General Design Requirements. 16.1 The Design-Builder is responsible for the means, methods, techniques, sequences and procedures necessary to properly complete the Design in conformance with this Agreement, including the Project Management Plan and the Time Schedule. 16.2 The Design-Builder: (a) will ensure that the Work and the Design are fully compliant with all requirements of this Agreement and all Laws; (b) will perform and complete the Design and the Work so as to provide the completed Project that is fit for the intended uses as described in the Statement of Requirements; and (c) acknowledges and agrees that it has the non-delegable duty and obligation to the Authority to complete the Work, including the Design, in a manner that is fully compliant with all requirements of this Agreement and all Laws. 16.3 The Design-Builder will: (a) cause all portions and aspects of the Drawings and Specifications to be prepared under the direction of, and to be sealed under the professional seal of, the Design-Builder’s Consultant; (b) cause the Design-Builder’s Consultant to confirm to the Authority, under his or her professional seal (if applicable), that in the opinion of the Design-Builder’s Consultant: (i) the Drawings and Specifications implement and otherwise conform to the Statement of Requirements; (ii) the Drawings and Specifications implement and otherwise conform to the Proposal Extracts; (iii) the Drawings and Specifications have been prepared in accordance with, and substantially comply with, all Standards; and (iv) the Design-Builder’s Consultant has carried out the general reviews of the progress of the Construction, to the extent necessary, in order to determine to the Design-Builder’s Consultant’s satisfaction that the Construction is performed in general conformity with the requirements of the Agreement, the Drawings and Specifications and applicable Laws; and (c) provide the Authority with all letters of professional assurance as required pursuant to applicable Laws. 16.4 The Design-Builder will not construct any part of the Work that is not based on the most recent Drawings and Specifications or that does not meet the Statement of Requirements and other requirements of this Agreement. To the extent that the Drawings and Specifications conflict with, modify or deviate from the Statement of Requirements and other requirements of this Agreement, the Design-Builder will revise the Drawings and Specifications and submit them to the Authority under the Review Procedure. 16.5 The Design-Builder will make, or cause the Design-Builder’s Consultant to make, any revisions to the Drawings or Specifications as are necessary from time to time due to Changes and, for clarity, the Design-Builder will comply with Section 16.3 with respect to any such revisions. 16.6 Nothing in this Section 16, or otherwise in or under this Agreement, makes the Authority, the Authority’s Representative, the Authority’s Consultant or any other person on behalf of the Authority responsible for the Design of the Project, including compliance of the Drawings and Specifications with the Statement of Requirements and all Standards, and the Design-Builder will, notwithstanding any review or acceptance under the Review Procedure or this Section 16 or other act of the Authority, remain solely liable and responsible for compliance of the Drawings and Specifications with the Statement of Requirements and all Standards. 16.7 Without limiting any of the obligations of the Design-Builder under this Agreement, the duties and responsibilities of the Design-Builder with respect to the Design include: (a) review of the documents, reports, drawings, Statement of Requirements and other information provided by the Authority and reporting promptly to the Authority any error, inconsistency or omission the Design-Builder may discover; (b) preparation of a Design that meets the Statement of Requirements, all Standards and all terms of this Agreement; (c) the coordination required to integrate all parts of the Design in the Work; (d) preparation of all reports, documents, information, schemes and presentation materials as required by this Agreement; (e) inspecting the progress of the Construction in order to determine that the Work is in compliance with the requirements of the Design, Specifications, all Standards and all terms of this Agreement; (f) liaising with the Authority and local authorities having jurisdiction as required during the Design and Construction and providing copies of all correspondence with such local authorities to the Authority; and (g) providing all required assurances to local authorities having jurisdiction respecting substantial conformance of the Design with all Standards and as may be required for the issuance of or compliance with any permits, licenses or approvals. 16.8 The Design-Builder will ensure that the Design-Builder’s Consultant and all other architects, engineers and other professionals performing professional services engaged in the Design fulfill their duties and responsibilities to the standard of diligence, skill and care that such persons would customarily provide in accordance with their professional and legal obligations in similar circumstances and in the same general geographic location as the Site. Any failure by any of the Design-Builder’s Consultants or such other architects, engineers or professionals performing professional services in relation to the Design will not relieve the Design-Builder of any responsibility for ensuring that the Work is carried out in conformance with this Agreement including the Statement of Requirements, the Design and all Standards. 16.9 If the Design-Builder’s Consultant’s engagement is terminated, the Design-Builder will engage a new Design-Builder’s Consultant to provide Design. The Design-Builder will notify the Authority in writing before appointing or re-appointing the Design-Builder’s Consultant, and the Design-Builder will not appoint any Design-Builder’s Consultant to whom the Authority may reasonably object.
Appears in 1 contract
Samples: Design Build Agreement
General Design Requirements. 16.1 The Design-Builder is responsible for the means, methods, techniques, sequences and procedures necessary to properly complete the Design in conformance with this Agreement, including the Project Management Plan and the Time Schedule.
16.2 The Design-BuilderBuilder will:
(a) will ensure that the Work and Work, including the Design are Design, is fully compliant with all requirements of this Agreement (including the Statement of Requirements) and all applicable Laws;; and
(b) will perform and complete the Design and the Work so as to provide the completed Project that is fit for the intended uses as described in the Statement of Requirements; and
(c) acknowledges and agrees that it has the non-delegable duty and obligation to the Authority to complete the Work, including the Design, in a manner that is fully compliant with all requirements of this Agreement and all Laws.
16.3 The Design-Builder will:
(a) cause all portions and aspects of the Drawings and Specifications to be prepared under the direction of, and to be sealed under the professional seal of, the Design-Builder’s Consultant;
(b) cause the Design-Builder’s Consultant to confirm to the AuthorityOwner, under his or her professional seal (if applicable), that in the opinion of the Design-Builder’s Consultant:
(i) the Drawings and Specifications implement and otherwise conform to the Statement of Requirements;
(ii) the Drawings and Specifications implement and otherwise conform to the Proposal Extracts;
(iii) the Drawings and Specifications have been prepared in accordance with, and substantially comply with, all Standards; and
(iv) the Design-Builder’s Consultant has carried out the general reviews of the progress of the Construction, to the extent necessary, in order to determine to the Design-Builder’s Consultant’s satisfaction that the Construction is performed in general conformity with the requirements of this Agreement (including the AgreementStatement of Requirements), the Drawings and Specifications Specifications, Standards and applicable Laws; and
(c) provide the Authority Owner and all applicable governmental authorities with all letters of professional assurance as required pursuant to applicable Laws.
