Hydro-Electric Unit Tests Sample Clauses

Hydro-Electric Unit Tests. (i) The test period for hydro-electric units, including pumped-hydro units, will be not less than one hour.
AutoNDA by SimpleDocs

Related to Hydro-Electric Unit Tests

  • Information Systems Acquisition Development and Maintenance a. Client Data – Client Data will only be used by State Street for the purposes specified in this Agreement.

  • Fuel Upon redelivery of the Aircraft to Lessor, an adjustment will be made in respect of fuel on board on the Previous Delivery Date and the Expiry Date at the price then prevailing at the Redelivery Location.

  • Engineering Services The Borrower’s Engineer will provide engineering services covering planning and design, operation of the System, and the supervision and inspection of the construction of the Project. The Borrower’s Engineer will provide to the Department the certificate required by Section 3.4.

  • Plant An electrical generating alternative energy resource facility developed by Producer for which IID shall provide transmission service, as specified in Exhibit(s) II, Transmission Service, and in any subsequent Plant Amendments.

  • ELECTRICAL SERVICES A. Landlord shall provide electric power for a combined load of 3.0 xxxxx per square foot of useable area for lighting and for office machines through standard receptacles for the typical office space.

  • Infrastructure (a) The Borrower has and will maintain a sufficient infrastructure to conduct its business as presently conducted and as contemplated to be conducted following its execution of this Agreement.

  • Condominiums/Planned Unit Developments If the Mortgaged Property is a condominium unit or a planned unit development (other than a de minimis planned unit development) such condominium or planned unit development project such Mortgage Loan was originated in accordance with, and the Mortgaged Property meets the guidelines set forth in the Originator's Underwriting Guidelines;

  • Development Funding (a) Viewray will pay 3D Line the then U.S. Dollar equivalent of €[***] within three (3) days of the Effective Date for the engineering services required to develop/ deliver the Deliverable described in Section 2.1(a)(i).

  • Mission Block Fuel The block fuel for a stage length of 2,050 nautical miles in still air (representative of a route with a 4.4 hour flight time from a sea level airport) with a zero fuel weight of 154,221 kilograms, using the conditions and operating rules defined below, shall not be more than the following guarantee value: NOMINAL: [*] Kilograms TOLERANCE: [*] Kilograms GUARANTEE: [*] Kilograms Conditions and operating rules:

  • Interconnection If Manager desires to interconnect a portion of the Service Area Network with another carrier and Sprint PCS can interconnect with that carrier at a lower rate, then to the extent permitted by applicable laws, tariffs and contracts, Sprint PCS may arrange for the interconnection under its agreements with the carrier and if it does so, Sprint PCS will xxxx the interconnection fees to Manager.

Time is Money Join Law Insider Premium to draft better contracts faster.