FIXED GENERAL CONDITIONS COST Sample Clauses

FIXED GENERAL CONDITIONS COST. 8.1 The items included in the "Fixed General Conditions" shall include all of the Construction Manager's costs and expenses, however described or designated, that are not either: (i) authorized for reimbursement in Sections 7.0 through 7.3 of this Agreement; or (ii) excluded from reimbursement in Section 7.4 of this Agreement. Fixed General Conditions costs include the following:
AutoNDA by SimpleDocs

Related to FIXED GENERAL CONDITIONS COST

  • General Conditions Costs Contractor is entitled to receive payment for the actual cost of the allowable General Conditions items incurred after receipt of a Notice to Proceed with Construction from Owner through Substantial Completion of the Project, plus 30 calendar days. Contractor is not entitled to reimbursement for General Conditions Costs incurred before receipt of the Notice to Proceed. General Conditions Costs incurred after Substantial Completion, plus 30 calendar days, must be approved in advance by Owner. Allowable General Conditions items are identified below and in Exhibit “D” attached to this Agreement. These items shall be included in the General Conditions Cost amount shown as a line item in the Guaranteed Maximum Price Proposal and as detailed on the Schedule of Values. Items not specifically included below or in Exhibit “D” will not be allowed as General Condition Costs.

  • General Conditions (i) Each party will make each payment or delivery specified in each Confirmation to be made by it, subject to the other provisions of this Agreement. (ii) Payments under this Agreement will be made on the due date for value on that date in the place of the account specified in the relevant Confirmation or otherwise pursuant to this Agreement, in freely transferable funds and in the manner customary for payments in the required currency. Where settlement is by delivery (that is, other than by payment), such delivery will be made for receipt on the due date in the manner customary for the relevant obligation unless otherwise specified in the relevant Confirmation or elsewhere in this Agreement. (iii) Each obligation of each party under Section 2(a)(i) is subject to (1) the condition precedent that no Event of Default or Potential Event of Default with respect to the other party has occurred and is continuing, (2) the condition precedent that no Early Termination Date in respect of the relevant Transaction has occurred or been effectively designated and (3) each other applicable condition precedent specified in this Agreement.

