Frequency controlled normal operation reserve Sample Clauses

Frequency controlled normal operation reserve. The frequency controlled normal operation reserve shall be at least 600 MW at
Frequency controlled normal operation reserve. The frequency controlled normal operation reserve is activated automatically within a ± 0.1 Hz deviation and shall be regulated out within 2-3 minutes. The joint requirement for the synchronous system is 600 MW. This means a joint requirement for frequency response in the synchronous system of 6,000 MW/Hz. This service can be exchanged to a certain degree. Each subsystem shall have at least 2/3 of the frequency controlled normal operation reserve within its own system in the event of splitting up and island operation. A major exchange of the service between the subsystems can require a greater need for regulating margin (the difference between the transmission and trading capacities). Elspot exchanges and joint Nordic balance regulation take priority over the exchange of automatic active reserve. Thus, the exchange of this service is agreed after the Elspot has closed. Energinet. dk East Droop control at thermal power plants. Yes Energinet. ▇▇ ▇▇▇▇ No requirement regarding frequency controlled normal operation reserve from the continent. Fingrid Measured droop control at hydropower and thermal power plants. DC link towards Russia. Yes Yes Statnett % turbine opening/Hz in hydropower. Yes Svenska Kraftnät % turbine opening/Hz in hydropower. Yes
Frequency controlled normal operation reserve. The reserve unit used in the maintenance of the frequency controlled normal operation reserve shall regulate almost linearly within a frequency range of 49.90 -
Frequency controlled normal operation reserve. 7.1.1 Capacity fee The capacity fee is 14.00 €/MW,h, which Fingrid shall pay if the reserve capacity verified by means of measurements is in accordance with the reserve plan delivered by Reserve Holder. If the reserve capacity verified by means of measurements is below the reserve plan, Fingrid shall pay Reserve Holder compensation on the basis of the verified capacity. Reserve Holder shall pay Fingrid 100 per cent of the above price, in other words 14.00 €/MW,h, in compensation for capacity not supplied.