Heating and Hot Water Systems. Heating and hot water shall be provided and shall meet the following standards: 3.9.1 there shall be either a full gas central heating and hot water system which is preferred, or Electric Economy Seven night storage heating which is less than five years old. Older accommodation must be brought to GLA's attention pre Completion and GLA reserves the right to decline to provide grant funding in respect of the proposed acquisition if it has concerns over the efficacy or cost efficiency of the heating systems; 3.9.2 if water heating is by electricity it shall be of reasonable capacity and have an on and off peak tariff; 3.9.3 the heating shall be sufficient to maintain an internal room temperature of 21 degrees Celsius in the living room and 18 degrees Celsius in the bedrooms, bathroom, kitchen and hallway when the outside temperature is minus 1 degree Celsius; 3.9.4 boilers shall be less than ten years old. Older accommodation must be brought to GLA's attention pre Completion and GLA reserves the right to decline to provide grant funding in respect of the proposed acquisition if it has concerns over the efficacy or cost efficiency of the heating systems; 3.9.5 all pipework to the boiler should be boxed in appropriate to its location; 3.9.6 all gas heating systems shall have a three star British Gas Service Agreement or equivalent; 3.9.7 all heating systems shall have a timer and thermostat. For studios and bedsits fixed storage heaters are preferred where there is no gas supply. Electric heaters must be wall mounted; 3.9.8 all hot water systems shall be able to operate independently from the heating system; 3.9.9 details for the location of the on/off switch shall be noted and provided to Tenants; 3.9.10 the Grant Recipient shall provide a gas safety certificate and copy of the annual Gas Safe service agreement every year. A copy of the safety certificate shall be given to the Tenant; The report should not have any items requiring attention; 3.9.11 accommodation with boilers fitted in bedrooms shall not normally be accepted. Any proposed RSAP Dwelling which has a boiler in a bedroom must be brought to GLA's attention pre Completion and GLA reserves the right to decline to provide grant funding in respect of the proposed acquisition if it has concerns over the location of the boiler; 3.9.12 operating instructions for heating/hot water system shall be provided to tenants; 3.9.13 external and internal cold water storage cisterns, tanks etc. to be properly housed, insulated and protected; 3.9.14 plumbing must comply with the current water authority Bye-Laws. Stop valves must be clearly labelled especially when situated in common areas; 3.9.15 electric key / Gas card meters: If electric key or gas card meters are installed, upon completion the properties must have £10 credit in summer or £15 credit in winter. Key cards should be left in the property.
Appears in 3 contracts
Samples: Capital Grant Agreement, Capital Grant Agreement, Capital Grant Agreement
Heating and Hot Water Systems. Heating and hot water shall be provided and shall meet the following standards:
3.9.1 there shall be either a full gas central heating and hot water system which is preferred, or Electric Economy Seven night storage heating which is less than five 5 years old. Older accommodation must be brought to GLA's attention pre Completion and GLA reserves the right to decline to provide grant funding in respect of the proposed acquisition if it has concerns over the efficacy or cost efficiency of the heating systems;
3.9.2 if water heating is by electricity it shall be of reasonable capacity and have an on and off peak tariff;
3.9.3 the heating shall be sufficient to maintain an internal room temperature of 21 degrees Celsius in the living room and 18 degrees Celsius in the bedrooms, bathroom, kitchen and hallway when the outside temperature is minus 1 degree Celsius;
3.9.4 boilers shall be less than ten 10 years old. Older , older accommodation must be brought to GLA's attention pre Completion and GLA reserves the right to decline to provide grant funding in respect of the proposed acquisition if it has concerns over the efficacy or cost efficiency of the heating systems;
3.9.5 all pipework to the boiler should be boxed in appropriate to its location;
3.9.6 all gas heating systems shall have a three 3 star British Gas Service Agreement or equivalent;
3.9.7 all heating systems shall have a timer and thermostat. For studios and bedsits fixed storage heaters are preferred where there is no gas supply. Electric heaters must be wall mounted;
3.9.8 all hot water systems shall be able to operate independently from the heating system;
3.9.9 details for the location of the on/off switch shall be noted and provided to Tenants;
3.9.10 the Grant Recipient shall provide a gas safety certificate and copy of the annual Gas Safe service agreement every year. A copy of the safety certificate shall be given to the Tenant; The report should not have any items requiring attention;
3.9.11 accommodation with boilers fitted in bedrooms shall not normally be accepted. Any proposed RSAP Dwelling which has a boiler in a bedroom must be brought to GLA's attention pre Completion and GLA reserves the right to decline to provide grant funding in respect of the proposed acquisition if it has concerns over the location of the boiler;
3.9.12 operating instructions for heating/hot water system shall be provided to tenants;
3.9.13 external and internal cold water storage cisterns, tanks etc. to be properly housed, insulated and protected;
3.9.14 plumbing must comply with the current water authority Bye-Laws. Stop valves must be clearly labelled especially when situated in common areas;
3.9.15 electric key / Gas card meters: If electric key or gas card meters are installed, upon completion the properties must have £10 credit in summer or £15 credit in winter. Key cards should be left in the property.