16.4 The Design-Builder will not construct any part of the Work that is not based on the most recent Drawings and Specifications or that does not meet the Statement of Requirements and other requirements of this Agreement. To the extent that the Drawings and Specifications conflict with, modify or deviate from the Statement of Requirements and other requirements of this Agreement, the Design-Builder will revise the Drawings and Specifications and submit them to the Authority Owner under the Review Procedure.
16.5 The Design-Builder will make, or cause the Design-Builder’s Consultant to make, any revisions to the Drawings or Specifications as are necessary from time to time due to Changes and, for clarity, the Design-Builder will comply with Section 16.3 with respect to any such revisions.
16.6 Nothing in this Section 16, or otherwise in or under this Agreement, makes the AuthorityOwner, the AuthorityOwner’s Representative, the AuthorityOwner’s Consultant or any other person on behalf of the Authority Owner responsible for the Design of the Project, including compliance of the Drawings and Specifications with the Statement of Requirements and all Standards, and the Design-Builder will, notwithstanding any review or acceptance under the Review Procedure or this Section 16 or other act of the AuthorityOwner, the Owner’s Representative, the Owner’s Consultant or any other person on behalf of the Owner, remain solely liable and responsible for compliance of the Drawings and Specifications with the Statement of Requirements and all Standards.
16.7 Without limiting any of the obligations of the Design-Builder under this Agreement, the duties and responsibilities of the Design-Builder with respect to the Design include:
(a) review of the documents, reports, drawings, Statement of Requirements and other information provided by the Authority Owner and reporting promptly to the Authority Owner any error, inconsistency or omission the Design-Builder may discover;
(b) preparation of a Design that meets the Statement of Requirements, all Standards Standards, all applicable Laws and all terms of this Agreement;
(c) the coordination required to integrate all parts of the Design in the Work;
(d) preparation of all reports, documents, information, schemes and presentation materials as required by this Agreement;
(e) inspecting the progress of the Construction in order to determine that the Work is in compliance with the requirements of the Design, Specifications, all Standards and all terms of this Agreement;
(f) liaising with the Authority Owner and local authorities having jurisdiction as required during the Design and Construction and providing copies of all correspondence with such local authorities to the AuthorityOwner; and
(g) providing all required assurances to local authorities having jurisdiction respecting substantial conformance of the Design with all Standards and as may be required for the issuance of or compliance with any permits, licenses or approvals.
16.8 The Design-Builder will ensure that the Design-Builder’s Consultant and all other architectsArchitects, engineers Professional Engineers and other professionals performing professional services engaged in related to the Design and engaged directly or indirectly by the Design-Builder fulfill their duties and responsibilities to the standard of diligence, skill and care that such persons would customarily provide in accordance with their professional and legal obligations in similar circumstances and in the same general geographic location as the Site. Any failure by any of the Design-Builder’s Consultants or such other architectsArchitects, engineers Professional Engineers or professionals performing professional services in relation to the Design will not relieve the Design-Builder of any responsibility for ensuring that the Work is carried out in conformance with this Agreement including the Statement of Requirements, the Design and all Standards.
16.9 If the Design-Builder’s Consultant’s engagement is terminated, the Design-Builder will engage a new Design-Builder’s Consultant to provide the Design. The Design-Builder will notify the Authority Owner in writing before appointing or re-appointing the Design-Builder’s Consultant, and the Design-Design- Builder will not appoint any Design-Builder’s Consultant to whom the Authority Owner may reasonably object.
Appears in 1 contract
Samples: Design Build Agreement
General Design Requirements. 16.1 The Design-Builder is responsible for the means, methods, techniques, sequences and procedures necessary to properly complete the Design in conformance with this Agreement, including the Project Management Plan and the Time Schedule.
16.2 The Design-Builder:
(a) will ensure that the Work and including the Design are is fully compliant with all requirements of this Agreement and all Laws;; and
(b) will perform and complete the Design and the Work so as to provide the completed Project that is fit for the intended uses as described in the Statement of Requirements; and
(c) acknowledges and agrees that it has the non-delegable duty and obligation to the Authority to complete the Work, including the Design, in a manner that is fully compliant with all requirements of this Agreement and all Laws.
16.3 The Design-Builder will:
(a) cause all portions and aspects of the Drawings and Specifications to be prepared under the direction of, and to be sealed under the professional seal of, the Design-Builder’s Consultant;
(b) cause the Design-Builder’s Consultant to confirm to the AuthorityOwner, under his or her professional seal (if applicable), that in the opinion of the Design-Builder’s Consultant:
(i) the Drawings and Specifications implement and otherwise conform to the Statement of Requirements;
(ii) the Drawings and Specifications implement and otherwise conform to the Proposal Extracts;
(iii) the Drawings and Specifications have been prepared in accordance with, and substantially comply with, all Standards; and
(iv) the Design-Builder’s Consultant has carried out the general reviews of the progress of the Construction, to the extent necessary, in order to determine to the Design-Builder’s Consultant’s satisfaction that the Construction is performed in general conformity with the requirements of the Agreement, the Drawings and Specifications and applicable Laws; and
(c) provide the Authority Owner and all applicable governmental authorities with all letters of professional assurance as required pursuant to applicable Laws.
16.4 The Design-Builder will not construct any part of the Work that is not based on the most recent Drawings and Specifications or that does not meet the Statement of Requirements and other requirements of this Agreement. To the extent that the Drawings and Specifications conflict with, modify or deviate from the Statement of Requirements and other requirements of this Agreement, the Design-Builder will revise the Drawings and Specifications and submit them to the Authority Owner under the Review Procedure.
16.5 The Design-Builder will make, or cause the Design-Builder’s Consultant to make, any revisions to the Drawings or Specifications as are necessary from time to time due to Changes and, for clarity, the Design-Builder will comply with Section 16.3 with respect to any such revisions.
16.6 Nothing in this Section 16, or otherwise in or under this Agreement, makes the AuthorityOwner, the AuthorityOwner’s Representative, the AuthorityOwner’s Consultant or any other person on behalf of the Authority Owner responsible for the Design of the Project, including compliance of the Drawings and Specifications with the Statement of Requirements and all Standards, and the Design-Builder will, notwithstanding any review or acceptance under the Review Procedure or this Section 16 or other act of the AuthorityOwner, remain solely liable and responsible for compliance of the Drawings and Specifications with the Statement of Requirements and all Standards.
