Surveys Each Borrower shall submit the Ship owned by it regularly to all periodical or other surveys which may be required for classification purposes and, if so required by the Security Trustee provide the Security Trustee, with copies of all survey reports.
Topographic Survey The Professional shall obtain a topographic and utility survey as described below. 4.1.1. The Professional shall tie in all existing surface topographic features and structures within the survey limits shown in Figure 1. This survey shall include: tops of curbs, edges of pavement, pavement materials, driveways, sidewalks, retaining walls, drainage structures (top, edges and flow line), channels and drainage ways (tops, toes and flow line), manholes (rim, flow lines and diameters of pipes, type of material and photographs of the inside of manholes and drainage structures), including the same survey data for upstream and downstream manholes and structures that are outside of the survey limits for all gravity wastewater and drainage lines within the survey limits. Visible valves, meters, clean-outs, slabs, utility signs, utility poles and structures, fences, landscaping features, shrubbery, trees (including the approximate drip-line), tree canopies, buildings (edges within the survey limits) mailboxes, etc. Trees shall be tagged and tabulated by size and species specific in compliance with the City of New Braunfels Tree Preservation ordinance as defined in the City of New Braunfels Zoning Ordinance Chapter 5.3- 5i. The survey limits shall extend approximately 100 feet on intersecting streets. The Professional shall provide sufficient ground shots to create one (1) foot contours for the Project. 4.1.2. The Professional shall conduct a utility survey and locate existing utilities within the Project boundary in Figure 1. The Professional shall contact all utility service providers by calling Texas 811 and the NBU Project Manager to coordinate flagging of existing franchise utilities. The Professional shall request drawings of existing agency and municipal owned utilities and shall include locations of these utilities in the survey. The Professional shall tie in the locations of the discovered utilities on the survey. The Professional shall bear all costs for the Services associated with utility locates. 4.1.3. The Professional shall locate up to ten (10) geotechnical borings and tie them in to the Project survey. 4.1.4. The Professional shall set and install control points and/or benchmarks as required for the survey work (minimum 1-foot intervals). The Professional shall provide horizontal and vertical coordinates of the benchmarks in the required coordinate system and datum and show the benchmarks on the survey drawing. 4.1.5. The Professional shall research and review adjoining plats and deeds along the survey corridor. The Professional shall locate property corners and identify existing right of way (“ROW”), along the survey corridor, based on found monuments and record documents.
EU SURVEY 5.1. The participant shall complete and submit the online EU Survey after the mobility abroad within 30 calendar days upon receipt of the invitation to complete it.
Survey Buyer may obtain a survey of the Property before the Closing to assure that there are no defects, encroachments, overlaps, boundary line or acreage disputes, or other such matters, that would be disclosed by a survey ("Survey Problems"). The cost of the survey shall be paid by the Buyer. Not later than business days prior to the Closing, Buyer shall notify Seller of any Survey Problems which shall be deemed to be a defect in the title to the Property. Seller shall be required to remedy such defects within If Seller does not or cannot remedy any such defect(s), Buyer shall have the option of canceling this Agreement, in which case the Xxxxxxx Money shall be returned to Buyer.
Title Insurance and Surveys Due to the critical timeline requirements to close the transaction, PHI may order title searches on all PH Owned Real Property and PH Leased Real Property to be transferred to NPC pursuant to this Agreement. These title searches will be performed by a national title company approved by PHI. If PHI has established relations with such company, NPC will be entitled to the benefit of PHI’s preferred rates. If permissible under applicable law and the terms of any agreement with such company, the fees paid for the searches may be applied toward the title policy costs for title policies desired by NPC based upon these title searches In the event NPC or NPC’s lender requires environmental reports relating to the PH Owned Real Property, NPC shall first obtain PHI’s prior written consent and shall execute the Access and Confidentiality Agreement substantially in the form attached hereto as Exhibit “E”, and shall retain a nationally recognized firm approved by PHI to perform such work. PH will not consent to any invasive environmental audit or review and the results of any permitted environmental audit or review will not affect NPC’s obligations hereunder. To the extent that NPC or NPC’s lender requires surveys of the Owned Real Property, NPC shall retain a nationally recognized firm approved by PHI to perform such work. The consultants referenced in this Section 1.7 will be retained solely by NPC, but PH shall have the right to obtain copies of any documents or reports that they prepare. As provided for in Sections 5 and 10.9, NPC shall reimburse PH at Closing (or at such other time as contemplated by those provisions) for all actual or estimated costs incurred by PH in obtaining title insurance, surveys and/or environmental reports on behalf of NPC. Notwithstanding the foregoing however, NPC will not be responsible for the payment or reimbursement of any costs relating to title insurance, surveys and/or environmental reports on any of the subject real estate unless such service is specifically requested by NPC, and request is given forty-five (45) days prior to the Closing.
Environmental Reports Lender shall have received an environmental report in respect of the Property, in each case reasonably satisfactory to Lender.
Title Reports With respect to each Closing Date Mortgaged Property listed in Part B of Schedule 4.1N annexed hereto, a title report issued by the Title Company with respect thereto, dated not more than 30 days prior to the Closing Date and satisfactory in form and substance to Administrative Agent;
Environmental Hazards Each Party will be solely responsible at its own expense for the proper handling, storage, transport, treatment, disposal and use of all Hazardous Substances by such Party and its contractors and agents. “Hazardous Substances” includes those substances (i) included within the definition of hazardous substance, hazardous waste, hazardous material, toxic substance, solid waste or pollutant or contaminant under any Applicable Law and (ii) listed by any governmental agency as a hazardous substance.
Due Diligence Examination At any time during the Review Period, and thereafter through Closing of the Property, Buyer and/or its representatives and agents shall have the right to enter upon the Property at all reasonable times for the purposes of reviewing all Records and other data, documents and/or information relating to the Property and conducting such surveys, appraisals, engineering tests, soil tests (including, without limitation, Phase I and Phase II environmental site assessments), inspections of construction and other inspections and other studies as Buyer deems reasonable and necessary or appropriate to evaluate the Property, subject to providing reasonable advance notice to Seller unless otherwise agreed to by Buyer and Seller (the “Due Diligence Examination”). Seller shall have the right to have its representative present during Buyer’s physical inspections of its Property, provided that failure of Seller to do so shall not prevent Buyer from exercising its due diligence, review and inspection rights hereunder. Buyer agrees to exercise reasonable care when visiting the Property, in a manner which shall not materially adversely affect the operation of the Property.
The Site The site of the Project Highway (the “Site”) shall comprise the site described in Schedule-A in respect of which the Right of Way shall be provided by the Authority to the Contractor. The Authority shall be responsible for: (a) acquiring and providing Right of Way on the Site in accordance with the alignment finalised by the Authority, free from all encroachments and encumbrances, and free access thereto for the execution of this Agreement; and (b) obtaining licences and permits for environment clearance for the Project Highway.