  • General Condition The Aircraft will: (a) be clean by international airline standards; (b) have installed the full complement of engines and other material equipment, parts and accessories and loose equipment required under the Agreed Maintenance Program and installed in the other Boeing/XxXxxxxxx Xxxxxxx MD-87 aircraft operated by Lessee (together with any additions and improvements thereto, or replacements thereof, effected pursuant to and in accordance with this Agreement) and be in a condition suitable for immediate operation in commercial service; (c) be airworthy, conform to type design and be in a condition for safe operation with all equipment, components and systems operating in accordance with their intended use and within limits established by the manufacturer and approved by the Aviation Authority, and all pilot discrepancies and deferred maintenance items cleared on a terminating action basis; (d) have a U.S. Standard Transport Category Certificate of Airworthiness issued by the FAA in accordance with FAR Part 129 (or if required by the Lessor, be eligible for a valid export certificate of airworthiness with respect to the Aircraft issued by the Aviation Authority) and unconditionally meet all FAA requirements for immediate operations under FAR Part 129; (e) comply with the manufacturer's original specification to the extent that it so complied on the date of this Agreement and subject to any alterations made pursuant to and in accordance with this Agreement after such date; (f) have undergone, immediately prior to redelivery, the MSG-3 equivalent of a "C" Check in accordance with the Agreed Maintenance Program so that all Airframe inspections falling due within the next 3,000 hours, 3,000 cycles or twelve months (whichever is applicable and most limiting) of operation in accordance with the Agreed Maintenance Program have been accomplished; (g) if the Flight Hours of the Airframe remaining until the scheduled completion of the Major Checks (collectively, a "Complete Heavy Work Package") on the Expiry Date are: (i) less than on the Delivery Date, then the Lessee shall pay to the Lessor an amount equal to the product of (a) the number of Flight Hours remaining until the scheduled completion of a Complete Heavy Work Package as of the Expiry Date that are less than the number of Flight Hours that were remaining until the scheduled completion of a Complete Heavy Work Package as of the Delivery Date (b) multiplied by US$50.00, provided, however, that no payment shall be due from -------- ------- Lessee under this clause (g)(i) if, immediately preceding the redelivery of the Aircraft, the Lessee has performed a Complete Heavy Work Package; (ii) more than on the Delivery Date, then the Lessor shall pay to the Lessee an amount equal to the product of (a) the number of Flight Hours remaining until the scheduled completion of a Complete Heavy Work Package as of the Expiry Date that are more than the number of Flight Hours that were remaining until the scheduled completion of a Complete Heavy Work Package as of the Delivery Date (b) multiplied by US$50.00; For the avoidance of doubt, any amounts due to the Lessor pursuant to this clause (g) may be set off against any amounts due to Lessee pursuant to paragraphs (b) or (d) of Schedule 10 and a payment made for the net amount due; (h) have complied with all airworthiness directives and mandatory orders affecting that model of Aircraft issued by the Aviation Authority (and, if different, the FAA) that are required terminating action during the Term; (i) no special or unique manufacturer inspection or check requirements specific to the Aircraft will exist unless there is no terminating action available from any source; (j) have installed all applicable vendor's and manufacturer's service bulletin kits received free of charge by the Lessee that are appropriate for the Aircraft and, to the extent not installed, those kits which have been received with respect to this Aircraft will be furnished free of charge to the Lessor; (k) be free of any system-related leaks which are outside maintenance manual limitations; (l) all fluid reservoirs (including fuel, oil, oxygen, hydraulic and water) will be full, and the waste tank serviced in accordance with the manufacturer's instructions; (m) if required under the Approved Maintenance Program, all fuel tanks will have recently undergone an anti-fungus/biological growth contamination laboratory evaluation, and any excessive levels of contamination corrected; (n) have an FAA-approved aging aircraft program in operation and up-to-date; and (o) have all signs and decals clean, secure and legible.

  • Early Construction of Base Case Facilities Developer may request Connecting Transmission Owner to construct, and Connecting Transmission Owner shall construct, subject to a binding cost allocation agreement reached in accordance with Attachment S to the ISO OATT, including Section 25.8.7 thereof, using Reasonable Efforts to accommodate Developer’s In-Service Date, all or any portion of any System Upgrade Facilities or System Deliverability Upgrades required for Developer to be interconnected to the New York State Transmission System which are included in the Base Case of the Class Year Study for the Developer, and which also are required to be constructed for another Developer, but where such construction is not scheduled to be completed in time to achieve Developer’s In-Service Date.

  • Geographic Area and Sector Specific Allowances, Conditions and Exceptions The following allowances and conditions shall apply where relevant. Where the Employer does work which falls under the following headings, the Employer agrees to pay and observe the relevant respective conditions and/or exceptions set out below in each case.

  • General Conditions; Definitions 1.01. The General Conditions (as defined in the Appendix to this Agreement) constitute an integral part of this Agreement. 1.02. Unless the context requires otherwise, the capitalized terms used in this Agreement have the meanings ascribed to them in the General Conditions or in the Appendix to this Agreement.