16.7 Without limiting any of the obligations of the Design-Builder under this Agreement, the duties and responsibilities of the Design-Builder with respect to the Design include:
(a) review of the documents, reports, drawings, Statement of Requirements and other information provided by the Authority Owner and reporting promptly to the Authority Owner any error, inconsistency or omission the Design-Builder may discover;
(b) preparation of a Design that meets the Statement of Requirements, all Standards Standards, all Laws, and all terms of this Agreement;
(c) the coordination required to integrate all parts of the Design in the Work;
(d) preparation of all reports, documents, information, schemes and presentation materials as required by this Agreement;
(e) inspecting the progress of the Construction in order to determine that the Work is in compliance with the requirements of the Design, Specifications, all Standards and all terms of this Agreement;
(f) liaising with the Authority Owner and local authorities having jurisdiction as required during the Design and Construction and providing copies of all correspondence with such local authorities to the AuthorityOwner; and
(g) providing all required assurances to local authorities having jurisdiction respecting substantial conformance of the Design with all Standards and as may be required for the issuance of or compliance with any permits, licenses or approvals.
16.8 The Design-Builder will ensure that the Design-Builder’s Consultant and all other architects, engineers and other professionals performing professional services engaged in related to the Design fulfill their duties and responsibilities to the standard of diligence, skill and care that such persons would customarily provide in accordance with their professional and legal obligations in similar circumstances and in the same general geographic location as the Site. Any failure by any of the Design-Builder’s Consultants or such other architects, engineers or professionals performing professional services in relation to the Design will not relieve the Design-Builder of any responsibility for ensuring that the Work is carried out in conformance with this Agreement including the Statement of Requirements, the Design and all Standards.
16.9 If the Design-Builder’s Consultant’s engagement is terminated, the Design-Builder will engage a new Design-Builder’s Consultant to provide the Design. The Design-Builder will notify the Authority Owner in writing before appointing or re-appointing the Design-Builder’s Consultant, and the Design-Design- Builder will not appoint any Design-Builder’s Consultant to whom the Authority Owner may reasonably object.
Appears in 1 contract
Samples: Design Build Agreement
General Design Requirements. 16.1 The Design-Builder is responsible for the means, methods, techniques, sequences and procedures necessary to properly complete the Design in conformance with this Agreement, including the Project Management Plan and the Time Schedule.
16.2 The Design-BuilderBuilder will:
(a) will ensure that the Work and Work, including the Design are Design, is fully compliant with all requirements of this Agreement and all applicable Laws;; and
(b) will perform and complete the Design and the Work so as to provide the completed Project that is fit for the intended uses as described in the Statement of Requirements; and
(c) acknowledges and agrees that it has the non-delegable duty and obligation to the Authority to complete the Work, including the Design, in a manner that is fully compliant with all requirements of this Agreement and all Laws.
16.3 The Design-Builder will:
(a) cause all portions and aspects of the Drawings and Specifications to be prepared under the direction of, and to be sealed under the professional seal of, the Design-Builder’s Consultant;
(b) cause the Design-Builder’s Consultant to confirm to the AuthorityOwner, under his or her professional seal (if applicable), that in the opinion of the Design-Builder’s Consultant:
(i) the Drawings and Specifications implement and otherwise conform to the Statement of Requirements;
(ii) the Drawings and Specifications implement and otherwise conform to the Proposal Extracts;
(iii) the Drawings and Specifications have been prepared in accordance with, and substantially comply with, all Standards; and
(iv) the Design-Builder’s Consultant has carried out the general reviews of the progress of the Construction, to the extent necessary, in order to determine to the Design-Builder’s Consultant’s satisfaction that the Construction is performed in general conformity with the requirements of the Agreement, the Drawings and Specifications and applicable Laws; and
(c) provide the Authority Owner and all applicable governmental authorities with all letters of professional assurance as required pursuant to applicable Laws.
16.4 The Design-Builder will not construct any part of the Work that is not based on the most recent Drawings and Specifications or that does not meet the Statement of Requirements and other requirements of this Agreement. To the extent that the Drawings and Specifications conflict with, modify or deviate from the Statement of Requirements and other requirements of this Agreement, the Design-Builder will revise the Drawings and Specifications and submit them to the Authority Owner under the Review Procedure.
16.5 The Design-Builder will make, or cause the Design-Builder’s Consultant to make, any revisions to the Drawings or Specifications as are necessary from time to time due to Changes and, for clarity, the Design-Builder will comply with Section 16.3 with respect to any such revisions.
16.6 Nothing in this Section 16, or otherwise in or under this Agreement, makes the AuthorityOwner, the AuthorityOwner’s Representative, the AuthorityOwner’s Consultant or any other person on behalf of the Authority Owner responsible for the Design of the Project, including compliance of the Drawings and Specifications with the Statement of Requirements and all Standards, and the Design-Builder will, notwithstanding any review or acceptance under the Review Procedure or this Section 16 or other act of the AuthorityOwner, remain solely liable and responsible for compliance of the Drawings and Specifications with the Statement of Requirements and all Standards.
16.7 Without limiting any of the obligations of the Design-Builder under this Agreement, the duties and responsibilities of the Design-Builder with respect to the Design include:
(a) review of the documents, reports, drawings, Statement of Requirements and other information provided by the Authority Owner and reporting promptly to the Authority Owner any error, inconsistency or omission the Design-Builder may discover;
(b) preparation of a Design that meets the Statement of Requirements, all Standards Standards, all applicable Laws and all terms of this Agreement;
(c) the coordination required to integrate all parts of the Design in the Work;
(d) preparation of all reports, documents, information, schemes and presentation materials as required by this Agreement;
(e) inspecting the progress of the Construction in order to determine that the Work is in compliance with the requirements of the Design, Specifications, all Standards and all terms of this Agreement;
(f) liaising with the Authority Owner and local authorities having jurisdiction as required during the Design and Construction and providing copies of all correspondence with such local authorities to the AuthorityOwner; and
(g) providing all required assurances to local authorities having jurisdiction respecting substantial conformance of the Design with all Standards and as may be required for the issuance of or compliance with any permits, licenses or approvals.
