Common use of Fonning of Xxxxx Clause in Contracts

Fonning of Xxxxx. Excavation shall be made to the required depth and the material upon which the kerb is to be set shall be compacted to a form and e~en surface. The xxxxx shall be set on edge to the required alignment and levels. The joints shall not exceed 6mm. and shall be pointed with cement mortar 1:3 to full depth and be flush with surtace of the kerb. the kerb shall be cleaned satisfactorily of all excess mortar and shall be back filled with acceptable material in layers of not more than (4") 102mm in depth and in front upto WBM surface on the road side with BG. metal. In the case of removing and refixing of xxxxx refixing shall be done after filling the excavated trenches in proper level and consolidation the same as per new xxxxx.

Appears in 7 contracts

Samples: www.tniuscbe.org, www.tniuscbe.org, tniuscbe.org

AutoNDA by SimpleDocs

Fonning of Xxxxx. Excavation shall be made to the required depth and the material upon which the kerb is to be set shall be compacted to a form and e~en even surface. The xxxxx shall be set on edge to the required alignment and levels. The joints shall not exceed 6mm. and shall be pointed with cement mortar 1:3 to full depth and be flush with surtace surface of the kerb. the kerb shall be cleaned satisfactorily of all excess mortar and shall be back filled with acceptable material in layers of not more than (4") 102mm in depth and in front upto WBM surface on the road side with BG. metal. In the case of removing and refixing of xxxxx refixing shall be done after filling the excavated trenches in proper level and consolidation the same as per new xxxxx.

Appears in 3 contracts

Samples: 2.imimg.com, imghost1.indiamart.com, www.tniuscbe.org

AutoNDA by SimpleDocs
Time is Money Join Law Insider Premium to draft better contracts faster.