on demanddemand within thirty (30) days of such invoice.
1618. ADMINISTERING AGENCY agrees to comply with California Government 2 CFR, Part 200, Uniform Administrative Requirements, Cost Principles and Audit Requirement for Federal Awards.
19. ADMINISTERING AGENCY agrees, and will ensure that its contractors and subcontractors will be obligated to agree, that Contract Cost Principles and Procedures, 48 CFR, Federal Acquisition Regulations System, Chapter 1, Part 31, et seq., shall be used to determine the allowability of individual PROJECT cost items.
20. Every sub-recipient receiving PROJECT funds under this AGREEMENT shall comply with 2 CFR, Part 200, 23 CFR, 48 CFR Chapter 1, Part 31, Local Assistance Procedures, Public Contract Code 4525- 4529(PCC) 10300-10334 (procurement of goods), PCC 10335-10381 (non-A''&''E services), and other applicable STATE and FEDERAL regulations.
21. Any PROJECT costs for which ADMINISTERING AGENCY has received payment or credit that are determined by subsequent audit to be unallowable under 2 CFR, Part 200, 23 CFR, 48 CFR, Chapter 1, Part 31, and other applicable STATE and FEDERAL regulations, are subject to repayment by ADMINISTERING AGENCY to STATE.
22. Should ADMINISTERING AGENCY fail to refund any moneys due upon written demand by STATE as provided hereunder or should ADMINISTERING AGENCY breach this AGREEMENT by failing to complete PROJECT without adequate justification and approval by STATE, then, within thirty 30 days of demand, or within such other period as may be agreed to in writing between the PARTIES, STATE, acting through the State Controller, the State Treasurer, or any other public entity or agency, may withhold or demand a transfer of an amount equal to the amount paid by or owed to STATE from future apportionments, or any other funds due ADMINISTERING AGENCY from the Highway Users Tax Fund or any other sources of funds, and/or may withhold approval of future ADMINISTERING AGENCY federal-aid projects.
23. Should ADMINISTERING AGENCY be declared to be in breach of this AGREEMENT or otherwise in default thereof by STATE, and if ADMINISTERING AGENCY is constituted as a joint powers authority, special district, or any other public entity not directly receiving funds through the State Controller, STATE is authorized to obtain reimbursement from whatever sources of funding are available, including the withholding or transfer of funds, pursuant to Article IV - 22, from those constituent entities comprising a joint powers authority or by bringing of an action against ADMINISTERING AGENCY or its constituent member entities, to recover all funds provided by STATE hereunder.
24. ADMINISTERING AGENCY acknowledges that the signatory party represents the ADMINISTERING AGENCY and further warrants that there is nothing within a Joint Powers Agreement, by which ADMINISTERING AGENCY was created, if any exists, that would restrict or otherwise limit STATE''s ability to recover State funds improperly spent by ADMINISTERING AGENCY in contravention of the terms of this AGREEMENT.
Appears in 1 contract
Samples: Master Agreement