Trench excavation definition

Trench excavation means excavating from ground level not exceeding 5000 mm in width at surface.
Trench excavation means excavation of trenches in all material of whatever nature encountered into which pipes, ducts or cables are to be laid and appurtenances constructed to levels and limits specified on the Drawings or otherwise.
Trench excavation means excavation, to levels and limits specified on the drawings or otherwise, of trenches into which pipes and the like are to be laid.

Examples of Trench excavation in a sentence

  • Trench excavation for short runs of conduit placement (up to 100 feet ±) and duct repair are examples of ROW Permit worthy construction activities.

  • Trench excavation will begin only when all known utilities are verified.

  • Trench excavation is classified as either common or rock excavation.

  • Trench excavation excludes all material defined as Rock Excavation and Unsuitable Soil.

  • Trench excavation to be in accordance with SABS 1200 - risk of collapse, dealing wilh ground water, seepage and keeping the excavation free from water, backfilling, working space.

  • Trench excavation shall be accomplished by hand digging, mechanical trencher, or backhoe at the discretion of the Builder depending on locations of nearby existing utilities or obstructions.

  • Trench excavation shall either be at the ditch bottom or outside ditch area.

  • Trench excavation Limits The work of trench excavation should be commensurate with laying and jointing of the pipe line.

  • Trench excavation does not include earthwork covered under any other section, or any earthwork that may be specifically included and provided for other pay items of the Contract.

  • Trench excavation means excavation in all materials of whatever nature encountered for trenches into which pipes and ducts etc.


More Definitions of Trench excavation

Trench excavation means excavation of trenches in all material of
Trench excavation means excavation (ouside buildings / structures) of trenches into which pipes (of all types and sizes upto 2000mm) and cables are to be laid to levels and limits as required as per approved drawings or otherwise. This shall also include miscellaneous isolated lengths of trenches beneath or adjacent to other structures.