16.8 The Design-Builder will ensure that the Design-Builder’s Consultant and all other architects, engineers and other professionals performing professional services engaged in related to the Design fulfill their duties and responsibilities to the standard of diligence, skill and care that such persons would customarily provide in accordance with their professional and legal obligations in similar circumstances and in the same general geographic location as the Site. Any failure by any of the Design-Builder’s Consultants or such other architects, engineers or professionals performing professional services in relation to the Design will not relieve the Design-Builder of any responsibility for ensuring that the Work is carried out in conformance with this Agreement including the Statement of Requirements, the Design and all Standards.
16.9 If the Design-Builder’s Consultant’s engagement is terminated, the Design-Builder will engage a new Design-Builder’s Consultant to provide the Design. The Design-Builder will notify the Authority Owner in writing before appointing or re-appointing the Design-Builder’s Consultant, and the Design-Design- Builder will not appoint any Design-Builder’s Consultant to whom the Authority Owner may reasonably object.
Appears in 1 contract
Samples: Design Build Agreement
General Design Requirements.
16.1 The Design-Builder is responsible for the means, methods, techniques, sequences and procedures necessary to properly complete the Design in conformance with this Agreement, including the Project Management Plan and the Time Schedule.
16.2 The Design-Builder:Builder will:
(a) will ensure that the Work and Work, including the Design are Design, is fully compliant with all requirements of this Agreement and all applicable Laws;; and
(b) will perform and complete the Design and the Work so as to provide the completed Project that is fit for the intended uses as described in the Statement of Requirements; and
(c) acknowledges and agrees that it has the non-delegable duty and obligation to the Authority to complete the Work, including the Design, in a manner that is fully compliant with all requirements of this Agreement and all Laws.Requirements.
16.3 The Design-Builder will:
(a) cause all portions and aspects of the Drawings and Specifications to be prepared under the direction of, and to be sealed under the professional seal of, the Design-Builder’s Consultant;Consultant;
(b) cause the Design-Builder’s Consultant to confirm to the AuthorityOwner, under his or her professional seal (if applicable), that in the opinion of the Design-Builder’s Consultant:
(i) the Drawings and Specifications implement and otherwise conform to the Statement of Requirements;
(ii) the Drawings and Specifications implement and otherwise conform to the Proposal Extracts;
(iii) the Drawings and Specifications have been prepared in accordance with, and substantially comply with, all Standards; and
(iv) the Design-Builder’s Consultant has carried out the general reviews of the progress of the Construction, to the extent necessary, in order to determine to the Design-Builder’s Consultant’s satisfaction that the Construction is performed in general conformity with the requirements of the Agreement, the Drawings and Specifications and applicable Laws; and
(c) provide the Authority Owner and all applicable governmental authorities with all letters of professional assurance as required pursuant to applicable Laws.
16.4 The Design-Builder will not construct any part of the Work that is not based on the most recent Drawings and Specifications or that does not meet the Statement of Requirements and other requirements of this Agreement. To the extent that the Drawings and Specifications conflict with, modify or deviate from the Statement of Requirements and other requirements of this Agreement, the Design-Builder will revise the Drawings and Specifications and submit them to the Authority Owner under the Review Procedure.
16.5 The Design-Builder will make, or cause the Design-Builder’s Consultant to make, any revisions to the Drawings or Specifications as are necessary from time to time due to Changes and, for clarity, the Design-Builder will comply with Section 16.3 with respect to any such revisions.revisions.
16.6 Nothing in this Section 16, or otherwise in or under this Agreement, makes the AuthorityOwner, the AuthorityOwner’s Representative, the AuthorityOwner’s Consultant or any other person on behalf of the Authority Owner responsible for the Design of the Project, including compliance of the Drawings and Specifications with the Statement of Requirements and all Standards, and the Design-Builder will, notwithstanding any review or acceptance under the Review Procedure or this Section 16 or other act of the AuthorityOwner, remain solely liable and responsible for compliance of the Drawings and Specifications with the Statement of Requirements and all Standards.
16.7 Without limiting any of the obligations of the Design-Builder under this Agreement, the duties and responsibilities of the Design-Builder with respect to the Design include:
(a) review of the documents, reports, drawings, Statement of Requirements and other information provided by the Authority Owner and reporting promptly to the Authority Owner any error, inconsistency or omission the Design-Builder may discover;discover;
(b) preparation of a Design that meets the Statement of Requirements, all Standards Standards, all applicable Laws and all terms of this Agreement;
(c) the coordination required to integrate all parts of the Design in the Work;
(d) preparation of all reports, documents, information, schemes and presentation materials as required by this Agreement;
(e) inspecting the progress of the Construction in order to determine that the Work is in compliance with the requirements of the Design, Specifications, all Standards and all terms of this Agreement;Agreement;
(f) liaising with the Authority Owner and local authorities having jurisdiction as required during the Design and Construction and providing copies of all correspondence with such local authorities to the AuthorityOwner; and
(g) providing all required assurances to local authorities having jurisdiction respecting substantial conformance of the Design with all Standards and as may be required for the issuance of or compliance with any permits, licenses or approvals.approvals.
16.8 The Design-Builder will ensure that the Design-Builder’s Consultant and all other architects, engineers and other professionals performing professional services engaged in related to the Design fulfill their duties and responsibilities to the standard of diligence, skill and care that such persons would customarily provide in accordance with their professional and legal obligations in similar circumstances and in the same general geographic location as the Site. Any failure by any of the Design-Builder’s Consultants or such other architects, engineers or professionals performing professional services in relation to the Design will not relieve the Design-Builder of any responsibility for ensuring that the Work is carried out in conformance with this Agreement including the Statement of Requirements, the Design and all Standards.
16.9 If the Design-Builder’s Consultant’s engagement is terminated, the Design-Builder will engage a new Design-Builder’s Consultant to provide the Design. The Design-Builder will notify the Authority Owner in writing before appointing or re-appointing the Design-Builder’s Consultant, and the Design-Design- Builder will not appoint any Design-Builder’s Consultant to whom the Authority Owner may reasonably object.object.
Appears in 1 contract
Samples: Design Build Agreement
General Design Requirements. 16.1 The Design-Builder is responsible for the means, methods, techniques, sequences and procedures necessary to properly complete the Design in conformance with this Agreement, including the Project Management Plan and the Time Schedule.Schedule.
