Grounding System. i) All ground connections shall be checked and the entire system shall be checked for continuity. The resistance of the ground system at each site shall be measured using a 3-point fall-of-potential method. The maximum ground resistance shall be three ohms. ii) Ground tests shall meet the requirements of the California Electric Code, Article 250. iii) All PV system grounding shall meet the requirements of CEC Article 690.
Appears in 4 contracts
Samples: Design Build Agreement, Design Build Agreement, Design Build Agreement