  • General Conditions Applicable to Option to Build If the Interconnection Customer assumes responsibility for the design, procurement and construction of the Participating TO's Interconnection Facilities and Stand Alone Network Upgrades, (1) the Interconnection Customer shall engineer, procure equipment, and construct the Participating TO's Interconnection Facilities and Stand Alone Network Upgrades (or portions thereof) using Good Utility Practice and using standards and specifications provided in advance by the Participating TO; (2) The Interconnection Customer’s engineering, procurement and construction of the Participating TO's Interconnection Facilities and Stand Alone Network Upgrades shall comply with all requirements of law to which the Participating TO would be subject in the engineering, procurement or construction of the Participating TO's Interconnection Facilities and Stand Alone Network Upgrades; (3) the Participating TO shall review, and the Interconnection Customer shall obtain the Participating TO’s approval of, the engineering design, equipment acceptance tests, and the construction of the Participating TO's Interconnection Facilities and Stand Alone Network Upgrades, which approval shall not be unreasonably withheld, and the CAISO may, at its option, review the engineering design, equipment acceptance tests, and the construction of the Participating TO's Interconnection Facilities and Stand Alone Network Upgrades; (4) prior to commencement of construction, the Interconnection Customer shall provide to the Participating TO, with a copy to the CAISO for informational purposes, a schedule for construction of the Participating TO's Interconnection Facilities and Stand Alone Network Upgrades, and shall promptly respond to requests for information from the Participating TO; (5) at any time during construction, the Participating TO shall have the right to gain unrestricted access to the Participating TO's Interconnection Facilities and Stand Alone Network Upgrades and to conduct inspections of the same; (6) at any time during construction, should any phase of the engineering, equipment procurement, or construction of the Participating TO's Interconnection Facilities and Stand Alone Network Upgrades not meet the standards and specifications provided by the Participating TO, the Interconnection Customer shall be obligated to remedy deficiencies in that portion of the Participating TO's Interconnection Facilities and Stand Alone Network Upgrades; (7) the Interconnection Customer shall indemnify the CAISO and Participating TO for claims arising from the Interconnection Customer's construction of the Participating TO's Interconnection Facilities and Stand Alone Network Upgrades under the terms and procedures applicable to Article 18.1

  • General Conditions Applicable to Insurance All policies of insurance required by this section shall comply with the following requirements:

  • Routine Maintenance, Construction, and Repair The NYISO or Connecting Transmission Owner may interrupt interconnection service or curtail the output of the Small Generating Facility and temporarily disconnect the Small Generating Facility from the New York State Transmission System or Distribution System when necessary for routine maintenance, construction, and repairs on the New York State Transmission System or Distribution System. The NYISO or the Connecting Transmission Owner shall provide the Interconnection Customer with five Business Days notice prior to such interruption. The NYISO and Connecting Transmission Owner shall use Reasonable Efforts to coordinate such reduction or temporary disconnection with the Interconnection Customer.

  • Suspension of unsafe Construction Works (i) Upon recommendation of the Authority’s Engineer to this effect, the Authority may by notice require the Contractor to suspend forthwith the whole or any part of the Works if, in the reasonable opinion of the Authority’s Engineer, such work threatens the safety of the Users and pedestrians. (ii) The Contractor shall, pursuant to the notice under Clause 11.17 (i), suspend the Works or any part thereof for such time and in such manner as may be specified by the Authority and thereupon carry out remedial measures to secure the safety of suspended works, the Users and pedestrians. The Contractor may by notice require the Authority’s Engineer to inspect such remedial measures forthwith and make a report to the Authority recommending whether or not the suspension hereunder may be revoked. Upon receiving the recommendations of the Authority’s Engineer, the Authority shall either revoke such suspension or instruct the Contractor to carry out such other and further remedial measures as may be necessary in the reasonable opinion of the Authority, and the procedure set forth in this Clause 11.17 shall be repeated until the suspension hereunder is revoked. (iii) Subject to the provisions of Clause 21.6, all reasonable costs incurred for maintaining and protecting the Works or part thereof during the period of suspension (the “Preservation Costs”), shall be borne by the Contractor; provided that if the suspension has occurred as a result of any breach of this Agreement by the Authority, the Preservation Costs shall be borne by the Authority. (iv) If suspension of Works is for reasons not attributable to the Contractor, the Authority’s Engineer shall determine any Time Extension to which the Contractor is reasonably entitled.