16.2 The Design-BuilderBuilder will:
(a) will ensure that the Work and Work, including the Design are Design, is fully compliant with all requirements of this Agreement (including the Statement of Requirements) and all applicable Laws;; and
(b) will perform and complete the Design and the Work so as to provide the completed Project that is fit for the intended uses as described in the Statement of Requirements; and
(c) acknowledges and agrees that it has the non-delegable duty and obligation to the Authority to complete the Work, including the Design, in a manner that is fully compliant with all requirements of this Agreement and all Laws.
16.3 The Design-Builder will:will:
(a) cause all portions and aspects of the Drawings and Specifications to be prepared under the direction of, and to be sealed under the professional seal of, the Design-Builder’s Consultant;Consultant;
(b) cause the Design-Builder’s Consultant to confirm to the AuthorityOwner, under his or her professional seal (if applicable), that in the opinion of the Design-Builder’s Consultant:
(i) the Drawings and Specifications implement and otherwise conform to the Statement of Requirements;
(ii) the Drawings and Specifications implement and otherwise conform to the Proposal Extracts;
(iii) the Drawings and Specifications have been prepared in accordance with, and substantially comply with, all Standards; and
(iv) the Design-Builder’s Consultant has carried out the general reviews of the progress of the Construction, to the extent necessary, in order to determine to the Design-Builder’s Consultant’s satisfaction that the Construction is performed in general conformity with the requirements of the AgreementAgreement (including the Statement of Requirements), the Drawings and Specifications Specifications, Standards and applicable Laws; and
(c) provide the Authority Owner and all applicable governmental authorities with all letters of professional assurance as required pursuant to applicable Laws.
16.4 The Design-Builder will not construct any part of the Work that is not based on the most recent Drawings and Specifications or that does not meet the Statement of Requirements and other requirements of this Agreement. To the extent that the Drawings and Specifications conflict with, modify or deviate from the Statement of Requirements and other requirements of this Agreement, the Design-Builder will revise the Drawings and Specifications and submit them to the Authority Owner under the Review Procedure.Procedure.
16.5 The Design-Builder will make, or cause the Design-Builder’s Consultant to make, any revisions to the Drawings or Specifications as are necessary from time to time due to Changes and, for clarity, the Design-Builder will comply with Section 16.3 with respect to any such revisions.
16.6 Nothing in this Section 16, or otherwise in or under this Agreement, makes the AuthorityOwner, the AuthorityOwner’s Representative, the AuthorityOwner’s Consultant Consultant, the Payment Certifier or any other person on behalf of the Authority Owner responsible for the Design of the Project, including compliance of the Drawings and Specifications with the Statement of Requirements and all Standards, and the Design-Builder will, notwithstanding any review or acceptance under the Review Procedure or this Section 16 or other act of the AuthorityOwner, the Owner’s Representative, the Owner’s Consultant or any other person on behalf of the Owner remain solely liable and responsible for compliance of the Drawings and Specifications with the Statement of Requirements and all Standards.Standards.
16.7 Without limiting any of the obligations of the Design-Builder under this Agreement, the duties and responsibilities of the Design-Builder with respect to the Design include:
(a) review of the documents, reports, drawings, Statement of Requirements and other information provided by the Authority Owner and reporting promptly to the Authority Owner any error, inconsistency or omission the Design-Builder may discover;discover;
(b) preparation of a Design that meets the Statement of Requirements, all Standards Standards, all applicable Laws and all terms of this Agreement;
(c) the coordination required to integrate all parts of the Design in the Work;
(d) preparation of all reports, documents, information, schemes and presentation materials as required by this Agreement;Agreement;
(e) inspecting the progress of the Construction in order to determine that the Work is in compliance with the requirements of the Design, Specifications, all Standards and all terms of this Agreement;
(f) liaising with the Authority Owner and local authorities having jurisdiction as required during the Design and Construction and providing copies of all correspondence with such local authorities to the AuthorityOwner; and
(g) providing all required assurances to local authorities having jurisdiction respecting substantial conformance of the Design with all Standards and as may be required for the issuance of or compliance with any permits, licenses or approvals.
16.8 The Design-Builder will ensure that the Design-Builder’s Consultant and all other architectsArchitects, engineers Professional Engineers and other professionals performing professional services engaged in related to the Design and engaged directly or indirectly by the Design-Builder fulfill their duties and responsibilities to the standard of diligence, skill and care that such persons would customarily provide in accordance with their professional and legal obligations in similar circumstances and in the same general geographic location as the Site. Any failure by any of the Design-Builder’s Consultants or such other architectsArchitects, engineers Professional Engineers or professionals performing professional services in relation to the Design will not relieve the Design-Builder of any responsibility for ensuring that the Work is carried out in conformance with this Agreement including the Statement of Requirements, the Design and all Standards.Standards.
16.9 If the Design-Builder’s Consultant’s engagement is terminated, the Design-Builder will engage a new Design-Builder’s Consultant to provide the Design. The Design-Builder will notify the Authority Owner in writing before appointing or re-appointing the Design-Builder’s Consultant, and the Design-Design- Builder will not appoint any Design-Builder’s Consultant to whom the Authority Owner may reasonably object.object.
Appears in 1 contract
Samples: Design Build Agreement
General Design Requirements. 16.1 The Design-Builder is responsible for the means, methods, techniques, sequences and procedures necessary to properly complete the Design in conformance with this Agreement, including the Project Management Plan and the Time Schedule.
16.2 The Design-BuilderBuilder will:
(a) will ensure that the Work and Work, including the Design are Design, is fully compliant with all requirements of this Agreement (including the Statement of Requirements) and all applicable Laws;; and
(b) will perform and complete the Design and the Work so as to provide the completed Project that is fit for the intended uses as described in the Statement of Requirements; and
(c) acknowledges and agrees that it has the non-delegable duty and obligation to the Authority to complete the Work, including the Design, in a manner that is fully compliant with all requirements of this Agreement and all Laws.
16.3 The Design-Builder will:
(a) cause all portions and aspects of the Drawings and Specifications to be prepared under the direction of, and to be sealed under the professional seal of, the Design-Design- Builder’s Consultant;
(b) cause the Design-Builder’s Consultant to confirm to the Authority, under his or her professional seal (if applicable), that in the opinion of the Design-Builder’s Consultant:
(i) the Drawings and Specifications implement and otherwise conform to the Statement of Requirements;
(ii) the Drawings and Specifications implement and otherwise conform to the Proposal Extracts;
(iii) the Drawings and Specifications have been prepared in accordance with, and substantially comply with, all Standards; and
(iv) the Design-Builder’s Consultant has carried out the general reviews of the progress of the Construction, to the extent necessary, in order to determine to the Design-Builder’s Consultant’s satisfaction that the Construction is performed in general conformity with the requirements of the AgreementAgreement (including the Statement of Requirements), the Drawings and Specifications Specifications, Standards and applicable Laws; and
(c) provide the Authority and all applicable governmental authorities with all letters of professional assurance as required pursuant to applicable Laws.
