GRANULAR MATERIAL Sample Clauses

GRANULAR MATERIAL. Crushed stone or crushed gravel indicating a loss of not more than 15% after five cycles when tested for soundness with sodium sulfate as described in ASTM C88. 1. Material shall be ‘Type 1 Bedding Material’ in accordance with section 801.2 of the City of Wichita Standard Specifications for the Construction of Public Projects. 2. Material shall be crushed rock conforming to ASTM C-33, Gradation No. 67, and will meet all requirements for Portland Cement Concrete Pavement Coarse Aggregate, section 406.2, City of Wichita Standard Specifications for the Construction of Public Projects. 3. Material shall be sourced from an approved supplier in accordance with Section 801 ‘Trench Excavation, Backfilling, and Compaction’ of the City of Wichita, KS Standard Specifications for the Construction of Public Projects. 4. Use at all locations where granular material is required unless otherwise indicated or specified. 5. Use as Pipe Bedding Material except as noted in Paragraph 2.03.B. Pipe Bedding Material for exterior coated steel pipe 1. Material shall be ‘Sand’ in accordance with section 801.2 of the City of Wichita, KS Standard Specifications for the Construction of Public Projects. 2. Material shall be clean washed sand with one-hundred percent (100%) passing the ¾” sieve, not more than twenty-five percent (25%) retained on a No. 4 sieve and not more than ten percent (10%) passing the No. 200 sieve. Low Volume Change (LVC) Material 1. Materials shall be free of organic matter and deleterious debris and have a maximum particle size of 1.5 inches. LVC materials are classified as materials having a plasticity index between 5 and 15, as defined by ASTM D-2487. 2. Cohesionless soils, free of organic matter and deleterious debris and have a maximum particle size of 1.5 inches which have been classified as non-plastic, may be used provided they can be placed in a manner such that the material is confined on all sides during placement and compaction.
AutoNDA by SimpleDocs
GRANULAR MATERIAL. A. Granular material shall be defined as soil having a minimum sand equivalent of 30 as determined in accordance with State of California, Division of Highways, Test "California 217," with not more than 20% passing a 200-mesh sieve.
GRANULAR MATERIAL. A. Granular material, where required for trench backfill, shall be sand, river sand, crushed stone or aggregate, pond screenings, crusher run, recycled concrete, or other angular material. Granular material shall meet gradation requirements for Size No. 57 or finer.

Related to GRANULAR MATERIAL

  • Operator Materials Operator retains all right, title and interest in and to any and all of Operator’s software, materials, tools, forms, documentation, training and implementation materials and intellectual property (“Operator Materials”). Operator grants to the LEA a personal, nonexclusive license to use the Operator Materials for its own non-commercial, incidental use as set forth in the Service Agreement. Operator represents that it has all intellectual property rights necessary to enter into and perform its obligations in this DPA and the Service Agreement, warrants to the District that the District will have use of any intellectual property contemplated by the Service Agreement free and clear of claims of any nature by any third Party including, without limitation, copyright or patent infringement claims, and agrees to indemnify the District for any related claims.

  • Biological Samples If so specified in the Protocol, Institution and Principal Investigator may collect and provide to Sponsor or its designee Biological Samples (“Biological Samples”). 12.2.

  • Dangerous Goods, Special Wastes, Pesticides and Harmful Substances Where employees are required to work with or are exposed to any dangerous good, special waste, pesticide or harmful substance, the Employer shall ensure that the employees are adequately trained in the identification, safe handling, use, storage, and/or disposal of same.

  • Other Material Species or products not listed in A2, upon written approval of Contracting Officer under B3.41. B2.2 Utilization and Removal of Included Timber. “Utilization Standards” for trees and minimum pieces are stated in A2. To meet minimum tree specifications, trees must equal or exceed tree diameters listed in A2 and con- tain at least one minimum piece. Except for timber re- quired or authorized to be left, Purchaser shall fell and buck such trees and shall remove from Sale Area and present for Scaling all pieces that:

  • Customer Materials 12.1 The Supplier including any of its employees, agents, consultants, contractors and any third party shall:

  • Storage of Materials Borrower shall cause all materials supplied for or intended to be utilized in the construction of the Improvements but not affixed to or incorporated into the Property to be stored on the Property or at such other location as may be approved by Lender in writing, with adequate safeguards to prevent loss, theft, damage or commingling with other materials not intended to be utilized in the construction of the Improvements.

  • RE-WEIGHING PRODUCT Deliveries are subject to re- weighing at the point of destination by the Authorized User. If shrinkage occurs which exceeds that normally allowable in the trade, the Authorized User shall have the option to require delivery of the difference in quantity or to reduce the payment accordingly. Such option shall be exercised in writing by the Authorized User.

  • Meteorological Data Reporting Requirement (Applicable to wind generation facilities only) The wind generation facility shall, at a minimum, be required to provide the Transmission Provider with site-specific meteorological data including: • Temperature (degrees Fahrenheit) • Wind speed (meters/second) • Wind direction (degrees from True North) • Atmosphere pressure (hectopascals) • Forced outage data (wind turbine and MW unavailability)

  • Geological and Archeological Specimens If, during the execution of the Work, the Contractor, any Subcontractor, or any servant, employee, or agent of either should uncover any valuable material or materials, such as, but not limited to, treasure trove, geological specimens, archival material, archeological specimens, or ore, the Contractor acknowledges that title to the foregoing is vested in the Owner. The Contractor shall notify the Owner upon the discovery of any of the foregoing, shall take reasonable steps to safeguard it, and seek further instruction from the Design Professional. Any additional cost incurred by the Contractor shall be addressed under the provision for changed conditions. The Contractor agrees that the Geological and Water Resources Division and the Historic Preservation Division of the Georgia Department of Natural Resources may inspect the Work at reasonable times.

  • Standard Samples Bid Specifications may indicate that the Product to be purchased must be equal to a standard sample on display in a place designated by the Commissioner and such sample will be made available to the Bidder for examination prior to the opening date. Failure by the Bidder to examine such sample shall not entitle the Bidder to any relief from the conditions imposed by the Bid Specifications.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!