Appears in 2 contracts
Samples: Revenue Funding Agreement, Revenue Funding Agreement
Heating and Hot Water Systems. Heating and hot water shall be provided and shall meet the following standards:
3.9.1 there shall be either a full gas central heating and hot water system which is preferred, or Electric Economy Seven night storage heating which is less than five 5 years old. Older accommodation must be brought to GLA's attention pre Completion and GLA reserves the right to decline to provide grant funding in respect of the proposed acquisition if it has concerns over the efficacy or cost efficiency of the heating systems;
3.9.2 if water heating is by electricity it shall be of reasonable capacity and have an on and off peak tariff;
3.9.3 the heating shall be sufficient to maintain an internal room temperature of 21 degrees Celsius in the living room and 18 degrees Celsius in the bedrooms, bathroom, kitchen and hallway when the outside temperature is minus 1 degree Celsius;
3.9.4 boilers shall be less than ten 10 years old. , Older accommodation must be brought to GLA's attention pre Completion and GLA reserves the right to decline to provide grant funding in respect of the proposed acquisition if it has concerns over the efficacy or cost efficiency of the heating systems;
3.9.5 all pipework to the boiler should be boxed in appropriate to its location;
3.9.6 all gas heating systems shall have a three 3 star British Gas Service Agreement or equivalent;
3.9.7 all heating systems shall have a timer and thermostat. For studios and bedsits fixed storage heaters are preferred where there is no gas supply. Electric heaters must be wall mounted;
3.9.8 all hot water systems shall be able to operate independently from the heating system;
3.9.9 details for the location of the on/off switch shall be noted and provided to Tenants;
3.9.10 the Grant Recipient shall provide a gas safety certificate and copy of the annual Gas Safe service agreement every year. A copy of the safety certificate shall be given to the Tenant; The report should not have any items requiring attention;
3.9.11 accommodation with boilers fitted in bedrooms shall not normally be accepted. Any proposed RSAP Dwelling which has a boiler in a bedroom must be brought to GLA's attention pre Completion and GLA reserves the right to decline to provide grant funding in respect of the proposed acquisition if it has concerns over the location of the boiler;
3.9.12 operating instructions for heating/hot water system shall be provided to tenants;
3.9.13 external and internal cold water storage cisterns, tanks etc. to be properly housed, insulated and protected;
3.9.14 plumbing must comply with the current water authority Bye-Laws. Stop valves must be clearly labelled especially when situated in common areas;
3.9.15 electric key / Gas card meters: If electric key or gas card meters are installed, upon completion the properties must have £10 credit in summer or £15 credit in winter. Key cards should be left in the property.
Appears in 1 contract
Samples: Capital Grant Agreement
Heating and Hot Water Systems. 3.9.1 Heating and hot water shall be provided and shall meet the following standards:
3.9.1 there (a) There shall be either a full gas central heating and hot water system which is preferred, or Electric Economy Seven night storage heating which is less than five 5 years old. Older accommodation must , older Accommodation to be brought to GLA's attention pre Completion and GLA reserves agreed at the right to decline to provide grant funding in respect absolute discretion of the proposed acquisition if it has concerns over the efficacy or cost efficiency of the heating systems;Council.
3.9.2 if (b) If water heating is by electricity it shall be of reasonable capacity and have an on and off peak tariff;.
3.9.3 the (c) The heating shall be sufficient to maintain an internal room temperature of 21 degrees Celsius in the living room and 18 degrees Celsius in the bedrooms, bathroom, kitchen and hallway when the outside temperature is minus 1 degree Celsius;,
3.9.4 boilers (d) Boilers shall be less than ten 10 years old. Older accommodation must , older Accommodation to be brought to GLA's attention pre Completion and GLA reserves agreed at the right to decline to provide grant funding in respect absolute discretion of the proposed acquisition if it has concerns over the efficacy or cost efficiency of the heating systems;Contract Manager.