16.4 The Design-Builder will not construct any part of the Work that is not based on the most recent Drawings and Specifications or that does not meet the Statement of Requirements and other requirements of this Agreement. To the extent that the Drawings and Specifications conflict with, modify or deviate from the Statement of Requirements and other requirements of this Agreement, the Design-Builder will revise the Drawings and Specifications and submit them to the Authority under the Review Procedure.
16.5 The Design-Builder will make, or cause the Design-Builder’s Consultant to make, any revisions to the Drawings or Specifications as are necessary from time to time due to Changes and, for clarity, the Design-Builder will comply with Section 16.3 with respect to any such revisions.
16.6 Nothing in this Section 16, or otherwise in or under this Agreement, makes the Authority, the Authority’s Representative, the Authority’s Consultant or any other person on behalf of the Authority responsible for the Design of the Project, including compliance of the Drawings and Specifications with the Statement of Requirements and all Standards, and the Design-Builder will, notwithstanding any review or acceptance under the Review Procedure or this Section 16 or other act of the Authority, remain solely liable and responsible for compliance of the Drawings and Specifications with the Statement of Requirements and all Standards.
16.7 Without limiting any of the obligations of the Design-Builder under this Agreement, the duties and responsibilities of the Design-Builder with respect to the Design include:
(a) review of the documents, reports, drawings, Statement of Requirements and other information provided by the Authority and reporting promptly to the Authority any error, inconsistency or omission the Design-Builder may discover;
(b) preparation of a Design that meets the Statement of Requirements, all Standards Standards, all applicable Laws and all terms of this Agreement;
(c) the coordination required to integrate all parts of the Design in the Work;
(d) preparation of all reports, documents, information, schemes and presentation materials as required by this Agreement;
(e) inspecting the progress of the Construction in order to determine that the Work is in compliance with the requirements of the Design, Specifications, all Standards and all terms of this Agreement;
(f) liaising with the Authority and local authorities having jurisdiction as required during the Design and Construction and providing copies of all correspondence with such local authorities to the Authority; and
(g) providing all required assurances to local authorities having jurisdiction respecting substantial conformance of the Design with all Standards and as may be required for the issuance of or compliance with any permits, licenses or approvals.
16.8 The Design-Builder will ensure that the Design-Builder’s Consultant and all other architectsArchitects, engineers Professional Engineers and other professionals performing professional services engaged in related to the Design fulfill their duties and responsibilities to the standard of diligence, skill and care that such persons would customarily provide in accordance with their professional and legal obligations in similar circumstances and in the same general geographic location as the Site. Any failure by any of the Design-Builder’s Consultants or such other architectsArchitects, engineers Professional Engineers or professionals performing professional services in relation to the Design will not relieve the Design-Builder of any responsibility for ensuring that the Work is carried out in conformance with this Agreement including the Statement of Requirements, the Design and all Standards.
16.9 If the Design-Builder’s Consultant’s engagement is terminated, the Design-Builder will engage a new Design-Builder’s Consultant to provide the Design. The Design-Builder will notify the Authority in writing before appointing or re-appointing the Design-Design- Builder’s Consultant, and the Design-Builder will not appoint any Design-Builder’s Consultant to whom the Authority may reasonably object.
Appears in 1 contract
Samples: Design Build Agreement
General Design Requirements. 16.1 The Design-Builder is responsible for the means, methods, techniques, sequences and procedures necessary to properly complete the Design in conformance with this Agreement, including the Project Management Plan and the Time Schedule.
16.2 The Design-BuilderBuilder will:
(a) will ensure that the Work and Work, including the Design are Design, is fully compliant with all requirements of this Agreement (including the Statement of Requirements) and all applicable Laws;; and
(b) will perform and complete the Design and the Work so as to provide the completed Project that is fit for the intended uses as described in the Statement of Requirements; and
(c) acknowledges and agrees that it has the non-delegable duty and obligation to the Authority to complete the Work, including the Design, in a manner that is fully compliant with all requirements of this Agreement and all Laws.
16.3 The Design-Builder will:
(a) cause all portions and aspects of the Drawings and Specifications to be prepared under the direction of, and to be sealed under the professional seal of, the Design-Builder’s Consultant;
(b) cause the Design-Builder’s Consultant to confirm to the AuthorityOwner, under his or her professional seal (if applicable), that in the opinion of the Design-Builder’s Consultant:
(i) the Drawings and Specifications implement and otherwise conform to the Statement of Requirements;
(ii) the Drawings and Specifications implement and otherwise conform to the Proposal Extracts;
(iii) the Drawings and Specifications have been prepared in accordance with, and substantially comply with, all Standards; and
(iv) the Design-Builder’s Consultant has carried out the general reviews of the progress of the Construction, to the extent necessary, in order to determine to the Design-Builder’s Consultant’s satisfaction that the Construction is performed in general conformity with the requirements of the AgreementAgreement (including the Statement of Requirements), the Drawings and Specifications Specifications, Standards and applicable Laws; and
(c) provide the Authority Owner and all applicable governmental authorities with all letters of professional assurance as required pursuant to applicable Laws.
16.4 The Design-Builder will not construct any part of the Work that is not based on the most recent Drawings and Specifications or that does not meet the Statement of Requirements and other requirements of this Agreement. To the extent that the Drawings and Specifications conflict with, modify or deviate from the Statement of Requirements and other requirements of this Agreement, the Design-Builder will revise the Drawings and Specifications and submit them to the Authority Owner under the Review Procedure.
16.5 The Design-Builder will make, or cause the Design-Builder’s Consultant to make, any revisions to the Drawings or Specifications as are necessary from time to time due to Changes and, for clarity, the Design-Builder will comply with Section 16.3 with respect to any such revisions.
16.6 Nothing in this Section 16, or otherwise in or under this Agreement, makes the AuthorityOwner, the AuthorityOwner’s Representative, the AuthorityOwner’s Consultant or any other person on behalf of the Authority Owner responsible for the Design of the Project, including compliance of the Drawings and Specifications with the Statement of Requirements and all Standards, and the Design-Builder will, notwithstanding any review or acceptance under the Review Procedure or this Section 16 or other act of the AuthorityOwner, remain solely liable and responsible for compliance of the Drawings and Specifications with the Statement of Requirements and all Standards.
