GENERAL USE OF AND CONSTRUCTION IN RIGHT OF WAY Sample Clauses

GENERAL USE OF AND CONSTRUCTION IN RIGHT OF WAY. 13.1 Relationship with Other Laws. Construction work and maintenance of any and all Facilities within the City's Rights of Way shall be done in accordance with the Seattle Municipal Code, including, but not limited to, SMC Title 11, SMC Title 15, and SMC Ch. 21.60; City of Seattle Standard Specifications for Road, Bridge and Municipal Construction; City of Seattle Standard Plans for Municipal Construction; City of Seattle Traffic Control Manual for In-Street Work; Seattle Street and Sidewalk Pavement Opening and Restoration Rules (Director's Rule 94-8); any other applicable ordinance, rule or policy, and any amendments thereto. The provisions of Section 13 are meant to be supplemental to the above provisions. In the event of a conflict between the above provisions and this Franchise, the above provisions shall prevail.
AutoNDA by SimpleDocs
GENERAL USE OF AND CONSTRUCTION IN RIGHT OF WAY. 37 13.1 Relationship with Other Laws. 38 13.2 Construction. 38 13.3 Relocation. 38 13.4 Restoration of City's Rights of Way. 39 13.5 Maintenance and Workmanship. 39 13.6 Acquisition of Facilities. 39 13.7 Reservation of City Right of Way Rights. 39 13.8 Reservation of Rights and Privileges. 40 13.9 Street Vacation. 40 13.10 Discontinuing Use of Facilities. 40 13.11 Hazardous Substances. 40 13.12 Undergrounding of Cable. 41 13.13 Construction Codes. 41 13.14 Construction and Use of Poles. 41 SECTION 14. TRANSFER OF GRANTEE'S CABLE SYSTEM 42 14.1 Prior Consent of City. 42
GENERAL USE OF AND CONSTRUCTION IN RIGHT OF WAY. 12.1 Relationship with Other Laws. Construction work and maintenance of any and all of Grantee’s Facilities within the City's Rights-of-Way shall be done in accordance with the Xxxxxx Island Municipal Code.
GENERAL USE OF AND CONSTRUCTION IN RIGHT OF WAY. 32 13.1 Relationship with Other Laws 32 13.2 Construction. 32 13.3 Relocation. 33 13.4 Restoration of City's Rights of Way 33 13.5 Maintenance and Quality of Work. 33 13.6 Acquisition of Facilities 33 13.7 Reservation of City Right of Way Rights 34 13.8 Reservation of Rights and Privileges 34 13.9 Street Vacation. 34 13.10 Discontinuing Use of Facilities 34 13.11 Hazardous Substances 35 13.12 Undergrounding of Cable 35 13.13 Construction Codes 35 13.14 Construction and Use of Poles 35 SECTION 14. TRANSFER OR ASSIGNMENT 36 SECTION 15. PROCEDURES IN THE EVENT OF EXPIRATION, TERMINATION, REVOCATION, OR NON-RENEWAL 36
GENERAL USE OF AND CONSTRUCTION IN RIGHT OF WAY 

Related to GENERAL USE OF AND CONSTRUCTION IN RIGHT OF WAY

  • Headings and Construction The headings of sections in this Agreement are for convenience of reference only and are not intended to qualify the meaning of any section. Any reference to a section number shall refer to a section of this Agreement, unless otherwise stated.

  • Definitions and Construction 1 1.1 Definitions.....................................................................................1 1.2

  • WARRANTY OF CONSTRUCTION A. In addition to any other warranties in this Contract, the Contractor warrants, except as provided in Paragraph D. of this Article, that work performed under this Contract conforms to the Contract requirements and is free of any defect in equipment, material, or design furnished, or workmanship performed by the Contractor or any subcontractor or supplier at any tier.

  • DAF Construction The DAF shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Developer and Connecting Transmission Owner agree on another mutually acceptable deadline, the Developer shall deliver to the Connecting Transmission Owner and NYISO “as- built” drawings, information and documents for the DAF, such as: a one-line diagram, a site plan showing the Large Generating Facility and the DAF, plan and elevation drawings showing the layout of the DAF, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Developer’s step-up transformers, the facilities connecting the Large Generating Facility to the step-up transformers and the DAF, and the impedances (determined by factory tests) for the associated step-up transformers and the Large Generating Facility. The Developer shall provide to, and coordinate with, Connecting Transmission Owner and NYISO with respect to proposed specifications for the excitation system, automatic voltage regulator, Large Generating Facility control and protection settings, transformer tap settings, and communications, if applicable.

  • ICIF Construction The ICIF shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Parties agree on another mutually acceptable deadline, Interconnection Customer shall deliver to Transmission Provider and Transmission Owner “as-built” drawings, information and documents for the ICIF, such as: a one-line diagram, a site plan showing the Generating Facility and the ICIF, plan and elevation drawings showing the layout of the ICIF, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Interconnection Customer’s step-up transformers, the facilities connecting the Generating Facility to the step-up transformers and the ICIF, and the impedances (determined by factory tests) for the associated step-up transformers and the Generating Facility. Interconnection Customer shall provide Transmission Provider and Transmission Owner with Interconnection Customer’s specifications for the excitation system, automatic voltage regulator, Generating Facility control and protection settings, transformer tap settings, and communications, if applicable.

  • Identification of Construction Documents The Design Professional shall identify the Construction Documents, which shall include, but are not limited to, the Specifications, the Drawings, and all Addenda. The Construction Documents are included within the Contract Documents.

  • General construction 20.2.1. Binding Nature.............................................. 20.2.2. Entire Agreement............................................ 20.2.3. Governing Law............................................... 20.2.4. Indulgences Not Waivers..................................... 20.2.5. Titles Not to Affect Interpretation......................... 20.2.6.

  • Suspension of unsafe Construction Works (i) Upon recommendation of the Authority’s Engineer to this effect, the Authority may by notice require the Contractor to suspend forthwith the whole or any part of the Works if, in the reasonable opinion of the Authority’s Engineer, such work threatens the safety of the Users and pedestrians.

  • General Construction Obligations (a) Without limiting Section 10.3:

  • Application of General Conditions These General Conditions set forth the terms and conditions generally applicable to the Development Grant Agreement to the extent and subject to any modifications set forth in such agreement.”