3.9.5 all (e) All pipework to the boiler should be boxed in appropriate to its location;.
3.9.6 all (f) All gas heating systems shall have a three 3 star British Gas Service Agreement or equivalent;,
3.9.7 all (g) All heating systems shall have a timer and thermostat. For studios and bedsits fixed storage heaters are preferred where there is no gas supply. Electric heaters must be wall mounted;,
3.9.8 all (h) All hot water systems shall be able to operate independently from the heating system;,
3.9.9 details (i) Details for the location of the on/off switch shall be noted and provided to Tenants;Service Users,
3.9.10 the Grant Recipient (j) Landlords shall provide a gas safety certificate and copy of the annual Gas Safe service agreement every year. A copy of the safety certificate shall be given to the TenantService User; The report should not have any items requiring attention;.
3.9.11 accommodation (k) Accommodation with boilers fitted in bedrooms shall not normally be accepted. Any proposed RSAP Dwelling which has The Contract Manager may consent in his absolute discretion to a boiler being located in a bedroom must bedroom, such consent shall be brought to GLA's attention pre Completion and GLA reserves the right to decline to provide grant funding sought in respect advance of the proposed acquisition if it has concerns over Accommodation being offered to the location of the boiler;Council for letting
3.9.12 operating (l) Operating instructions for heating/hot water system shall be provided to tenants;Tenants.
3.9.13 external (m) External and internal cold water storage cisterns, tanks etc. etc to be properly housed, insulated and protected;.
3.9.14 plumbing (n) Plumbing must comply with the current water authority Bye-Laws. Stop valves must be clearly labelled especially when situated in common areas;
3.9.15 electric key / Gas card meters: If electric key or gas card meters are installed, upon completion the properties must have £10 credit in summer or £15 credit in winter. Key cards should be left in the property.
Appears in 1 contract
Samples: Service Level Agreement
Heating and Hot Water Systems. Heating and hot water shall be provided and shall meet the following standards:
3.9.1 there shall be either a full gas central heating and hot water system which is preferred, or Electric Economy Seven night storage heating which is less than five 5 years old. Older accommodation must be brought to GLA's attention pre Completion and GLA reserves the right to decline to provide grant funding in respect of the proposed acquisition if it has concerns over the efficacy or cost efficiency of the heating systems;
3.9.2 if water heating is by electricity it shall be of reasonable capacity and have an on and off peak tariff;
3.9.3 the heating shall be sufficient to maintain an internal room temperature of 21 degrees Celsius in the living room and 18 degrees Celsius in the bedrooms, bathroom, kitchen and hallway when the outside temperature is minus 1 degree Celsius;
3.9.4 boilers shall be less than ten 10 years old. Older accommodation must be brought to GLA's attention pre Completion and GLA reserves the right to decline to provide grant funding in respect of the proposed acquisition if it has concerns over the efficacy or cost efficiency of the heating systems;
3.9.5 all pipework to the boiler should be boxed in appropriate to its location;
3.9.6 all gas heating systems shall have a three 3 star British Gas Service Agreement or equivalent;
3.9.7 all heating systems shall have a timer and thermostat. For studios and bedsits fixed storage heaters are preferred where there is no gas supply. Electric heaters must be wall mounted;
3.9.8 all hot water systems shall be able to operate independently from the heating system;
3.9.9 details for the location of the on/off switch shall be noted and provided to Tenants;
3.9.10 the Grant Recipient shall provide a gas safety certificate and copy of the annual Gas Safe service agreement every year. A copy of the safety certificate shall be given to the Tenant; The report should not have any items requiring attention;
3.9.11 accommodation with boilers fitted in bedrooms shall not normally be accepted. Any proposed RSAP Dwelling which has a boiler in a bedroom must be brought to GLA's attention pre Completion and GLA reserves the right to decline to provide grant funding in respect of the proposed acquisition if it has concerns over the location of the boiler;
3.9.12 operating instructions for heating/hot water system shall be provided to tenants;
3.9.13 external and internal cold water storage cisterns, tanks etc. to be properly housed, insulated and protected;
3.9.14 plumbing must comply with the current water authority Bye-Laws. Stop valves must be clearly labelled especially when situated in common areas;
3.9.15 electric key / Gas card meters: If electric key or gas card meters are installed, upon completion the properties must have £10 credit in summer or £15 credit in winter. Key cards should be left in the property.
Appears in 1 contract
Samples: Capital Grant Agreement