16.7 Without limiting any of the obligations of the Design-Builder under this Agreement, the duties and responsibilities of the Design-Builder with respect to the Design include:
(a) review of the documents, reports, drawings, Statement of Requirements and other information provided by the Authority Owner and reporting promptly to the Authority Owner any error, inconsistency or omission the Design-Builder may discover;
(b) preparation of a Design that meets the Statement of Requirements, all Standards Standards, all applicable Laws and all terms of this Agreement;
(c) the coordination required to integrate all parts of the Design in the Work;
(d) preparation of all reports, documents, information, schemes and presentation materials as required by this Agreement;
(e) inspecting the progress of the Construction in order to determine that the Work is in compliance with the requirements of the Design, Specifications, all Standards and all terms of this Agreement;
(f) liaising with the Authority Owner and local authorities having jurisdiction as required during the Design and Construction and providing copies of all correspondence with such local authorities to the AuthorityOwner; and
(g) providing all required assurances to local authorities having jurisdiction respecting substantial conformance of the Design with all Standards and as may be required for the issuance of or compliance with any permits, licenses or approvals.
16.8 The Design-Builder will ensure that the Design-Builder’s Consultant and all other architectsArchitects, engineers Professional Engineers and other professionals performing professional services engaged in related to the Design fulfill their duties and responsibilities to the standard of diligence, skill and care that such persons would customarily provide in accordance with their professional and legal obligations in similar circumstances and in the same general geographic location as the Site. Any failure by any of the Design-Builder’s Consultants or such other architectsArchitects, engineers Professional Engineers or professionals performing professional services in relation to the Design will not relieve the Design-Builder of any responsibility for ensuring that the Work is carried out in conformance with this Agreement including the Statement of Requirements, the Design and all Standards.
16.9 If the Design-Builder’s Consultant’s engagement is terminated, the Design-Builder will engage a new Design-Builder’s Consultant to provide the Design. The Design-Builder will notify the Authority Owner in writing before appointing or re-appointing the Design-Builder’s Consultant, and the Design-Design- Builder will not appoint any Design-Builder’s Consultant to whom the Authority Owner may reasonably object.
Appears in 1 contract
Samples: Design Build Agreement
General Design Requirements. 16.1 The Design-Builder is responsible for the means, methods, techniques, sequences and procedures necessary to properly complete the Design in conformance with this Agreement, including the Project Management Plan and the Time Schedule.
16.2 The Design-Builder:
(a) will Builder will: ensure that the Work and Work, including the Design are Design, is fully compliant with all requirements of this Agreement (including the Statement of Requirements) and all applicable Laws;
(b) will ; and perform and complete the Design and the Work so as to provide the completed Project that is fit for the intended uses as described in the Statement of Requirements; and
(c) acknowledges and agrees that it has the non-delegable duty and obligation to the Authority to complete the Work, including the Design, in a manner that is fully compliant with all requirements of this Agreement and all Laws.
16.3 The Design-Builder will:
(a) : cause all portions and aspects of the Drawings and Specifications to be prepared under the direction of, and to be sealed under the professional seal of, the Design-Builder’s 's Consultant;
(b) ; cause the Design-Builder’s 's Consultant to confirm to the Authority, under his or her professional seal (if applicable), that in the opinion of the Design-Builder’s 's Consultant:
(i) the Drawings and Specifications implement and otherwise conform to the Statement of Requirements;
(ii) the Drawings and Specifications implement and otherwise conform to the Proposal Extracts;
(iii) the Drawings and Specifications have been prepared in accordance with, and substantially comply with, all Standards; and
(iv) the Design-Builder’s 's Consultant has carried out the general reviews of the progress of the Construction, to the extent necessary, in order to determine to the Design-Design- Builder’s 's Consultant’s 's satisfaction that the Construction is performed in general conformity with the requirements of the AgreementAgreement (including the Statement of Requirements), the Drawings and Specifications Specifications, Standards and applicable Laws; and
(c) and provide the Authority and all applicable governmental authorities with all letters of professional assurance as required pursuant to applicable Laws.
16.4 The Design-Builder will not construct any part of the Work that is not based on the most recent Drawings and Specifications or that does not meet the Statement of Requirements and other requirements of this Agreement. To the extent that the Drawings and Specifications conflict with, modify or deviate from the Statement of Requirements and other requirements of this Agreement, the Design-Builder will revise the Drawings and Specifications and submit them to the Authority under the Review Procedure.
16.5 The Design-Builder will make, or cause the Design-Builder’s 's Consultant to make, any revisions to the Drawings or Specifications as are necessary from time to time due to Changes and, for clarity, the Design-Builder will comply with Section 16.3 with respect to any such revisions.
16.6 Nothing in this Section 16, or otherwise in or under this Agreement, makes the Authority, the Authority’s 's Representative, the Authority’s 's Consultant or any other person on behalf of the Authority responsible for the Design of the Project, including compliance of the Drawings and Specifications with the Statement of Requirements and all Standards, and the Design-Builder will, notwithstanding any review or acceptance under the Review Procedure or this Section 16 or other act of the Authority, the Authority's Representative, the Authority's Consultant or any other person on behalf of the Authority, remain solely liable and responsible for compliance of the Drawings and Specifications with the Statement of Requirements and all Standards.
16.7 Without limiting any of the obligations of the Design-Builder under this Agreement, the duties and responsibilities of the Design-Builder with respect to the Design include:
(a) : review of the documents, reports, drawings, Statement of Requirements and other information provided by the Authority and reporting promptly to the Authority any error, inconsistency or omission the Design-Builder may discover;
(b) ; preparation of a Design that meets the Statement of Requirements, all Standards Standards, all applicable Laws and all terms of this Agreement;
(c) ; the coordination required to integrate all parts of the Design in the Work;
(d) ; preparation of all reports, documents, information, schemes and presentation materials as required by this Agreement;
(e) ; inspecting the progress of the Construction in order to determine that the Work is in compliance with the requirements of the Design, Specifications, all Standards and all terms of this Agreement;
(f) ; liaising with the Authority and local authorities having jurisdiction as required during the Design and Construction and providing copies of all correspondence with such local authorities to the Authority; and
(g) and providing all required assurances to local authorities having jurisdiction respecting substantial conformance of the Design with all Standards and as may be required for the issuance of or compliance with any permits, licenses or approvals.
