Generating Facility Location Sample Clauses

Generating Facility Location. 2.5.1 This agreement is applicable only to the Generating Facility described below and installed at the above location. The Generating Facility may not be relocated or connected to AEC’s system at any other location without AEC’s express written permission. 2.5.2 This Agreement is applicable only to Renewable Electrical Generating Facilities, which includes biomass, solar thermal, photovoltaic, wind, geothermal, fuel cells (using renewable fuel), small hydroelectric generation, digester gas, municipal solid waste conversion, landfill gas, and any additions or enhancements using such technology. 2.5.3 Renewable Electrical Generating Facilities using fuel cells, municipal solid waste conversion, and small hydroelectric generating will be required to sign an Affidavit certifying the following criteria have been met: a) For purposes of this Agreement, qualifying “solid waste conversion” is defined pursuant to Public Resources Code Section 25741(b)(3). b) For purposes of qualifying under “fuel cell” using renewable fuels, the Generating Facility must use technology the California Public Utilities Commission (“Commission”) determines will achieve reductions in emissions of greenhouse gases and meet emissions requirements for eligibility for funding pursuant to the Self-Generation Incentive Programs.
Generating Facility Location. 2.5.1 This agreement is applicable only to the Generating Facility described below and installed at the above location. The Generating Facility may not be relocated or connected to SCE’s system at any other location without SCE’s express written permission. 2.5.2 This agreement is applicable only to solar and/or wind Generating Facilities, or a hybrid system of both with an aggregate capacity of 10 kW or less that is located on Customer’s premises as defined in SCE’s Electric Rule 1 Definitions and operates in parallel with SCE’s Distribution System
Generating Facility Location. 2.5.1 This agreement is applicable only to the Generating Facility described below and installed at the above location. The Generating Facility may not be relocated or connected to AEC’s system at any other location without AEC’s express written permission. 2.5.2 This agreement is applicable only to solar and/or wind Generating Facilities, or a hybrid system of both with an aggregate capacity of 1 megawatt (MW) or less that is located on Member’s premises as defined in AEC’s By-laws and Board Policies, as amended from time-to-time, and operates in parallel with AEC’s Distribution System.
Generating Facility Location. 2.5.1 This agreement is applicable only to the Generating Facility described below and installed at the above location. The Generating Facility may not be relocated or connected to SCE’s system at any other location without SCE’s express written permission. 2.5.2 This Agreement is applicable only to Renewable Electrical Generating Facilities, which includes biomass, solar thermal, photovoltaic, wind, geothermal, fuel cells (using renewable fuel), small hydroelectric generation, digester gas, municipal solid waste conversion, landfill gas, ocean wave, ocean thermal, or tidal current, and any additions or enhancements using such technology. 2.5.3 Renewable Electrical Generating Facilities using fuel cells, municipal solid waste conversion, and small hydroelectric generating will be required to sign an Affidavit (Form 14-912) certifying the following criteria have been met: a) For purposes of this Agreement, qualifying “solid waste conversion” is defined pursuant to Public Resources Code Section 25741(b)(3). b) For purposes of qualifying under “fuel cell” using renewable fuels, the Generating Facility must use technology the California Public Utilities Commission (“Commission”) determines will achieve reductions in emissions of greenhouse gases and meet emissions requirements for eligibility for funding pursuant to the Self-Generation Incentive Programs.

Related to Generating Facility Location

  • Generating Facility The Interconnection Customer’s device for the production of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer’s Interconnection Facilities.

  • Project Location [Insert the location of the Project, if applicable]

  • Parking Facilities Alamo Colleges District shall make the existing parking facilities at the rented Facility available for the vehicular traffic and parking necessitated by the Organization’s Use of the rented Facility, on a non-exclusive basis, as specified at Exhibit A. MAXIMUM CAPACITY. Organization anticipates approximately the number of participants stated at Exhibit A and agrees to inform Alamo Colleges District of any significant changes five (5) business days in advance of a Use. Organization shall not admit a larger number of persons than can safely and freely move about the Facility. Alamo Colleges District shall notify Organization of the recommended capacity of the Facility and all decisions of Alamo Colleges District concerning questions arising under this Paragraph shall be final.

  • Working Facilities During the Term of Employment, the Company shall furnish the Executive with an office, secretarial help and such other facilities and services suitable to his position and adequate for the performance of his duties hereunder.

  • Interconnection Facilities 4.1.1 The Interconnection Customer shall pay for the cost of the Interconnection Facilities itemized in Attachment 2 of this Agreement. The NYISO, in consultation with the Connecting Transmission Owner, shall provide a best estimate cost, including overheads, for the purchase and construction of its Interconnection Facilities and provide a detailed itemization of such costs. Costs associated with Interconnection Facilities may be shared with other entities that may benefit from such facilities by agreement of the Interconnection Customer, such other entities, the NYISO, and the Connecting Transmission Owner. 4.1.2 The Interconnection Customer shall be responsible for its share of all reasonable expenses, including overheads, associated with (1) owning, operating, maintaining, repairing, and replacing its own Interconnection Facilities, and

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.

  • Equipment Location The Company recognizes that it is important when designing, constructing, and maintaining physical plant components, to have regard for the specific placement of equipment, with a view to the elimination of hazardous work situations. Accordingly, wherever practical to do so, new installations, or the rebuild of existing installations, will be designed accordingly.

  • Office Space, Equipment and Facilities Provide such office space, office equipment and office facilities as are adequate to fulfill the Adviser’s obligations hereunder.

  • Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including without limitation those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.

  • Program Location A. Unless otherwise agreed upon in writing, the parties acknowledge and agree that the Work of this Agreement will be performed at the following Property address: Ktr Address1 Address2