Heavy Pavement/Undulation Crew Sample Clauses

Heavy Pavement/Undulation Crew. Parking Meter Collector (Applies to SB1, SC1, and SD1 only) For each unit member assigned for at least six (6) consecutive months to either Parking Meter Collector, the Heavy Pavement Crew or the Undulation Crew, the City shall provide a voucher from the City designated department for up to three hundred dollars ($300) annually toward the cost of acquiring two (2) pairs of safety shoes and related shoe supplies. The City shall provide the vouchers during January and August of each fiscal year.
AutoNDA by SimpleDocs
Heavy Pavement/Undulation Crew. For each unit member assigned for at least six (6) consecutive months to either the Heavy Pavement Crew or the Undulation Crew in the Maintenance Services Department, the City shall provide a voucher from the City designated department for up to $200 toward the cost of acquiring two (2) pairs of safety shoes and related supplies through the City vendor. Effective January 1, 2005, the City shall provide a voucher from the City designated department for up to $230 annually toward the cost of acquiring two (2) pairs of safety shoes and related shoe supplies. The City shall provide the vouchers during January and August of each fiscal year.

Related to Heavy Pavement/Undulation Crew

  • Heavy Blocks An employee shall not be required to lift a building block in excess of 20 kg in weight unless such employee is provided with a mechanical aid or with an assisting employee; provided that an employee shall not to manually lift any building block in excess of 20 kg weight to a height of more than 4 feet (1.2m) above the working platform.

  • Pavement The combined surface course, base course, and subbase course, if any, considered as a single unit.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • Switching and Tagging Rules Each Party shall provide the other Parties a copy of its switching and tagging rules that are applicable to the other Parties’ activities. Such switching and tagging rules shall be developed on a non-discriminatory basis. The Parties shall comply with applicable switching and tagging rules, as amended from time to time, in obtaining clearances for work or for switching operations on equipment.

  • Basement Any leaks or evidence of moisture? Yes No Unknown Does Not Apply Comments:

  • Cutting, Patching, and Fitting The Contractor shall do all cutting, patching, and fitting of the Work that may be required to make its several parts come together properly and fit.

  • Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.

  • Completion of Concrete Pours and Emergency Work 24.14.1 Except as provided in this sub-clause an employee shall not work or be required to work in the rain.

  • Clearcutting Units All trees that meet Utilization Standards within “Clearcutting Units” are designated for cutting.

  • Rate Center Area The geographic area that has been identified by a given LEC as being associated with a particular NPA-NXX code assigned to the LEC for its provision of Telephone Exchange Services. The Rate Center Area is the exclusive geographic area that the LEC has identified as the area within which it will provide Telephone Exchange Services bearing the particular NPA-NXX designation associated with the specific Rate Center Area.

Time is Money Join Law Insider Premium to draft better contracts faster.