16.8 The Design-Builder will ensure that the Design-Builder’s 's Consultant and all other architectsArchitects, engineers Professional Engineers and other professionals performing professional services engaged in related to the Design and engaged directly or indirectly by the Design-Builder fulfill their duties and responsibilities to the standard of diligence, skill and care that such persons would customarily provide in accordance with their professional and legal obligations in similar circumstances and in the same general geographic location as the Site. Any failure by any of the Design-Builder’s 's Consultants or such other architectsArchitects, engineers Professional Engineers or professionals performing professional services in relation to the Design will not relieve the Design-Builder of any responsibility for ensuring that the Work is carried out in conformance with this Agreement including the Statement of Requirements, the Design and all Standards.
16.9 If the Design-Builder’s 's Consultant’s 's engagement is terminated, the Design-Builder will engage a new Design-Builder’s 's Consultant to provide the Design. The Design-Builder will notify the Authority in writing before appointing or re-appointing the Design-Builder’s 's Consultant, and the Design-Builder will not appoint any Design-Builder’s 's Consultant to whom the Authority may reasonably object.
Appears in 1 contract
Samples: Design Build Agreement
General Design Requirements. 16.1 The Design-Builder is responsible for the means, methods, techniques, sequences and procedures necessary to properly complete the Design in conformance with this Agreement, including the Project Management Plan and the Time Schedule.
16.2 The Design-BuilderBuilder will:
(a) will ensure that the Work and Work, including the Design are Design, is fully compliant with all requirements of this Agreement (including the Statement of Requirements) and all applicable Laws;; and
(b) will perform and complete the Design and the Work so as to provide the completed Project that is fit for the intended uses as described in the Statement of Requirements; and
(c) acknowledges and agrees that it has the non-delegable duty and obligation to the Authority to complete the Work, including the Design, in a manner that is fully compliant with all requirements of this Agreement and all Laws.
16.3 The Design-Builder will:
(a) cause all portions and aspects of the Drawings and Specifications to be prepared under the direction of, and to be sealed under the professional seal of, the Design-Design- Builder’s Consultant;
(b) cause the Design-Builder’s Consultant to confirm to the AuthorityOwner, under his or her professional seal (if applicable), that in the opinion of the Design-Builder’s Consultant:
(i) the Drawings and Specifications implement and otherwise conform to the Statement of Requirements;
(ii) the Drawings and Specifications implement and otherwise conform to the Proposal Extracts;
(iii) the Drawings and Specifications have been prepared in accordance with, and substantially comply with, all Standards; and
(iv) the Design-Builder’s Consultant has carried out the general reviews of the progress of the Construction, to the extent necessary, in order to determine to the Design-Builder’s Consultant’s satisfaction that the Construction is performed in general conformity with the requirements of the AgreementAgreement (including the Statement of Requirements), the Drawings and Specifications Specifications, Standards and applicable Laws; and
(c) provide the Authority Owner and all applicable governmental authorities with all letters of professional assurance as required pursuant to applicable Laws.
16.4 The Design-Builder will not construct any part of the Work that is not based on the most recent Drawings and Specifications or that does not meet the Statement of Requirements and other requirements of this Agreement. To the extent that the Drawings and Specifications conflict with, modify or deviate from the Statement of Requirements and other requirements of this Agreement, the Design-Builder will revise the Drawings and Specifications and submit them to the Authority Owner under the Review Procedure.
16.5 The Design-Builder will make, or cause the Design-Builder’s Consultant to make, any revisions to the Drawings or Specifications as are necessary from time to time due to Changes and, for clarity, the Design-Builder will comply with Section 16.3 with respect to any such revisions.
16.6 Nothing in this Section 16, or otherwise in or under this Agreement, makes the AuthorityOwner, the AuthorityOwner’s Representative, the AuthorityOwner’s Consultant or any other person on behalf of the Authority Owner responsible for the Design of the Project, including compliance of the Drawings and Specifications with the Statement of Requirements and all Standards, and the Design-Design- Builder will, notwithstanding any review or acceptance under the Review Procedure or this Section 16 or other act of the AuthorityOwner, remain solely liable and responsible for compliance of the Drawings and Specifications with the Statement of Requirements and all Standards.
16.7 Without limiting any of the obligations of the Design-Builder under this Agreement, the duties and responsibilities of the Design-Builder with respect to the Design include:
(a) review of the documents, reports, drawings, Statement of Requirements and other information provided by the Authority Owner and reporting promptly to the Authority Owner any error, inconsistency or omission the Design-Builder may discover;
(b) preparation of a Design that meets the Statement of Requirements, all Standards Standards, all applicable Laws and all terms of this Agreement;
(c) the coordination required to integrate all parts of the Design in the Work;
(d) preparation of all reports, documents, information, schemes and presentation materials as required by this Agreement;
(e) inspecting the progress of the Construction in order to determine that the Work is in compliance with the requirements of the Design, Specifications, all Standards and all terms of this Agreement;
(f) liaising with the Authority Owner and local authorities having jurisdiction as required during the Design and Construction and providing copies of all correspondence with such local authorities to the AuthorityOwner; and
(g) providing all required assurances to local authorities having jurisdiction respecting substantial conformance of the Design with all Standards and as may be required for the issuance of or compliance with any permits, licenses or approvals.
16.8 The Design-Builder will ensure that the Design-Builder’s Consultant and all other architectsArchitects, engineers Professional Engineers and other professionals performing professional services engaged in related to the Design and engaged directly or indirectly by the Design-Builder fulfill their duties and responsibilities to the standard of diligence, skill and care that such persons would customarily provide in accordance with their professional and legal obligations in similar circumstances and in the same general geographic location as the Site. Any failure by any of the Design-Builder’s Consultants or such other architectsArchitects, engineers Professional Engineers or professionals performing professional services in relation to the Design will not relieve the Design-Builder of any responsibility for ensuring that the Work is carried out in conformance with this Agreement including the Statement of Requirements, the Design and all Standards.
16.9 If the Design-Builder’s Consultant’s engagement is terminated, the Design-Builder will engage a new Design-Builder’s Consultant to provide the Design. The Design-Builder will notify the Authority Owner in writing before appointing or re-appointing the Design-Builder’s Consultant, and the Design-Builder will not appoint any Design-Builder’s Consultant to whom the Authority Owner may reasonably object.