GLC Supplementary Payments Sample Clauses

GLC Supplementary Payments. GLC Supplementary Payments will be included as part of the ‘workers total salary’ and will not be paid separately.
AutoNDA by SimpleDocs

Related to GLC Supplementary Payments

  • SUPPLEMENTARY PAYMENTS These Supplementary Payments are subject to the terms of the Principal Coverages and they do not increase the limit of liability stated for the principal coverages except: Claims and Defense Expense Coverage.

  • Payment of Supplementary Xxxx 10.7.1 SPD may raise a ("Supplementary Xxxx") for payment on account of:

  • Supplementary Labour (a) If the Employer wishes to engage supplementary labour to perform work performed by its Employees under this Agreement, the Employer must first consult in good faith with the affected Employees.

  • SUPPLEMENTARY PREAMBLES For preambles see "Specifications of materials and methods to be used - PW 371" GLAZING TO STEEL WITH PUTTY 4mm Obscure safety glass: 1 Panes not exceeding 0,1 m2 m2 3 Carried Forward to Summary of Section No. 3 R Section No. 3 SMD1 Bill No. 11 GLAZING BVI CONSULTING ENGINEERS Amount Item No SECTION 3 Quantity Rate Amount BILL NO. 12 PAINTWORK SUPPLEMENTARY PREAMBLES For preambles see "Specifications of materials and methods to be used - PW 371" ON FIBRE-CEMENT Prepare and brush to remove all loose contaminations, apply one coat primer and two coats PVA emulsion paint: 1 On fascias and barge boards m2 6 ON WOOD Undercoat and minimum 2 coat gloss enamel: 2 On doors (Internal) m2 3 3 On doors (External) m2 7 ON METAL Undercoat and minimum 2 coat gloss enamel: 4 On door frames m2 1 5 On gates (Measured over the full flat area of both sides) m2 8 6 On gutters and down pipes m 10 Spot prining defects in prime surface with zinc chromate primer and apply one universal undercoat and two coats EPWP, golden brown gloss enamel paint on steel: 7 On windows with burglar bars m2 3 Carried Forward to Summary of Section No. 3 Section No. 3 SMD1 Bill No. 12 PAINTWORK BVI CONSULTING ENGINEERS R SECTION SUMMARY - SMD1 Bill No Page No 1 EARTHWORKS 61 2 CONCRETE,FORMWORK AND REINFORCEMENT 63 3 MASONRY 66 4 WATERPROOFING 67 5 ROOF COVERINGS 69 6 CARPENTRY AND JOINERY 71 7 IRONMONGERY 73 8 METALWORK 74 9 PLASTERING 75 10 PLUMBING AND DRAINAGE 78 11 GLAZING 79 12 PAINTWORK 80 Carried to Final Summary Section No. 3 SMD1 BVI CONSULTING ENGINEERS Amount R Item No SECTION 4 Quantity Rate Amount BILL NO.1 EARTHWORKS (PROVISIONAL) SUPPLEMENTARY PREAMBLES For preambles see "Specifications of materials and methods to be used - PW 371" SITE CLEARANCE 1 Digging up and removing rubbish, debris, vegetation, xxxxxx, shrubs,xxxx and trees not exceeding 200mm girth, etc. m2 73 2 Stripping average 100mm thick layer of top soil and stockpiling on site m2 73 EXCAVATION,FILLING, ETC Excavation in earth not exceeding 2m deep: 3 Trenches m3 18 4 Pit m3 27 5 For aprons thickenning m3 4 Extra over trench and hole excavations in earth for excavation: 6 Soft rock m3 49 7 Hard rock m3 49 Extra over all excavations for carting away: 8 Surplus material from excavations and/or stock piles on site to a dumping site to be alocated by the Contractor m3 35 Carried Forward Section No. 4 MD3 Bill No. 1 EARTHWORKS BVI CONSULTING ENGINEERS R Brought Forward R Risk of collapse of excavations: 9 Sides of trench and hole excavation not exceeding 1,5m deep. m2 82 Keeping excavations free of water: 10 Keeping excavations free of water other than subterranean water Item Earth filling obtained from the excavations and/or prescribed stock piles on site compacted to 93% ModAASHTO density: 11 Under floors, steps, pavings, etc. m3 7 12 Backfilling to trenches, holes, etc. m3 9 Compaction of surfaces: 13 Compaction of ground surface under floors etc including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 93% Mod AASHTO density m2 25 14 Compaction of ground surface to pits etc including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 93% Mod AASHTO density m2 20 15 Compaction of ground surface to aprons etc including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 93% Mod AASHTO density m2 44 Prescribed density tests on filling: 16 Modified AASHTO Density tests No 5 SOIL POISONING Carried Forward R Section No. 4 MD3 Bill No. 1 EARTHWORKS BVI CONSULTING ENGINEERS Brought Forward R Soil insecticide: 17 Under floors etc including forming and poisoning shallow furrows against foundation walls etc, filling in furrows and ramming. m2 25 18 To bottom of concrate aprons m2 44 19 To bottoms and sides of trenches, etc. m2 69 Carried Forward to Summary of Section No. 4 R Section No. 4 MD3 Bill No. 1 EARTHWORKS BVI CONSULTING ENGINEERS R Amount

  • Issue of supplementary card We may issue a supplementary card to a person nominated by the basic cardmember and approved by us as a supplementary cardmember, in which event this clause 11, in addition and without prejudice to the other terms and conditions of this agreement, applies. The basic cardmember acknowledges that we may, in our discretion, allow the supplementary cardmember to activate the digital version of his/her supplementary card, prior to receipt of the physical version of such supplementary card. The digital version of the supplementary card (comprising of the digital card credentials), may be used by the supplementary cardmember to perform transactions on the relevant supplementary card. In such event, both basic and supplementary cardholder will be liable for the transactions performed using the digital version of the supplementary card in accordance with this clause.

  • Supplementary Provisions 15.1 This Agreement is executed in two original copies and each Party shall keep one.

  • Supplementary Card a card which is issued by the Bank to the client and/or other person nominated by the client and which is linked to the existing card account of the client;

  • Supplementary Vacation The supplementary vacations as set out below are to be banked on the outlined supplementary vacation employment anniversary date and taken at the employee’s option at any time subsequent to the current supplementary vacation employment anniversary date but prior to the next supplementary vacation employment anniversary date.

  • Termination of use of supplementary card The basic cardmember is entitled at any time to terminate the use of any supplementary card, and the supplementary cardmember may terminate the use of his supplementary card, at any time in accordance with clause

  • SUPPLEMENTARY INDEX Exhibit A-Local Church Vote Certification Exhibit B-Bill of Sale Exhibit C-Deed(s) Exhibit D-FIRPTA Schedule 3.2-Other Liabilities Schedule 3.4-Financial Statements Schedule 4.3-Subsidiaries Schedule 4.7-Leases & Land Schedule 4.8-Personal Property EXHIBIT A Local Church Certification EXHIBIT B Bill of Sale [Form]

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!